Escalera Resources — Double Eagle Petroleum — OGIS New York (April 2012)
18 slides from Escalera Resources's conference presentation, Apr 16, 2012
Slide 1: Double Eagle Petroleum Co OGIS New York April 16, 2012
1 Double Eagle Petroleum Co OGIS New York April 16, 2012
Slide 2: Corporate Information & Disclaimer
2 Corporate Information & Disclaimer This presentation may contain projections and other forward-looking statements within the meaning of Section 21E of the Securities Exchange Act of 1934, as amended. Any such projections or statements reflect the Company's current views with respect to future even
Slide 3: Double Eagle Petroleum Co. Overview
3 Double Eagle Petroleum Co. Overview HIGHLIGHTS Proved Reserves (a) 136.5 Bcfe Proved Developed 81.5 Bcfe Proved Undeveloped 55.0 Bcfe Total Proved PV-10 ($ in Millions) $153.5 Total Probable and Poss. Reserves (a) 109.5 Bcfe Probable and Poss. below econ. limits 18.0 Bcfe Current Production ~23 Mm
Slide 4: Financial Summary
Financial Summary Income Statement Summa Balance Sheet Summary Sinners Year Ended December 31, intone 2014 010 2009 Asof 12/31/11 Total Revenue S$ 647 $ 550 $ 448 Cash s 87 Total Assets S$ 1706 EBITDAX Oo 0 5 ere 5 ais % Margin 52% 43% 38% Total Bank Debt $s 420 Net income-common stock S 7,964 $ 1,7
Slide 5: Hedge Contracts
Hedge Contracts Double Eagle Petroleum Double Eagle Petroleum Double Eagle Petroleum Double Eagle Petroleum Double Eagle Petroleum Double Eagle Petroleum Current Hedging Positions-- 3/31/12 Current Hedging Positions-- 3/31/12 Current Hedging Positions-- 3/31/12 Current Hedging Positions-- 3/31/12 Cu
Slide 6: Double Eagle's Value Proposition
6 Double Eagle's Value Proposition
Slide 7: Proven Execution 2003-2010
7 Proven Execution 2003-20101SEC Reserves Prepared by Netherland, Sewell & Associates, Inc. as of December 31 for each respective year. With a large inventory of drilling locations, we have been able to consistently grow proved developed reserves by converting our probable reserves to proved reserve
Slide 8: Proven Execution: Low cost growth through the drill bit
8 Proven Execution Low cost growth through the drill bit F&D Costs three year simple average of $0.76/ Mcfe; Production Costs, including taxes--$1.68 per Mcfe G&A Costs equals 12.5% of O&G related revenues; among lowest of peer group with revenues < $140 million
Slide 9: Building Blocks for Shareholder Value
9 Building Blocks for Shareholder Value Atlantic Rim CBM Midstream Pipeline
Slide 10: Exploration Play-Niobrara Shale
10 Exploration Play-Niobrara Shale Niobrara Basins Double Eagle Acreage Powder River Basin Greater Green River Basin DJ Basin WR Basin Cased first Niobrara test well to 9,450' Oil and gas shows throughout the Niobrara shale formation & 3 potential gas zones, Sage Breaks, Dakota & Frontier; five comp
Slide 11: Exploration Play-Niobrara Shale Central Wyoming & Colorado
11 Exploration Play-Niobrara Shale Central Wyoming & Colorado
Slide 12: Exploration Play-Niobrara Shale DJ Basin
12 Exploration Play-Niobrara Shale DJ Basin
Slide 13: Exploration Play-Main Fork Unit
13 Exploration Play--Main Fork Unit (formerly known as Christmas Meadows/Table Top Unit) A Company-estimated 2-3 TCF target project comprised of 44,000 acres and a well previously drilled but not completed in 2007 Working with a major integrated oil and gas company that has option farm-in rights whe
Slide 14: Building Blocks for Shareholder Value: Midstream Pipeline, Atlantic Rim CBM
14 Building Blocks for Shareholder Value Midstream Pipeline --12.5 miles of transportation assets --20% utilized --Ability to expand north to WIC Atlantic Rim CBM --Interest in 255 producing CBM wells --64% of proved reserves --550 future drilling locations in 3 producing units --Catalina Unit Compa
Slide 15: The Atlantic Rim
15 Historical drilling activity Catalina Unit 84 gross (63.73 net) CBM production wells ~200 total potential future drilling locations 56.5 Bcfe net proved reserves (12/31/2011 NSAI) Drilling first Niobrara well in 2011 to 9,450' Sun Dog / Doty Mountain Units 172 gross (37 net wells) ~350 total pote
Slide 16: Pinedale Anticline
16 Pinedale Anticline QEP Operated Properties Interests in over 150 wells through 2011; Participated in ~16 new wells in 2011 Anticipate participating in 16 new wells in 2012 350+ Potential future locations Double Eagle Working Interests: 6-12.5% WI Well Economics EUR per well of ~230 Mmcfe (net) Li
Slide 17: Midstream Infrastructure
17 Midstream Infrastructure Growing source of fee-based revenue that is independent of gas prices Connects Catalina Unit to interstate pipeline 100% owned by Double Eagle 125 MMcf/d capacity; currently at ~30 MMcf/d Tie-in to third party production and transportation agreement in place Own permits t
Slide 18: Growth Strategy
18 Growth Strategy Mergers and Acquisitions Merge with companies to provide diversity in location and commodity Acquire additional exploration acreage Create economics of scale and take advantage of operational synergies Develop low cost fields to increase production and reserves Exploit Niobrara ho