Fitzroy Minerals Inc · TSXV:FTZ
Fitzroy Minerals — Investor Presentation (November 2026)
17 slides from Fitzroy Minerals's investor presentation, November 2026

Slide 1: Fitzroy Minerals - Big Copper in Chile
TSX-V: FTZ OTCQX: FTZFF FITZROY MINERALS - BIG COPPER IN CHILE DERISKING MILESTONES: ASYMMETRIC RISK PROFILE NOVEMBER 2026 TSX-V: FTZ OTCQX: FTZFF Fitzroyminerals.com

Slide 2: Cautionary Statement on Forward-Looking Information
TSX-V: FTZ CAUTIONARY STATEMENT ON OTCQX: FTZFF FORWARD-LOOKING INFORMATION This presentation is not directed to, or intended for distribution to or use by, any person or entity that is a citizen or resident or located in any locality, state, country or other jurisdiction where such distribution, pu

Slide 3: Chile, World #1 Copper Endowment & Industry
TSX-V: FTZ CHILE, WORLD #1 COPPER ENDOWMENT & INDUSTRY OTCQX: FTZFF MINING AT THE CORE OF ECONOMY & GOVERNMENT policy President Kast "fewer permits, more investment“ 23% of Global Cu Mining: 59% of Mine Supply Total Exports “state as a facilitator of private 5.3 Mt Cu in 2025 (o/w 80% is development

Slide 4: Two Core Copper Projects Driving Capital Value
TSX-V: FTZ TWO CORE COPPER PROJECTS DRIVING CAPITAL VALUE OTCQX: FTZFF BUEN RETIRO OFFERS RERATE & CASH FLOW; CABALLOS LARGE-SCALE DISCOVERY POTENTIAL BUEN RETIRO (IOCG) CABALLOS IRON OXIDE COPPER GOLD Cu-Mo-Au-Re PORPHYRY Near-Term Production Plan: • Grass-roots Discovery • Metallurgical Test Work

Slide 5: Buen Retiro - District-Scale Mineralization
TSX-V: FTZ BUEN RETIRO - DISTRICT-SCALE MINERALIZATION OTCQX: FTZFF AT LOW ELEVATION WITH GREAT INFRASTRUCTURE AND NO INHABITANTS Buen Retiro Potential f itzro ym i nera ls .c om 5

Slide 6: Buen Retiro: Near-Term Production Plan
TSX-V: FTZ BUEN RETIRO: NEAR-TERM PRODUCTION PLAN OTCQX: FTZFF CASH FLOW FROM CONVENTIONAL & ENHANCED RECOVERY HEAP LEACH, SX/EW Drilling highlights* BRT-DDH022 110 m @ 1.94% Cu BRT-DDH006 135 m @ 0.73% Cu BRT-DDH059 78 m @ 1.70% Cu Milestone Delivery Plan Preliminary Metallurgy Q3 2026 Maiden MRE Q

Slide 7: Exemplary Mineralogy, Continuity and Geometry
TSX-V: FTZ EXEMPLARY MINERALOGY, CONTINUITY AND GEOMETRY OTCQX: FTZFF MINERAL PROCESSING CARRIED OUT BY NATURE OVER TIME (BLACK) OXIDE ZONE (GREEN) OXIDE ZONE SUPERGENE-MIXED HYPOGENE ZONE Tenorite, copper wad, pitch limonite Chrysocolla, atacamite, malachite, azurite Chalcocite, native copper Chalc

Slide 8: Metallurgy: A Strong Heap Leach Response
TSX-V: FTZ METALLURGY: A STRONG HEAP LEACH RESPONSE OTCQX: FTZFF 247 TESTS ON >5 T OF MATERIAL AT SGS LABORATORIES: OXIDES AND MIXED ORE No. of Weight Completion Copper recovery, mini-columns (21 days) Latest 1 m column results (after 99 days) TEST Tests (kg) / Test Date Net acid, ISO-ph 45 1 ✓ Unit

Slide 9: Targeting Sulphide Potential with AI
TSX-V: FTZ TARGETING SULPHIDE POTENTIAL WITH “AI” OTCQX: FTZFF AMBIENT NOISE TOMOGRAPHY: 200 GEODES IMAGE STRUCTURE TO >1 KM DEPTH Ambient Noise • Passive seismic Tomography • Machine Learning / AI combines geophysics, geology and geochemistry to generate targets in (ANT) survey untested areas 2500

Slide 10: Caballos: A New Chilean Porphyry Discovery?
TSX-V: FTZ CABALLOS: A NEW CHILEAN PORPHYRY DISCOVERY? OTCQX: FTZFF KNOWN Cu-Mo-Au MINERALIZATION LINKED TO A LARGE CONCEALED SYSTEM Mineralized Breccias 2,000 m elevation “Porphyry” in clasts Main anomalies >14 km strike 18,000 ha ‘Pocuro Fault Zone’ Strategic licences Caballos f itzr o ym i ner a

Slide 11: Caballos: A Fertile System in a Fertile Corridor
TSX-V: FTZ CABALLOS: A FERTILE SYSTEM IN A FERTILE CORRIDOR OTCQX: FTZFF SIZE OF THE PRIZE (HUGE), COST OF THE TEST (LOW), CHANCE OF SUCCESS (HIGH) CAB-DDH001 2001 m @ 0.81% CuEq2 from 66 m 1 True widths of the intercepts are estimated to be ~75% of down-hole intervals. 2 Copper Equivalent (“CuEq”)

Slide 12: A High Impact 12 Months Ahead
TSX-V: FTZ A HIGH IMPACT 12 MONTHS AHEAD OTCQX: FTZFF MULTIPLE VALUATION CATALYSTS: PEA & PFS DE-RISKING & EXPLORATION DRILL RESULTS Q4 2026 Q1 2027 Q2 2027 Q3 2027 Q4 2027 Heap Leach Exploration Baseline Study & Metallurgy DIA Submission Buen Retiro Copper PEA / MRE / Engineering Chile PFS (Initial

Slide 13: Rerate and Discovery Potential
TSX-V: FTZ RERATE AND DISCOVERY POTENTIAL OTCQX: FTZFF14 BUEN RETIRO LOW-RISK VALUE PATHWAY; CABALLOS CAN TURBO-CHARGE PERFORMANCE LOW CAPEX “RERATE” PEERS “DISCOVERY” PEERS COMPANY MILESTONES 1Y RERATE PROJECT COMPANY SHARE PRICE RESULT PROJECT Placement, PFS, C$0.46 to Cabaçal, 60m @ 7.52% Lunahua

Slide 14: De-risking Milestones Towards Re-rating
TSX-V: FTZ DE-RISKING MILESTONES TOWARDS RE-RATING OTCQX: FTZFF14 AMBITION: CASH FLOW TO FUND NON-DILUTIVE EXPLORATION & SECURE AUTONOMY $0.70 342.5 M shares $0.60 Cash 33.4 M options C$19.0 M $0.50 Issued Share Capital $0.40 33.0 M warrants Mkt Cap $0.30 Nov 25 Jan 26 Mar 26 May 26 Jul 26 Sep 26 No

Slide 15: An Experienced Team Focused on Delivering
AN EXPERIENCED TEAM FOCUSED ON DELIVERING TSX-V: FTZ OTCQX: FTZFF HIGH VALUE, NON-DILUTIVE COPPER OPTIONALITY ON A PER SHARE BASIS CAMPBELL SMYTH QUEENIE KUANG JOHN SEAMAN, ICD.D CHAIRMAN, DIRECTOR CHIEF FINANCIAL OFFICER NON-EXECUTIVE DIRECTOR MARY GILZEAN NON-EXECUTIVE DIRECTOR MERLIN MARR-JOHNSON

Slide 16: Big Copper in Chile
TSX-V: FTZ OTCQX: FTZFF TSX-V: FTZ OTCQX: FTZFF info@fitzroyminerals.com www.fitzroyminerals.com BIG COPPER IN CHILE RERATE BACK-STOP ASYMMETRIC RISK PROFILE MERLIN MARR-JOHNSON President and CEO +44 (0) 7803712280 mmj@fitzroyminerals.com

Slide 17: Appendix: Pucobre to Claw-Back 30% by Paying Back 90%
TSX-V: FTZ APPENDIX: PUCOBRE TO CLAW-BACK 30% BY PAYING BACK 90% OTCQX: FTZFF FITZROY MINERALS EFFECTIVELY GETTING PAID TO EXPLORE AND DEVELOP TO PFS (Q2 2027) C$23.9 M Treasury 2026 C$2.8 M Warrants/ Options (25c) 30,000 m Exploration / De-risking ~C$20 M Cash Back? 2027 C$1.7 M Warrants/ Options (
Source: company website
More decks from Fitzroy Minerals Inc
Investor Presentation (September 2026)14 slides · September 2026
Investor Presentation (August 2026)15 slides · August 2026
Investor Presentation (May 2026)15 slides · May 2026
Investor Presentation (April 2026)20 slides · April 2026
Investor Presentation (February 2026)24 slides · February 2026
Investor Presentation (December 2025)22 slides · December 2025