Welspun Enterprises — Q2 FY25 Earnings Presentation

48 slides from Welspun Enterprises's earnings presentation, Oct 29, 2024

  1. Slide 1: Exchange filing cover letter for investor presentation

    WEL/SEC/2024 October 29, 2024 To, BSE Limited National Stock Exchange of India Limited 1st Floor, Rotunda Bldg, Exchange Plaza, C-1, Block-G, Dalal Street, Fort, Bandra Kurla Complex, Bandra (East), Mumbai - 400 001. Mumbai - 400 051. Scrip Code: 532553 NSE Symbol: WELENT Dear Madam/ Sir, Subject: I

  2. Slide 2: Welspun Enterprises Limited Q2FY25 Investor Presentation

    WELSPUN ENTERPRISES LIMITED Q2FY25 Investor Presentation 29th October 2024 BSE: 532553 | NSE: WELENT |ISIN: INE625G01013 1

  3. Slide 3: Safe Harbor

    Safe Harbor The information contained in this presentation is provided by Welspun Enterprises Limited (the “Company”). Although care has been taken to ensure that the information in this presentation is accurate, and that the opinions expressed are fair and reasonable, the information is subject to

  4. Slide 4: Welspun Enterprises At a Glance

    Welspun Enterprises At a Glance FINANCIAL STRENGTH ROBUST ORDER BOOK HEALTHY PROFITABILITY  ~20% Revenue CAGR  ₹ ~15,200 Cr.*Consolidated  Higher profitability - average (FY2021-24) Order Book PAT margin for last 4 years ~13.3%  ₹866 Cr. Cash on Hand  Focused on execution  Returned ~₹ 800 cror

  5. Slide 5: Inside this Presentation

    Inside this Presentation About Welspun World 05 Advantage Welspun Enterprises Ltd. 06 Financials Q2FY25 13 Opportunities Ahead 17 Welspun Michigan Enterprises Ltd. 22 WEL – ESG At the Core 26 Summary Historical Financials 30 Appendix – Project & Investment Details 35 Industrial Water Treatment Plant

  6. Slide 6: Global Conglomerate: Welspun Group

    Global Conglomerate The USD 3.6 Bn Welspun Group is one of India’s fastest growing global conglomerates with business interests in Line Pipes, Home Textiles, Infrastructure, Steel, Advanced Textiles, Warehousing and Flooring Global leader in Home Textiles Amongst world’s largest Line-Pipe manufactur

  7. Slide 7: Advantage Welspun Enterprises

    Advantage Welspun Enterprises 6 This is a 3-D Render of Dharat WwTF

  8. Slide 8: Creating Value through a Clear Strategy

    Creating Value through a Clear Strategy Municipal Water Treatment Remain “Asset Light” Bid for selective + projects Industrial Water Ensure P&L Treatment supports new business Sewerage Asset Deploy right mix Monetization of contractors & Treatment Monetize balance support them for sheet heavy seamle

  9. Slide 9: Through an experienced Management

    Through an experienced Management Sandeep Garg Saurin Patel Asim Chakraborty MD – WMEL CEO (Transportation) Managing Director Masters in Structural Engineering with ~40 years Civil Engineer with ~4 decades of experience Harvard Business School and IIT (Roorkee) of experience in niche engineering. Ci

  10. Slide 10: Proven track record

    Proven track record ₹ 3,900 cr. Delhi Meerut Expressway ~570 km Experience of operating ~65 km Welspun Enterprises’ completed portfolio ~570 km of Toll projects includes the Delhi–Meerut Expressway / Robust road portfolio National Expressway 3 which was featured as an Engineering Marvel of India Cap

  11. Slide 11: Awards, Accreditation & Accolades

    Awards, Accreditation & Accolades Letter of appreciation by ASSOCHAM Unique Project of “Gold award” in Excellence in Prime Minister of India the Year Award presented by Project Management under PPP Shri Narendra Modi Shri Nitin Gadkari mode from MoRTH 15th CIDC Vishwakarma Awards - Construction HSE

  12. Slide 12: Strong platform set for future growth

    Strong platform set for future growth Robust portfolio of ~₹ 15,200 Cr.* Current order book at Water, Tunnelling, Road (excluding GST) & WMEL Segment Break-up Order Book By Source 92% EXTERNAL Water 63% Road 13% WMEL 11% Tunnelling CAPTIVE 13% (HAM Projects) 8% Current Order Book provides strong rev

  13. Slide 13: Way forward: Trends towards Diversification

    Trends towards Diversification Trend in Order Book By Source WEL Portfolio (in ₹ Cr.) Captive External Tunnelling (HAM) EPC 13% 15,200 EPC, 4% 21% 9,049 FY17 Water Q2FY25 EPC Road EPC 3,900 57% 9% Captive (HAM), 96% Development Orderbook* Development (Divested) Way Continue approach of prudent bid s

  14. Slide 14: Financials

    Financials 13

  15. Slide 15: Income Statement Snapshot - Standalone

    Income Statement Snapshot - Standalone Particulars (₹ Cr.) Q2 FY25 Q2 FY24 YoY % H1FY25 H1FY24 YoY % ~20% Revenue CAGR over Revenue from last 4 years 663 542 22% 1,409 1,223 15.2% Operations ~30% EBITDA CAGR over Other Income 25 29 -13% 55 57 -4.5% last 4 years Total Income 688 571 20% 1,464 1,281 1

  16. Slide 16: Income Statement Snapshot - Consolidated

    Income Statement Snapshot - Consolidated ~23% Revenue CAGR over Particulars (₹ Cr.) Q2 FY25 Q2 FY24 YoY % H1FY25 H1FY24 YoY % last 4 years Total Income 838 693 21% 1,798 1,443 25% ~25% EBITDA CAGR over last 4 years EBITDA 150 130 16% 343 286 20% Average PAT margin of 14% EBITDA margin 17.9% 18.7% -8

  17. Slide 17: Balance Sheet Snapshot - Standalone

    Balance Sheet Snapshot - Standalone Returned ~INR 800 crores Balance Sheet Snapshot (₹ Cr.) 30th September2024 31st March 2024 through buyback & dividends over FY18-FY24 Net worth 2,533 2,422 Gross Debt 3 0 Grew Networth at ~10% CAGR over 4 years, post - Long Term Debt - - paybacks - Short Term Debt

  18. Slide 18: Opportunities Ahead

    Opportunities Ahead 17

  19. Slide 19: Water Opportunity – Targeted for Growth

    Water Opportunity – Targeted for Growth ₹ 3.6 tn Across Focus Segments  Identified clear segmented opportunities at nascent stage India’s water challenge catering to ~18% of world  Curating solutions leveraging group population with ~4% or synergies. world’s fresh water resources.  Cultivate and

  20. Slide 20: Industry dynamics - Water Sector

    Industry dynamics - Water Sector Urban Water & Sanitation - Additional ₹ 12.6 tn capital expenditure GoI targets households with to be spent in building Water piped-water supply in rural ₹3.3 tn ~₹ 699 bn Infrastructure areas Will be spent in building Urban Water Infrastructure Allocated for piped (

  21. Slide 21: Transport Opportunities – Targeted for Growth

    Transport Opportunities – Targeted for Growth ₹ 3.0 tn Across Focus Segments India’s length of NH will  Target projects that meet double from 146,145 over internal return threshold the next 5 years  Ensure selection of projects Public Private Partnerships with higher complexity & is the way forwar

  22. Slide 22: Industry dynamics - Roads Sector

    Industry dynamics - Roads Sector Attractive Opportunities & Road Construction NHAI Awards and Strong Policy support Per Day (km) Execution (km)* 6,644 6,318 6,306 12,349 Km 18% 37 5,337 35 18% of projected infrastructure 34 National Highways has expanded 4,788 investment of ₹111 trillion in by 12,34

  23. Slide 23: Welspun Michigan Engineers Ltd. (WMEL)

    Welspun Michigan Engineers Ltd. (WMEL)* *(Formerly known as Michigan Engineers Private Limited) 22

  24. Slide 24: About Welspun Michigan Engineers Ltd. (WMEL)

    About Welspun Michigan Engineers Ltd. (WMEL) WMEL, now part of Welspun Pioneer and leader in the Strong working relationships An integral aspect of our World was established in niche segment of Trenchless with Municipal Corporations operations is vertical 1973. WMEL is positioned as Technology in In

  25. Slide 25: Proven track record (WMEL)

    Proven track record (WMEL)  Tunneling teams can  Successful track record of execute projects requiring executing numerous projects  Strong vertical integration pipes ranging from 450 across India’s largest with in-house engineering, mm diameter to 3850 mm Metropolitan cities including fabrication

  26. Slide 26: Welspun Michigan Engineers (WMEL) - Snapshot

    Welspun Michigan Engineers (WMEL) - Snapshot Acquisition by Welspun Enterprises in August 2023 – Mr. Saurin Patel has led WMEL into New Segments to Expertise and reach of Welspun Group to transform cater to Emerging Needs in India Growth Trajectory Financial Snapshot Unexecuted Order book of ~ 1,600

  27. Slide 27: WEL - ESG At The Core

    WEL - ESG At The Core 26

  28. Slide 28: Leading Practices - Environment, Health & Safety

    Leading Practices - Environment, Health & Safety 01 GHG Inventory and • Scope 1 & 2 emission adopted India GHG inventory program, IPCC Guidelines for Data Management National GHG inventories and Central Electricity Authority (CEA) India • Regular trainings & awareness sessions for water savings, red

  29. Slide 29: Leading Practise – CSR initiatives 3Es

    Leading Practise – CSR initiatives 3Es EDUCATION ENVIRONMENT EMPOWERMENT HEALTH Wel-Shiksha enhances education by Welspun's green initiatives are To empower athlete from Our initiative aims to empower modernizing govt classrooms, integrated into the WelPrakruti challenging backgrounds to realize wom

  30. Slide 30: Leading Practice – Governance and Oversight

    Leading Practice – Governance and Oversight Independent & Experienced Board Board Committees 30,000+ Audit Committee • 3 Members - all Independent Directors Experienced Board Board NRC* Average Age Strength 63 7 • 3 Members - all Independent Directors STIGSR* 4 • 3 Members - all Independent Director

  31. Slide 31: Summary Historical Financials

    Summary Historical Financials 30

  32. Slide 32: Highway Portfolio Monetization - Actis Deal

    Highway Portfolio Monetization - Actis Deal Contract Authority In ₹ Cr. 2,309 Project Name Status Type /Client 1,715 Delhi-Meerut Expressway (Pkg 1) HAM NHAI COD achieved 1.5x Chutmalpur-Ganeshpur HAM NHAI COD achieved Gagalheri-Saharanpur-Yamuna nagar HAM NHAI COD achieved Chikhali-Tarsod HAM NHAI

  33. Slide 33: Summary Standalone Financial Highlights

    Summary Standalone Financial Highlights Particulars (₹ Cr.) FY-21 FY-22 FY-23 FY-24 Revenue 1,410 1,307 2,676 2,450 Operating EBITDA 169 144 237 337 Other Income 29 38 99 102 Exceptional income 0 0 510 - Finance Cost 45 53 76 33 Depreciation 12 12 10 10 Tax 34 23 47 111 PAT (With Exceptional) 108 95

  34. Slide 34: Balance Sheet Summary

    Balance Sheet Summary Particulars (₹ Cr.) FY-21 FY-22 FY-23 FY-24 Gross Debt 602 502 292 - Cash & Cash Equivalent 381 194 1,842 923 Net Cash -221 -307 1,549 923 Net Worth 1,819 1,894 2,465 2,422 Core Investments 1,622 1,812 488 751 Long Term Investments 320 393 424 448 Payback to Investors 30 22 135

  35. Slide 35: Consistently Light on Working Capital

    Consistently Light on Working Capital Net Working Capital (Days) 89 71 73 60 15 3 FY-21 FY-22 FY-23 FY24 -5 -19 Debtor Days Net Working Capital Key Highlight of WEL Model • WEL Consistently operates with near negative working capital • Selective sourcing of inventory to ensure quality & timely work

  36. Slide 36: Appendix: Existing Portfolio of Projects

    APPENDIX Existing Portfolio of Projects HAM: Aunta - Simaria (Ganga Bridge with Approach 1 Roads) 2 HAM: Sattanathapuram – Nagapattinam 3 EPC: Varanasi Aurangabad NH2 Project 4 EPC: UP State Water and Sanitation Mission 5 EPC: Dharavi Wastewater Treatment Facility (Mumbai) 6 EPC: Bhandup Water Treat

  37. Slide 37: Diversified Infrastructure Portfolio

    Diversified Infrastructure Portfolio Project Names Contract Type Authority / Client Status Dewas Water BOT MPSIDC Operational Water/ Wastewater UP State Water and Sanitation Mission EPC SWSM Under Execution Treatment Bhandup Water Treatment Complex (Mumbai) EPC BMC Under Execution Dharavi Wastewater

  38. Slide 38: HAM: Aunta-Simaria

    HAM Project details Project Length (Kms) 08.15 Km Aunta-Simaria Acquisition Date Aug 2018 (Ganga Bridge with Financial Closure Achieved Appointed Date 30th Aug 2018 Approach Roads) Scheduled Construction Period 42 Months^ Concession Period after COD 15 Years ^ EOT up to 29th October 2024 approved by

  39. Slide 39: HAM: Sattanathapuram-Nagapattinam (SNRP)

    Project details HAM Project Length (Kms) 55.755 Km Sattanathapuram- Award Date July 2018 Financial Closure Achieved Nagapattinam Appointed Date 5th Oct 2020 (SNRP) Scheduled Construction Period 24 months^ Concession Period after COD 15 Years ^ EOT up to 17th January 2025 approved by NHAI SCOPE 4 lan

  40. Slide 40: EPC: Varanasi Aurangabad NH2 Project (VARP)

    Project details EPC Project Length (Kms) Original Contract 192.4 Varanasi Aurangabad Commencement Date 30th Sep 2021 NH2 Project Construction Period Additional Contract 24 Months (VARP) Construction Start Date May 2022 Construction End Date Nov 2023* • Sought EOT till 31st March 2025 SCOPE Six lanin

  41. Slide 41: EPC: UP State Water and Sanitation Mission

    EPC Project details UP State Water and Project Scope Water Supply to Villages Sanitation Mission Est aggregate contract value (excluding O&M value and ₹ 2,900 Cr. GST) SCOPE S No. Revenue District No of Division Villages Rural Water Supply project under Jal Jeevan Mission by 1 Varanasi Jaunpur 747 S

  42. Slide 42: EPC: Dharavi Wastewater Treatment Facility

    EPC Project details Wastewater Treatment 60 Months for Design Build, Facility - Mumbai Sewage Contract period 15 years of operation and maintenance Disposal Project, Dharavi Welspun Enterprises 80% share in JV SCOPE Status Design, Build, Operation and LOA received on May 27, 2022 Maintenance of 418

  43. Slide 43: Dharavi Project - India's First Multi-Storeyed Wastewater Treatment Facility

    EPC Dharavi Project - India’s First Multi-Storeyed Wastewater Treatment Facility • A first-of-its-kind project in the country, this facility is being constructed vertically, due to the space constraints at the project site. • Being built on just 12.7 acres of land, it has one of the lowest footprint

  44. Slide 44: EPC: Water Treatment Plant – Bhandup Complex, Mumbai

    EPC Project details Water Treatment Plant – Contract period 48 Months for Design Build, 15 years of operation and Bhandup Complex, maintenance Mumbai Welspun Enterprises 100% Status SCOPE LOA received on Feb 29, 2024 Design, Build, Operation and Maintenance of 2,000 MLD Received Notice to Commence e

  45. Slide 45: EPC: Water Conveyance Tunnel, Mumbai

    EPC Project details Water Conveyance Tunnel 93 Months for Design Build Contract period of a 8.48 km tunnel with a from Dharavi WWTF to 3,500 mm bored diameter Ghatkopar WWTF– Mumbai Welspun Enterprises 100% Status SCOPE LOA received on Oct 8, 2024 Design and construction of Tertiary Treated Water To

  46. Slide 46: BOT: Dewas Water

    BOT Dewas Sector Project Name Location COD Concession End Water Water Supply Dewas Water* MP Apr-20 Jun-37 *Dewas Water – Modified Project  Modified project involves the supply of treated water of up to 23 MLD to industrial customers in Dewas  FY24 revenue stands at ₹ 12.37 Cr. with EBITDA of ₹ 6.

  47. Slide 47: Investment in Oil & Gas blocks

    Block Name Location AWEL WEL Status Investment Stake Effective Stake in Oil & Gas MB-OSN-2005/2 Mumbai 100.0% 35.0% AWEL drilled a well and had made a Offshore hydrocarbon discovery wherein three layers have proven to be gas bearing, two layers have blocks: flown good amount of gas to surface. A dis

  48. Slide 48: Thank You

    Thank You For further details please contact investorrelations_WEL@welspun.com/Siddharth_Bharadwaj@welspun.com Mr. Siddharth Bharadwaj, Lead - Investor Relations Mr Salil Bawa, Head – Group Investor Relations CORPORATE OFFICE WELSPUN ENTERPRISES LIMITED CIN: L45201GJ1994PLC023920 C/8, BKT House, Tra