Slide 3: June Quarter Highlights
June Quarter Highlights • Record quarterly gold production of 61,835oz, up 2% on the March quarter at total cash cost of US$744/oz. • Record annual gold production of 208,760oz, up 85% on FY11 (113,134oz) at a total cash cost of US$720/oz. • Strong operating performance at Chatree with gold producti
Slide 4: Chatree
Chatree Good Operational 42,188oz up 9% on Mar (38,721oz) 1,615Kt @ 0.96g/t up 4% on March Q Performance C North high grade zone completed Total cash costs US$625/oz Total Cash Costs (incl. US$162/oz royalty) from Mar Qtr US$626/oz (US$626/oz incl US$167/oz) Lower by-product credit Overall plant ope
Slide 5: Challenger
Challenger 164Kt @ 4.04g/t (171Kt @ 4.32g/t) Gold Production Low equipment availability and 19,647oz dilution plus leach tank gearbox Total cash costs US$1,000/oz Total Cash Costs (incl. US$59/oz royalty) from March US$1,000/oz US$955 (incl. US$62 royalty) Challenger West stope (800 level) Challenge
Slide 6: Challenger Exploration Drilling
Challenger Exploration Drilling Good results continue below ’79 Fault’ Challenger West 800 level stope meets expectations New shoot, Aminus 2, identified within Challenger West corridor
Slide 7: Nueva Esperanza
Nueva Esperanza Teterita metallurgical work underway. Resource Drilling Two drillholes completed at Chimberos Camp reduced for winter . Integrated mine for Arqueros and Teterita progressing. Feasibility Study Ausenco appointed to take feasibility through to definitive stage. Environmental The EIA pr
Slide 8: Nueva Esperanza: Resource drilling at Chimberos
Nueva Esperanza Resource drilling at Chimberos
Slide 9: Bowdens Drilling
Bowdens Drilling Mineralisation intersected outside current pit shell Resource drilling continues to intersect mineralisation outside current resource Assays include 45m @ 117.8 AgEq and 40m @ 96.1 AgEq Metallurgical testing of Bowdens drill core underway Feasibility and preliminary EIS expe
Slide 10: Outlook
Outlook • Gold production for FY13 expected to exceed FY12. • Chatree production to benefit from higher throughput but at lower grade. • Challenger expected to perform in-line with FY12. • Nueva Esperanza technical feasibility will follow completion of metallurgical test-work and new mine plan. • Bo
Slide 11: Kingsgate Consolidated Limited
Kingsgate Consolidated Limited Shares: 151 Million Market Cap: ~A$800M ASX: KCN www.kingsgate.com.au
Slide 12: Appendix: General Disclaimer
Appendix General Disclaimer: The information contained in this presentation is for informational purposes only and does not constitute an offer to issue, or arrange to issue securities or other financial products. The information contained in this presentation is not investment or financial product
Slide 13: Chatree
Chatree Chatree Ore Reserves as at 30 June 2011 (>0.4g/t gold cut-off grade) Gold Silver Gold Silver Tonnes Source Category Grade Grade Contained Contained (millions) (g/t) (g/t) (Moz) (Moz) From Pits Proven 36.0 0.99 8.5 1.14 9.9 Probable 15.6 0.97 7.0 0.49 3.5 Stockpiles 8.4 0.69 11.7 0.19 3.3 Cha
Slide 14: Challenger
Challenger Challenger Ore Reserves as at 30 June 2011 Gold Gold Tonnes Source Category Grade Contained (thousands) (g/t) (‘000 oz) From Mine Proven 600 4.46 90 Probable 2,740 5.94 520 Challenger Total Total 3,340 5.67 610 Challenger Mineral Resources as at 30 June 2011 Gold Gold Tonnes Source Catego
Slide 15: Nueva Esperanza
Nueva Esperanza Mineral Indicated Inferred Total Resources >0.5g/t Tonnes Gold Silver Tonnes Gold Silver Tonnes Gold Silver Gold Silver Gold Eq AuEq M g/t g/t M g/t g/t M g/t g/t MOz MOz MOz Arqueros 16.0 0.32 81 4.0 0.3 50 20.0 0.32 75 0.20 48.1 1.3 Chimberos 3.7 0.2 85 3.7 0.20 85 0.02 10.1 0.2 Te
Slide 16: Bowdens
Bowdens Cut-off Grade Contained Silver Resource AgEq Tonnes Silver Lead Zinc AgEq Silver AgEq Class (g/t) (t) g/t % % g/t (Moz) (Moz) Indicated 30 31.2 60.6 0.30 0.40 77.5 60.8 78 Inferred 30 27.0 44.0 0.30 0.40 61.0 38.7 53 Indicated & 30 58.2 52.9 0.30 0.40 69.8 99.4 131 Inferred Notes: 1. Roundin