Bhp Group Ltd · ASX:BHP

Bhp — BHP Billiton — Merger or Acquisition (November 2008)

17 slides from Bhp's merger presentation, Nov 3, 2008

  1. Slide 1: Form 6-K Report of Foreign Private Issuer

    UNITED STATES SECURITIES AND EXCHANGE COMMISSION Washington, D.C. 20549 Form 6-K REPORT OF FOREIGN PRIVATE ISSUER PURSUANT TO RULE 13a-16 OR 15d-16 UNDER THE SECURITIES EXCHANGE ACT OF 1934 November 3, 2008 BHP BILLITON LIMITED BHP BILLITON PLC (ABN 49 004 028 077) (REG. NO. 3196209) (Exact name of

  2. Slide 2: Iron Ore presentation, Ian Ashby, October 2008

    IronOctober Ian 26 resourcing bhpbilliton Ashby, Ore thePresident 2008 future

  3. Slide 3: Disclaimer

    Byaffect Disclaimer such to Subject no Billiton from has securities, approval securities Securities The This restrictions. Markets (iii) Certain production typically numerous expectations achievements Factors successfully of completion Form Exchange, Slide resourcing bhpbilliton any reliance reviewi

  4. Slide 4: Disclaimer - Additional Information

    Nomay Disclaimer share cost Cautionary extract. material most References In Statement not U.S. THE ANY Investors (http://www.sec.gov) BHP shareholders The of States Information It officers be You Slide purchases. resourcing bhpbilliton connection the difficult statement aRio savings should INVESTORS

  5. Slide 5: Record quarterly production and shipments

    Quarterly (mt, 25 Q1 Record Pilbara Samarco Chinese Iron Slide resourcing bhpbilliton 26 FY07 WAIO Ore Ore’s 428production shipments quarterly growth remains production 29 Q1 Shipments, low the and 30 FY08 future cost, 31 Samarco has shipments confident in recovering Q2 softened high record the BHP

  6. Slide 6: Western Australia Iron Ore expansion projects

    Expected Western (mtpa, Advanced Operating Project Completed Construction Early Mine Pre-feasibility External Expect 122 FY08 Status Completion 109 Notes: Attributable Slide resourcing bhpbilliton 205development mtpa and commitments RGP3* FY08 100% 26 final early 53% Australia approvals Growth capac

  7. Slide 7: Pilbara resource potential

    Expected Roy Yandi Scale Upper Central Marillana Ministers Mining Area Coondewana Opthalmia Mt. Jimblebar Prairie Large Infrastructure Product More Smaller BHP Source: Equity The results target Slide Resource resourcing bhpbilliton Whaleback Potential Hill Billiton Billiton’s C61: resource range Hub

  8. Slide 8: Unlocking value through combination

    The 1 Lower Unlocking 2 Deployment Greater Better Efficient 3 Economies Avoid Accelerate Slide resourcing bhpbilliton Optimising Enhanced Unique combination: 7duplication, positioned cost, ability exploration synergies the volume tonnage of platform more of mineral scale future to scarce develop as

  9. Slide 9: Pilbara overlapping infrastructure and operations

    Early Nelson Finucane Cape 215km Yarrie East Dampier Parker Mine Rio kilometres Deepdale Operations BHP 313km Marandoo Brockman HI 456km Tom Hope 340km MAC West OB 386km Paraburdoo 410km Port 435km Jimblebar 426km Newman MAP W N 0 Perth Slide km resourcing bhpbilliton 20 estern Yandi 23/25 Tinto Hed

  10. Slide 10: Yandi: a single orebody with multiple ownership segments

    Yandi The Rio BHP 313km Marandoo Brockman HI 456km Tom Hope 340km MAC West OB 386km Paraburdoo 410km Slide 435km Jimblebar 426km Newman resourcing bhpbilliton Yandi 23/25 Tinto Yandi Price Yandi Billiton Angeles 9Downs expected Operations ore theYandi Operations body future to deliver is a single a

  11. Slide 11: Unlocking business benefits

    Unlocking 1 Business 2 3 4 Slide bhpbilliton A Exposure Combined Enhanced natural 10 value: fit to earnings entity –overlapping common Anticipated will through have strategies, iron aquantified Core unique ore basin benefits heritage, portfolio synergies positions inculture the of Iron world and and

  12. Slide 12: Resourcing the future

    resourcing the future bhpbilliton

  13. Slide 13: Site tour: Rio Tinto Hope Downs

    Site Rio Hope North Blockpiles BHP Iron Early Area Crushing Camp E Overland Block C Rail Infrastructure Jimble W3 Process Train W4 One Additional Blockpile Slide bhp resourcing and Deposit Tinto Deposits Deposit billiton tour: Ore Bodies Handling Loop loop Billiton C 12 Loadout tonnes down D Pits Cr

  14. Slide 14: Site tour: Yandi

    Site Yandi Additional Central Primary Western Camp Eastern Train Marillana Stockpiles Junction Conveyor To BHP Rio H Ore Rail Infrastracture Slide resourcing bhpbilliton Yandi Port Cape Mining Tinto Handling Processing Bodies tour: Loop Billiton 13 Loadout Loadouts expected Deposits Hedland Crusher

  15. Slide 15: Site tour: Jimblebar and Kurra

    Site Kurra Shuttle Reclaimer Upgraded Car BHP Large Expected (mtpa, Advanced 122 Completed Early Project 45 Mine External Expect 240 300 60 > 50 FY08 Status Operating Feasibility Construction Completion Concept Pre-feasibility Concentrated Optimal Capable Reduces Infrastructure Product Smaller Weste

  16. Slide 16: Site tour: Newman Hub

    Site tour: Screening New Newman Orebody Photo: Jimblebar SOB Crushing body) Coarse Train Rail Viewing Slide resourcing bhpbilliton to Stockyards Shuttle 15 Loadout Construction satellite Ore Platform 25 18 Townsite Hub Station Newman Plant the Stockpile Train development future -ore Concrete --bin B

  17. Slide 17: Signatures

    SIGNATURES Pursuant to the requirements of the Securities Exchange Act of 1934, the registrant has duly caused this report to be signed on its behalf by the undersigned, thereunto duly authorized. BHP Billiton Limited and BHP Billiton Plc Date: 3 November 2008 By: Jane McAloon Name: Jane McAloon Tit

BHP Billiton — Merger or Acquisition (November 2008) on 6ix