Emp Metals Corp · CSE:EMPS

Emp Metals — Investor Presentation (October 2024)

23 slides from Emp Metals's investor presentation, October 2024

  1. Slide 1: Investor Presentation: Primed to Become a Leading Lithium Producer in Saskatchewan

    Investor Presentation Primed to Become a Leading Lithium Producer in Saskatchewan empmetals.com | CSE: EMPS | OTCQB: EMPPF October 2024

  2. Slide 2: Forward Looking Statement

    Forward Looking Statement This presentation contains “forward looking which may cause results to differ from those statements” within the meaning of contained in forward-looking statements is applicable Canadian securities legislation. included in filings by the Company with Statements in this news

  3. Slide 3: The EMP Advantage

    The EMP Advantage SE Saskatchewan Mining Investment: ▪ 3rd most attractive jurisdiction worldwide* ▪ 1st in Canada* ▪ Direct access to North American markets Hub City Lithium (HCL): EMP Metals 100% Hub City Lithium (HCL): 81,000 ha (~200,000 acres) Crown 90% Freehold 10% Inferred LCE Resource Mansur

  4. Slide 4: The Saskatchewan Advantage

    The Saskatchewan Advantage Prism Diversified 56-96 mg/L Regionally extensive reservoir with Lithium Bank highly concentrated lithium brine 68 mg/L Neolithica 70 mg/L Grounded Lithium Significantly higher grades of 74 mg/L lithium in Duperow vs. Leduc EMP Metals Corp. Lower CAPEX and OPEX E3 Lithium

  5. Slide 5: The Saskatchewan Advantage

    The Saskatchewan Advantage Existing roads, rail, power, 50-year oil and gas history in SK Existing technology for subsurface brine deliverability and disposal No freshwater usage, 90% water recovery during refining, make up water through RO of non potable brackish water Minimal surface impact, no on

  6. Slide 6: Strategic Relationships

    Strategic Relationships • Private equity specialty fund • Worldwide leaders in the deployment • Highly experienced resource investors of DLE • Extensive due diligence in emerging DLE • Successfully completed extended run space and EMP Metals prior to investing pilot testing with EMP • 19.9% equity i

  7. Slide 7: Duperow: Mansur Project

    Mansur Project NI 43-101 Resource Assessment Lithium Concentration (mg/L) Inferred Resource: 399,364 t LCE Weighted Average [C] Li: 143.4 mg/L Mansur #1 Mansur #2 Mansur #3 Net Acres: 35,005 (54.5 sections) Depth Member 11-2-9-13 14-36-8-13 1-29-7-12 1800 m Wymark F 96 43 pending Mansur #1 (11-2) Wy

  8. Slide 8: Duperow: Viewfield Project

    Viewfield Project NI 43-101 Resource Assessment Lithium Concentration (mg/L) Inferred Resource: 747,526 t LCE Weighted Average [C] Li: 143.4 mg/L Viewfield#1 Viewfield #2 Viewfield #3 Net Acres: 27,360 (42.75 sections) Depth Member 2-22-7-9W2 4A-23-7-9W2 8-24-8-9 1800 m Wymark F 64 56 Mansur #1 (11-

  9. Slide 9: Viewfield PEA Overview & Economic Highlights

    Viewfield PEA Overview & Economic Highlights empmetals.com | CSE: EMPS | OTCQB: EMPPF 9

  10. Slide 10: Viewfield PEA - Development Plan

    Viewfield PEA - Development Plan 5 Direct Lithium Extraction Hubs producing 62,000 m3/day (12,400 m3/day each) 2 Concentrate, Refining, and Conversion facilities connected Site 4 via pipe to DLE hubs Site 3 Site 5 36 multi-leg horizontal production wells (1,720 m3/day each) Site 2 30 vertical water

  11. Slide 11: Viewfield PEA – Economic Highlights

    Viewfield PEA – Economic Highlights Years 1-7: Description Values Average Production LCE 12,175 tonnes/year Production 18,860 tonnes / year Project Life 23.2 years Total Capital Cost (incl. contingency) US$571 million Average Annual Operating Costs US$40 million Average Selling Price (LCE) US$20,000

  12. Slide 12: Viewfield PEA – Sensitivity Analysis

    Viewfield PEA – Sensitivity Analysis NPV(8) – Base Case: $1,066M (+/-20%) Low High IRR – Base Case: 45.1% (+/-20%) Low High Price Price $720 $1,403 34.4% 55.0% ($20,000/tonne) ($20,000/tonne) CAPEX $993 $1,138 CAPEX 37.3% 56.6% ($576M) ($576M) OPEX OPEX ($3,319/tonne) $1,014 $1,118 ($3,319/tonne) 43

  13. Slide 13: Path to Commercial Production

    Path to Commercial Production empmetals.com | CSE: EMPS | OTCQB: EMPPF 13

  14. Slide 14: Stage 1 Commercial Plant

    Stage 1 Commercial Plant 3,000 tonne/year Modular approach to battery grade Li2CO3 expand across Saskatchewan Stage 1 Site refinery in Viewfield lease holdings US$160M CAPEX Estimate to be defined through Front End Engineering & Design empmetals.com | CSE: EMPS | OTCQB: EMPPF 14

  15. Slide 15: Demonstration Plant

    Demonstration Plant Further derisking of subsurface and DLE technology Estimated flow 1,000 m3/day (150 tonne/year) Utilize existing well and surface infrastructure US$10-15M CAPEX To be further defined on output requirements empmetals.com | CSE: EMPS | OTCQB: EMPPF 15

  16. Slide 16: 2024 Workplan and Status

    2024 Workplan and Status empmetals.com | CSE: EMPS | OTCQB: EMPPF 16

  17. Slide 17: 2024 Workplan and Status

    2024 Workplan and Status Viewfield Preliminary Operation of Koch DLE Saltworks Concentrate, Complete FEED Study for Economic Analysis Pilot Plant in Estevan, Refine, and Conversion Stage 1 Commercial Plant (Complete) Saskatchewan Pilot 10 Program (Complete) (Complete) Complete Field Front End Engine

  18. Slide 18: SE Saskatchewan Lithium Land Rights

    SE Saskatchewan Lithium Land Rights Tyvan EMP Metals Corp Lands Arizona Lithium Lands Viewfield Mansur Living Skies Lands E3 Lithium Lands Lithium Bank Lands July Crown Land Sale empmetals.com | CSE: EMPS | OTCQB: EMPPF 18

  19. Slide 19: Project Highlights

    Project Highlights Best Canadian brine Rapid technical resource in the top Canadian advancement & mining jurisdiction project de-risking ▪ Clean high-quality brine, 259 mg/L concentrations, no H2S, no oil, minimal organics ▪ Drilling, piloting programs, flow testing ▪ Stable government & regulatory

  20. Slide 20: Corporate Snapshot

    Corporate Snapshot Ownership Structure Share Structure Brokers Issued & Outstanding 114,865,251 Retail 17.0% Warrants 23,660,200 8.0% Options 7,258,332 Fully Diluted 145,783,783 ROK Corporate Information Resources Financial Year End April 30 17.1% Auditors Baker Tilly Endeavor Transfer Agent Trust C

  21. Slide 21: Management, Directors

    Management, Directors Karl Kottmeier, B.A. Rob Gamley, BSc. Paul Schubach, P.Eng. CEO, Director President, Director COO Over 25 years experience in listing, financing, and 15 years of corporate finance and capital markets Professional Engineer with over 12 years of diversified administering resource

  22. Slide 22: Project Technical Team

    Project Technical Team Cam Taylor, BSc. Bryden Wright, P.Eng. Jared Lukomski Chairman & CEO ROK Resources President & COO ROK Resources Sr VP Land & Business Dev ROK Resources Co-founder of ROK Resources Inc., former President Co-founder of ROK Resources Inc., and former Vice Co-founder of ROK Resou

  23. Slide 23: Contact Us

    Contact Us Karl Kottmeier Paul Schubach CEO COO karl@pemgroup.ca paul@empmetals.com Corporate Head Office 208A – 980 West 1st Street North Vancouver, BC V7P 3N4 +1 604-689-7422 empmetals.com | CSE: EMPS | OTCQB: EMPPF

EMP Metals — Investor Presentation (October 2024) on 6ix