Kingsgate Consolidated Limited · ASX:KCN

Kingsgate Consolidated — Q2 2012 Earnings Presentation

16 slides from Kingsgate Consolidated's earnings presentation, July 2012

  1. Slide 1: Kingsgate Consolidated Limited June Quarter 2012

    Kingsgate Consolidated Limited June Quarter 2012

  2. Slide 2: Disclaimer

    Disclaimer Forward Looking Statements: These materials include forward looking statements. Forward looking statements inherently involve subjective judgment & analysis & are subject to significant uncertainties, risks & contingencies, many of which are outside of the control of, & may be unknown to,

  3. Slide 3: June Quarter Highlights

    June Quarter Highlights • Record quarterly gold production of 61,835oz, up 2% on the March quarter at total cash cost of US$744/oz. • Record annual gold production of 208,760oz, up 85% on FY11 (113,134oz) at a total cash cost of US$720/oz. • Strong operating performance at Chatree with gold producti

  4. Slide 4: Chatree

    Chatree Good Operational 42,188oz up 9% on Mar (38,721oz) 1,615Kt @ 0.96g/t up 4% on March Q Performance C North high grade zone completed Total cash costs US$625/oz Total Cash Costs (incl. US$162/oz royalty) from Mar Qtr US$626/oz (US$626/oz incl US$167/oz) Lower by-product credit Overall plant ope

  5. Slide 5: Challenger

    Challenger 164Kt @ 4.04g/t (171Kt @ 4.32g/t) Gold Production Low equipment availability and 19,647oz dilution plus leach tank gearbox Total cash costs US$1,000/oz Total Cash Costs (incl. US$59/oz royalty) from March US$1,000/oz US$955 (incl. US$62 royalty) Challenger West stope (800 level) Challenge

  6. Slide 6: Challenger Exploration Drilling

    Challenger Exploration Drilling Good results continue below ’79 Fault’ Challenger West 800 level stope meets expectations New shoot, Aminus 2, identified within Challenger West corridor

  7. Slide 7: Nueva Esperanza

    Nueva Esperanza Teterita metallurgical work underway. Resource Drilling Two drillholes completed at Chimberos Camp reduced for winter . Integrated mine for Arqueros and Teterita progressing. Feasibility Study Ausenco appointed to take feasibility through to definitive stage. Environmental The EIA pr

  8. Slide 8: Nueva Esperanza: Resource drilling at Chimberos

    Nueva Esperanza Resource drilling at Chimberos

  9. Slide 9: Bowdens Drilling

    Bowdens Drilling Mineralisation intersected outside current pit shell  Resource drilling continues to intersect mineralisation outside current resource  Assays include 45m @ 117.8 AgEq and 40m @ 96.1 AgEq  Metallurgical testing of Bowdens drill core underway  Feasibility and preliminary EIS expe

  10. Slide 10: Outlook

    Outlook • Gold production for FY13 expected to exceed FY12. • Chatree production to benefit from higher throughput but at lower grade. • Challenger expected to perform in-line with FY12. • Nueva Esperanza technical feasibility will follow completion of metallurgical test-work and new mine plan. • Bo

  11. Slide 11: Kingsgate Consolidated Limited

    Kingsgate Consolidated Limited Shares: 151 Million Market Cap: ~A$800M ASX: KCN www.kingsgate.com.au

  12. Slide 12: Appendix: General Disclaimer

    Appendix General Disclaimer: The information contained in this presentation is for informational purposes only and does not constitute an offer to issue, or arrange to issue securities or other financial products. The information contained in this presentation is not investment or financial product

  13. Slide 13: Chatree

    Chatree Chatree Ore Reserves as at 30 June 2011 (>0.4g/t gold cut-off grade) Gold Silver Gold Silver Tonnes Source Category Grade Grade Contained Contained (millions) (g/t) (g/t) (Moz) (Moz) From Pits Proven 36.0 0.99 8.5 1.14 9.9 Probable 15.6 0.97 7.0 0.49 3.5 Stockpiles 8.4 0.69 11.7 0.19 3.3 Cha

  14. Slide 14: Challenger

    Challenger Challenger Ore Reserves as at 30 June 2011 Gold Gold Tonnes Source Category Grade Contained (thousands) (g/t) (‘000 oz) From Mine Proven 600 4.46 90 Probable 2,740 5.94 520 Challenger Total Total 3,340 5.67 610 Challenger Mineral Resources as at 30 June 2011 Gold Gold Tonnes Source Catego

  15. Slide 15: Nueva Esperanza

    Nueva Esperanza Mineral Indicated Inferred Total Resources >0.5g/t Tonnes Gold Silver Tonnes Gold Silver Tonnes Gold Silver Gold Silver Gold Eq AuEq M g/t g/t M g/t g/t M g/t g/t MOz MOz MOz Arqueros 16.0 0.32 81 4.0 0.3 50 20.0 0.32 75 0.20 48.1 1.3 Chimberos 3.7 0.2 85 3.7 0.20 85 0.02 10.1 0.2 Te

  16. Slide 16: Bowdens

    Bowdens Cut-off Grade Contained Silver Resource AgEq Tonnes Silver Lead Zinc AgEq Silver AgEq Class (g/t) (t) g/t % % g/t (Moz) (Moz) Indicated 30 31.2 60.6 0.30 0.40 77.5 60.8 78 Inferred 30 27.0 44.0 0.30 0.40 61.0 38.7 53 Indicated & 30 58.2 52.9 0.30 0.40 69.8 99.4 131 Inferred Notes: 1. Roundin

Kingsgate Consolidated — Q2 2012 Earnings Presentation on 6ix