Westar Energy — Annual EEI Financial Conference 2010
50 slides from Westar Energy's conference presentation, Oct 28, 2010

Slide 1: Annual EEI Financial Conference
th Annual EEI Financial Conference Oct 31 – Nov 3, 2010 Palm Desert, CA Exhibit 99.1

Slide 2: Forward Looking Disclosures
2 Forward Looking Disclosures The following presentation contains some “forward-looking statements” with respect to Westar Energy, Inc.’s (“Westar”) future plans, expectations and goals, including management’s expectations with respect to future operating results and dividend growth. The Private Sec

Slide 3: Recent Events
3 Recent Events YTD results strong and well ahead of last year – Stronger retail sales Weather Improved industrial sector Updated 2010 earnings guidance to $1.80 to $1.95 2011 earnings drivers New transmission opportunities Renewables update

Slide 4: YTD September 2010 Results Well Ahead of '09
4 EPS from continuing operations were $1.77 vs. $1.18 last year – Q3 results $1.02 vs. $0.73 last year 8% increase in retail MWh sales – Ahead of plan Warmer than normal weather Signs of economic recovery – Industrials up 6% All planned price adjustments now effective (annualized amts): – Abbreviate

Slide 5: Updated 2010 EPS Guidance to $1.80 - $1.95
5 Favorable weather through Q3 Economic improvement reflected in industrial sales up 6% Still assumes $11 million of COLI proceeds based on actuarial projections Updated 2010 EPS Guidance to $1.80 - $1.95

Slide 6: 2011 Earnings Drivers
6 2011 Earnings Drivers Plan to provide 2011 guidance with release of 2010 results in February Drivers and preliminary assumptions for 2011 – No change in business strategy or direction – No change in regulatory principles or methods – Normal weather – Modest price adjustments via approved annual me

Slide 7: Significant New Transmission Opportunities
7 Southwest Power Pool’s long-term plan identifies many projects in our immediate region – Multiple 345 kV projects – In excess of 600 line miles Will work with SPP, neighboring transmission owners and policymakers to determine timing and sequence of development as projects unfold over the next deca

Slide 8: RFP for 200MW of Renewables
8 300MW of renewables today – Kansas in the top decile nationally on per capita basis Westar holds largest commitment in Kansas Statute requires MW more – Have elected to pursue this increment through PPAs – Evaluating bids Culling to short list from over 50 proposals Expect to announce selection(s)

Slide 9: Profile
9 Profile

Slide 10: Strategic Approach
10 Strategic Approach Embrace uncertainty and acknowledge inability to predict the future Place a high value on flexibility – Operational – Financial – Regulatory Leverage actions and strategies around intrinsic advantages Seek collaborative and constructive approaches to regulation Value propositio

Slide 11: Pure-play, vertically integrated, rate-regulated
11 Pure-play, vertically integrated, rate-regulated 7,100 MW of generation 6,200 miles transmission 686,000 customers Kansas’ Largest Electric Provider

Slide 12: Favorable Supply Portfolio
12 Favorable Supply Portfolio $57.75 $17.25 $6.48 Uranium Coal Gas Ave. Fuel Cost $18.51/MWh Fuel Mix Coal 48% Gas 40% Wind 4% Uranium 8% MW Capacity 5.0¢ 6.0¢ 7.0¢ 8.0¢ 9.0¢ 10.0¢ Westar Energy Kansas City Power and Light (KS) Empire District Electric (KS) National Average 7.6¢ 8.4¢ 8.4¢ Low Rates

Slide 13: Low-Cost Coal Fleet
13 Low-Cost Coal Fleet Very low fuel cost – PRB coal – Excellent rail arrangements – Proximity to mines Low embedded capital cost No high-heat rate obsolete plants LAC 2 subject to lease agreement

Slide 14: Diverse Energy Sales (MWh)
14 Diverse Energy Sales (MWh) Chemical & oil Food processing Aerospace Consumer manufacturing Other Commercial 38% Residential 35% Industrial 27% 38% 17% 16% 16% 14% 12% 12% 8% 7% 6% 4% 51% Other General merchandise Grocery/ Convenience Military Health care State/local government Education

Slide 15: Strong Service Territory
15 Strong Service Territory Overall economic conditions significantly better than nation – No real estate crash – State unemployment remains 3 pts favorable to nation Industrial sales showing strong signs of recovery (up 6%)

Slide 16: Capitalization and Liquidity
16 Capitalization and Liquidity Target 50/50 capital structure Solid investment grade credit – Recent upgrade and moves to positive outlook No bonds mature before 2014 September 30, 2010 (a) (millions) Long-term, net $2,491 Preferred Common 2,381 Total Capitalization $4,893 Debt 51% Equity 49% Prefe

Slide 17: Dividend
17 $0.92 $1.00 $1.08 $1.16 $1.20 $1.24 $0.75 $0.85 $0.95 $1.05 $1.15 $1.25 $1.35 2005 2006 2007 2008 2009 2010 Dividend Long-standing dividend payout target of 60%-75% of earnings – Updated 2010 guidance implies 64%-69% payout – Current yield 5.0% Indicated annual rate

Slide 18: Westar's Value Proposition
18 Westar’s Value Proposition Solid, transparent business strategy Strong, experienced utility management team Thoughtful, disciplined approach to operations, capital planning and financing Constructive regulatory and policy environment – Results in lower prices for customers – Provides investors cl

Slide 19: 2011 Plans
19 2011 Plans

Slide 20: Annualized Rate & Revenue Changes
20 Annualized Rate & Revenue Changes Actual and Estimated 2009 2010 2011 (Estimated) Base rates $130 million Feb 3 $ 17 million Feb Transmission rates $ 36 million Jan 1 $ 16 million Jan 1 $ million Jan 1 ECRR $ 32 million June 1 $ 14 million June 1 $ million June 1 Energy Efficiency $6 million Nove

Slide 21: Major Construction Projects Underway
21 Major Construction Projects Underway Environmental – Lawrence Energy Center Install fabric filters, rebuild scrubbers, precipitator, low NOx system – Jeffery Energy Center Planning for SCR (part of settling New Source Review) – La Cygne Energy Center Transmission – Completed Hutchinson to Salina

Slide 22: Capital Forecast Outlook
22 Capital Forecast Outlook Original 2010-2012 CAPEX Forecast – 2010 $665 – 2011 $801 – 2012 $899 What’s changed – Favorable project budgets & schedule refinement have reduced 2010 planned CAPEX to $600 million Will update 2011-2013 with release of 2010 results

Slide 23: Projected Rate Base 2009 – 2014
23 $3.2 $3.4 $3.4 $3.5 $3.7 $3.9 Projected Rate Base 2009 – 2014 (in billions) 2009 2010 2011 2012 2013 2014 Base Renewable Environmental Transmission $6.6 $6.3 $5.8 $5.2 $4.7 $4.3

Slide 24: Westar Coal Fleet Emission Control Equipment
24 Westar Coal Fleet Emission Control Equipment Unit Scrubber Precipitator Fabric Filter Low NOx SCR Jeffrey 1 Yes Yes No plans Yes Planned Jeffrey 2 Yes Yes No plans Planned No plans Jeffrey 3 Yes Yes No plans Yes No plans La Cygne 1 Yes NA Planned Yes Yes La Cygne 2 Planned Yes Planned Planned Pla

Slide 25: Dramatic Improvement in Air Quality
25 Dramatic Improvement in Air Quality 2005 2006 2007 2008 2009 2005 2006 2007 2008 2009 Sulfur Dioxide 76% (000 tons) Nitrogen Oxide 49% (000 tons)

Slide 26: Transmission
26 Transmission

Slide 27: Major Transmission Projects
27 Major Transmission Projects Wichita – Salina Segment 1 Wichita-Hutchinson Completed December 2008 Investment $100 million Segment 2 Hutchinson-Salina Completed August 2010 Investment $100 million Rose Hill – Oklahoma Construction to follow the Hutchinson-Salina line Target completion mid 2012 Inv

Slide 28

Slide 29: Prairie Wind Transmission, LLC
29 Prairie Wind Transmission, LLC Received FERC incentives – Abandonment costs – Recovery of pre-commercial development costs – CWIP recovery in rate base – 50/50 capital structure – Allowed ROE of 12.8% KCC – Stipulation plans for double circuit 345 kV construction – Routing and siting to follow SP

Slide 30: Next Steps and Tentative Schedule
30 Next Steps and Tentative Schedule Complete assignments by Westar and Co-op to Prairie Wind Monitor Integrated Transmission Plan to determine voltage Obtain siting authority from KCC Engineer and design Acquire rights-of-way Construct – Anticipated completion in 2014

Slide 31: Potential for High Voltage Transmission Growth
31 Potential for High Voltage Transmission Growth C New Lines A. JEC to Iatan Energy Center B. JEC to Concordia C. Concordia to Salina D. Salina to Hays E. JEC to Swissvale F. Hutchinson to Spearville G. Wichita to Rose Hill H. Wolf Creek to Emporia G A B D E F H Jeffrey Energy Center Wolf Creek Hut

Slide 32: Rates and Regulation
32 Rates and Regulation

Slide 33: Regulatory Approach
33 Regulatory Approach A sound regulatory and energy policy platform – KCC and FERC Ultimately results in lower rates for customers Time Traditional GRC Riders coupled with GRC Ultimately, lower rates

Slide 34: Methods of Cost Recovery
34 Methods of Cost Recovery Revenue Requirement Method of Recovery Comment 1. Fuel, purchased power and environmental consumables Quarterly adjustment based on forecasted cost, with annual true-up Adjusts prices for actual costs, protecting both customers and investors from mispricing 2. Environment

Slide 35: Retail Energy Cost Adjustment (RECA)
35 Retail Energy Cost Adjustment (RECA) Provides timely price adjustments for fuel and purchased power costs Retail rates based on forecast of fuel and purchased power costs and retail sales – Set quarterly – Difference between forecast and actual is deferred Quarterly approach produces more stable

Slide 36: Environmental Cost Recovery Rider Mechanics
36 Environmental Cost Recovery Rider Mechanics ECRR adjusts retail rates annually to reflect capital investments in emission controls – Investments as of December 31 recovered in rates subsequent June – Eliminates need to file a rate case to capture rate base additions Return of and on capital that

Slide 37: Illustrative ECRR Mechanics
37 Illustrative ECRR Mechanics (1) Illustration reflects only the projects publicly announced and assumes one-half of annual investment in service at year end (2) Illustration uses 12% pretax return and 4% depreciation recovery (3) Annual ECRR Tariff is effective June 1; assume Jan-May at prior year

Slide 38: Transmission Cost Recovery
38 Transmission Cost Recovery FERC formula transmission rate – Changes in cost of service reflected in annual update of FERC tariff Update posted each October using projected test year – Capital expenditures – O&M – Tariff based on year-end consolidated capital structure FERC transmission changes ef

Slide 39: Transmission Formula Rate Mechanics
39 Transmission Formula Rate Mechanics Fixed formula with changing inputs – Updated annually using Form 1 data – Established protocols for updates Uses projected test year – Rate base (based on 13 month average) – O&M, depreciation and taxes – Cost of debt Annual true-up incorporated in subsequent y

Slide 40: Statutes for Predetermination and CWIP
40 Statutes for Predetermination and CWIP Predetermination – Utilities can obtain order establishing ratemaking principles that will apply over the life of the asset Construction Work in Progress (CWIP) – Utilities can include CWIP in rate cases

Slide 41: Pension Tracker
41 Pension Tracker Defer as regulatory asset shortfall between funding of GAAP pension/OPEB expense and pension/OPEB currently authorized in rates Maintain minimum funding level equal to GAAP pension/OPEB expense Recover deferred expenses through multi-year amortization as part of next rate case

Slide 42: Energy Efficiency Initiatives
42 Energy Efficiency Initiatives SmartStar Lawrence smart grid project – Installing 48,000 “smart” meters – Advanced outage management system – Total project cost of $40 million Reduced by 50% DOE match – Expect to implement over 2 - 3 years Deferred accounting for the cost of energy efficiency init

Slide 43: Kansas' Renewable Requirements
43 Kansas’ Renewable Requirements Renewable Portfolio Standard established – Installed capability standard in lieu of energy standard 10% of peak load by 2011, 15% by 2016 and 20% after 2020 – Implies additional 150 to 200 MW for Westar – If generated in Kansas, treated at 110% of requirement – Reli

Slide 44: Capital Structure for Ratemaking (Per Recent Orders)
44 Capital Structure for Ratemaking (Per Recent Orders) Capitalization Ratio Cost of Capital Weighted Cost of Capital Pre-tax Weighted Cost of Capital Long-term debt 48.66% 6.55% 3.19% 3.19% Preferred 0.51 4.55 .02 .04 Common 50.83 10.40 5.29 8.77 100.00% 8.50% 12.00% Capitalization Ratio Cost of Ca

Slide 45: Background
45 Background

Slide 46: Westar Energy Legal Structure
46 Westar Energy Legal Structure Kansas Gas and Electric Company Consolidated capital structure is used for ratemaking (Rate regulated utility) (Rate regulated utility) Westar Energy, Inc. Parent Subsidiary Combined company does business under the name “Westar Energy”

Slide 47: Original Capital Expenditure Forecast 2010-2012
47 Original Capital Expenditure Forecast 2010 - 2012 Actual Forecast Forecast Forecast Forecast 2009 2010 2011 2012 2010-2012 Method of Cost Recovery Generation Replacements and other 103.9 $ 99.9 $ 106.2 $ 126.6 $ 332.7 $ General Rate Case (GRC) Additional Generation Emporia Energy Center 4.4 - - -

Slide 48: Westar's Plants
48 Westar’s Plants Westar's MW Operator Years Installed Pulverized coal Jeffrey Energy Center 1,991 Westar 1978, 1980, 1983 Lawrence Energy Center Westar 1954, 1960, 1971 Tecumseh Energy Center Westar 1957, 1962 LaCygne Station KCPL 1973, 1977 Nuclear Wolf Creek WCNOC (1) 1985 Gas steam turbine Gord

Slide 49: Westar Energy Coal Fleet
49 Westar Energy Coal Fleet Unit Capacity (MW) WR Share (MW) Age Heat Rate (Btu/kWh) Net Book Value (Millions) $/KW Jeffrey 2 11,256 $ $ Jeffrey 1 11,204 $ $ Jeffrey 3 11,265 $ $ Lawrence 5 10,713 $ $ La Cygne 1 10,497 $ $ La Cygne 2 (a) 10,500 $ $ Tecumseh 8 11,189 $ $ Lawrence 4 11,605 $ $ Tecumse

Slide 50: Coal Supply
50 Westar-operated plant supply (80%) JEC supply under contract through 2020 (10+ million tons/year) – 70% has no market openers – 30% reopened on price every 5 years Next re-pricing will occur in 2013 – All volumes have cost escalators – Rail contract through 2013 LEC/TEC supply under contract unti
Source: SEC EDGAR · 8-K filed Oct 28, 2010
More decks from Westar Energy Inc
Merger or Acquisition (January 2018)27 slides · Jan 10, 2018
Q3 2017 Earnings Presentation19 slides · Nov 3, 2017
Q2 2017 Earnings Presentation20 slides · Aug 10, 2017
Q3 2016 Earnings Presentation6 slides · Nov 1, 2016
Merger or Acquisition (September 2016)29 slides · Sep 8, 2016
Merger or Acquisition (August 2016)59 slides · Aug 22, 2016