Mgx Resources Limited · ASX:MGX

Mgx Resources — Mount Gibson Iron — Metals Bulletin, November 2005

17 slides from Mgx Resources's conference presentation, Nov 18, 2005

  1. Slide 1: Growth Through Initiative

    Growth Through Initiative Metals Bulletin, November 2005

  2. Slide 2: Resources & Infrastructure

    Resources & Infrastructure Shiploading Factises {60.000085) SCALE 1 TONG A ANE egene | manwa sips | wae se erie seg co 7 Kooisnnoks Saath Henatie & Magnetic I Gibeon Hematite & Lagat Exterior Ensnaion Ht South Tag HH shelecn Ht

  3. Slide 3: Niche Australian iron ore producer

    e Niche Australian iron ore producer e Strong financial & operational performance e Project development pipeline ¢ Accretive project strategy e Alternate iron ore supplier to Asia Moune Goon tron 3 18/11/2005

  4. Slide 4: Phased Growth

    hased Growth ¢ Direct shipping grade hematite e Magnetite concentrate & pellet production ¢ Metallised iron production Moune Goon tron 4 18/11/2005

  5. Slide 5: Tallering Peak Mining Operations

    Tallering Peak Mining Operations e First hematite ore shipped Feb 2004 e 2004/05 - 1.84 million tonnes produced ¢ Current production 2.0 Mtpa ¢ Target production 3.0 Mtpa from mid 06 « Strong cash generator Moune Goon tron 5 18/11/2005

  6. Slide 6: Tallering Peak - Ground Magnetics

    Tallering Peak = Ground Magnetics 18/11/2005

  7. Slide 7: Tallering Peak Operation

    Tallering Peak Operation Mouné Goon tron 7 18/11/2005

  8. Slide 8: Extension Hill Hematite & Magnetite

    Extension Hill Hematite & Magnetite e Undertaking BFS - Produce 5 Mtpa magnetite concentrate (68% Fe) - Mine life approx 20 years e Resource of 250 million tonnes ¢ Ore body with low strip ratio e High quality concentrate produced e Extension Hill is one of eight deposits at Mt Gibson Moune Goon tro

  9. Slide 9: Extension Hill - Magnetics

    Extension Hill = Magnetics S200D0ME a A 6730000niN — : Extension Hil North: Nontti 500: ton 4809 20cm LE Extension Hill Open Pit Werinara Road / Pion rib eas: M59/454 18/11/2005

  10. Slide 10: a Se

    a Se

  11. Slide 11: Site layout

    ‘Heinate ‘Crusher | smagnetite Concentrator ha Administration. ROM Pad #2 Low Grade —~ ‘Hematite % ~ Stochnite. "-Hemanite Waste, Duran #276 Pe | LEGEND ~ “Tenement Boundary “Tepoarsphie Contr ee = Reaertracs WISELB on wineraetion ee Magnoiits Mine — \ UIE, aerate sore: On, %

  12. Slide 12: Nanjing Pellet Plant

    Nanjing Pellet Plant LO oO EE « Capacity of 2.5 Mtpa blast furnace grade pellets « Location advantages: - Reduce shipping costs Expanding steel making region Located at a new port Lower capex and opex than Australia Skilled workforce available « Sell pellets to regional steel mills under long term c

  13. Slide 13: Metallised Iron Project

    Metallised Iron Project « Commenced feasibility study - Progressively develop four 500,000 tpa modules utilising MIDREX ITmk3 process - Single pass rotary hearth furnace reducing magnetite concentrate to metal in 12 minutes « Coal may be sourced from Irwin River, which is accepted by MIDREX as suita

  14. Slide 14: MIDREX ITmk3 Technology

    iam{ MIDREX ITmk3 Technology Food Preparation Petieazer Product Discharge Hot Braguet Stream Betary Hoare Fumact Reduction

  15. Slide 15: VID

    i a 7. VID

  16. Slide 16: Summary

    Summary e Mt Gibson is an established and expanding iron ore producer ¢ Building internal capacity and capability ¢ Generating strong cash reserves e Enjoys long term access agreements to services and infrastructure « Executing accretive strategic projects e Established strategic alliances and partn

  17. Slide 17: Disclaimer

    Disclaimer This Document is Confidential and may not be reproduced, redistributed or passed on, directly or indirectly, to any other person, or published, in whole or in part, for any purpose without prior written approval frorn Mount Gibson iron Limited. This Document is not a Prospectus nor an Off

Mount Gibson Iron — Metals Bulletin, November 2005 on 6ix