Centaurus Metals Limited · ASX:CTM

Centaurus Metals — Centaurus Resources — Investor Presentation (November 2008)

20 slides from Centaurus Metals's investor presentation, November 2008

  1. Slide 1: Centaurus Resources Limited

    Centaurus Resources Limited November 2008

  2. Slide 2: Forward Looking Statements

    Statements 2 Forward Looking Statements This presentation includes certain “forward looking statements.” All statements, other than statements of historical fact, are forward looking statements that involve various risks and uncertainties. There can be no assurances that such statements will prove a

  3. Slide 3: Company Structure

    Company Structure 3 @ 31 October 08 Shares on issue 30,555,548 Unlisted Options 6,650,000 Market AU $30.5m Capitalisation Share Price AU $1.00 Listed 10 August 2007 3

  4. Slide 4: The Board

    The Board 4 Darren Gordon Richard Hill Mark Papendieck Dr Klaus Petersen Stephen Woodham Chairman Exec Director Managing Director Exec Director Director 15 years experience 16 years Over the last decade, Mr 20 years experience 15 Years experience financial reporting and Resource Industry Papendieck

  5. Slide 5: Carbon Steel Strategy - Brazil

    Carbon Steel Strategy - Brazil 5 Near Term Production in a BRIC Economy Iron Ore • Production by 2010 – Targeting low cap-ex/op-ex Itabirite projects – Targeting 1Mtpa at two operations • Building +250Mt resource base Manganese • Exploration Upside from significant ground position in prospective Man

  6. Slide 6: IQ – Projects & Infrastructure

    IQ – Projects & Infrastructure 6 Centaurus Projects 1. 1. Itambe Itambe MINAS GERAIS 2. 2. Passabem Passabem 3. 3. Ferros Ferros 4. 4. Liberdade Liberdade 5 6 55 Ponte Ponte dede Pedra Pedra 2 6 Serra do Bicho 3 6 Serra do Bicho Brazil 1 4 BELO HORIZONTE ESPIRITO SANTO 150kms Large City MINAS GERAIS

  7. Slide 7: Projects

    Projects 7 Monjolos DIAMANTINA Serra Serra do do Brazil Ponte Ponte de de Bicho Bicho Pedra Pedra CURVELO Guanhães Large City Conceição do Mato Dentro Minas-Rio Minas-RioProject Project Town Morro Morrodo doPilar PilarProject Project Highway Ferros Ferros Road Itambe Itambe Passabem Railway Passabem

  8. Slide 8: Regional Itabirite Projects

    Regional Itabirite Projects 8 • Low development costs • Low mining and beneficiation costs • Similar highly friable ore across CUR projects • Proven beneficiation characteristics • Cash flow positive projects based on conservative mine gate sale. • Strong domestic demand • Export grade product >63.5

  9. Slide 9: Liberdade Project Case Study

    Liberdade Project Case Study 9 Liberdade ROM Financials USD Fe% SiO2% P% Al203% Mn% Capital Expenditure <$5m 37 43.52 0.03 2.21 0.02 Mining $5-6/t Beneficiation $1-2/t Upgradeable* to: Fe% SiO2% P% Al203% Mn% 67 2.38 0.01 0.50 0.02 Product Baseline Mine Gate Price (USD) Lump $60 Sinter $30 *results

  10. Slide 10: Multiple Local Fe Projects

    Multiple Local Fe Projects 20kms 10 Itambé 20 20 Mtpa Mtpa Conceição do Mato Dentro (by (by 2010) 2010) • Targeting 1Mtpa production 2010 Ferros Ferros Passabem Morro Morrodo doPilar PilarProject Project Passabem Passabem • Targeting 1Mtpa production 2010 Passabem Ferros • Potential being defined It

  11. Slide 11: Near Production Projects

    Near Production Projects 11 Itambé • Phase 1 drilling complete at Itambé-1 • Concurrently: – Applying for mining lease – Commencing desk top study – Designing future drilling phases at Itambé-1 Passabem • Laterally continuous 4km iron formation • Short drill program designed to define JORC compliant

  12. Slide 12: Itambe – Magnetics & Geology

    Itambe – Magnetics & Geology Banded Iron Formation 12 500m Proposed drillhole Alluvium Drillhole – In progress Gabroic Rock Al Alluvium Drillhole - Completed Quartzite Q Quartzite G Sericite-Quartz-Schist MS Mica-quartz schist IF Iron Formation G Gabbro MS 200m G G IF N DD10 IF MS Al G See Geologica

  13. Slide 13: Passabem Project

    Passabem Project 13 Granted Tenement Application Tenement 76 Passabem North 64 Rolled blocks of Iron Formation 80 PSB-X Iron Formation Granitoid Passabem Mica schist PSB-1 50 Sample Location 39 Dip & direction of foliation 40 Fault Road, Track Watercourse 51 36 780 RL Schematic X-Section 45 540 RL 3

  14. Slide 14: Fe Production - Target Time Line

    Fe Production - Target Time Line 14 Dec 08 Jun 09 Dec 09 Jun 10 Desktop PFS: Mine Ability to produce study -Infrastructure establishment up to 300Ktpa per commences review commences site prior to licence Application for mining - Environmental licensing begins PRODUCTION 2nd leases HALF 2010 Targetin

  15. Slide 15: Exploration Upside - Manganese

    Exploration Upside - Manganese 15 • Seeking to define significant primary and hydrothermal Mn mineralisation at Ponte de Pedra-1 & 2. • Encouraging early exploration results: – Correlating resistivity/ chargeability anomalies throughout survey area – Primary Mn outcrops – Rock Chips – Hydrothermal a

  16. Slide 16: Ponte de Pedra Project

    Ponte de Pedra Project 16 Brazil Acquisition Tenements Recent Centaurus Applications PdP-1 Excluded Area Area of initial IP Survey Historical Workings Rockchip Sample Córrego Pereira Formation Córrego dos Borges Formation Rio Pardo Grande Formation PdP-2 Macaúbas Group Lateritic Cover (Mn rich) Mn-p

  17. Slide 17: Ponte de Pedra – Mn Geological Model

    Ponte de Pedra – Mn Geological Model 17 17

  18. Slide 18: Brazil – A BRIC Economy

    Brazil – A BRIC Economy 18 • Behind China, Brazil is fastest growing top 10 producer of crude steel1 • Brazils steel production grew 7.3% in the first nine months of 20082 • Usiminas, the largest smelter in Brazil, is investing US$14 billion to increase production by 30% in Minas Gerais • Minas Gera

  19. Slide 19: 12 Month Growth Plan

    12 Month Growth Plan 19 Iron • Path to Production: – JORC resources – Desk top studies/Feasibility studies – Mining Leases • Exploration growth at near production projects & throughout broader tenement package Manganese • JORC resource at Ponte de Pedra Corporate • Cash from sale of Liberdade in1st

  20. Slide 20: Centaurus Resources

    Centaurus Resources An Emerging Iron Ore Producer Contacts: Darren Gordon  darren.gordon@centaurus.com.au  +618 9321 6201 Mark Papendieck  mark@centaurus.com.au  +55 31 9244 1374 Richard Hill  richard@centaurus.com.au  +618 9321 6201