Marquee Energy Ltd

Marquee Energy — Q3 2015 Earnings Presentation

29 slides from Marquee Energy's earnings presentation, December 2015

  1. Slide 1: Marquee Energy Ltd. December 2015

    MARQUEE ENERGY LTD. DECEMBER 2015 TSX-V: MQL OTCQX: MQLXF www.marquee-energy.com 1

  2. Slide 2: Forward Looking Statements

    FORWARD LOOKING STATEMENTS This presentation is for information purposes only and is not intended to, and should not be construed to, constitute an offer to sell or the solicitation of an offer to buy securities of Marquee Energy Ltd. (“Marquee“). Certain disclosures set forth in this presentation c

  3. Slide 3: Q3 2015 Financial and Operating Highlights

    Q3 2015 FINANCIAL AND OPERATING HIGHLIGHTS ON NOVEMBER 19, 2015, MARQUEE ANNOUNCED ITS THIRD QUARTER OPERATIONAL RESULTS AND FINANCIALS FOR THE THREE AND NINE MONTHS ENDED SEPTEMBER 30, 2015. • Balance sheet strength was maintained through the third quarter with exit net debt of $51.9 million, down

  4. Slide 4: Marquee Snapshot

    MARQUEE SNAPSHOT CURRENT PRODUCTION: ~5,200 boed (BASED ON FIELD ESTIMATES) CORPORATE DECLINE: 22% 2015 CASHFLOW: ~$17-19 MM MARKET CAPITALIZATION: $57.74 MM (NOV 19, 2015) ENTERPRISE VALUE: $109.7 MM SHARES OUTSTANDING: 120.3 MM INSIDER OWNERSHIP: 14% Basic 18.5% Fully Diluted RESERVES (2014 YEAR E

  5. Slide 5: Corporate Strategy

    CORPORATE STRATEGY • MAINTAIN a strong, flexible balance sheet. • FOCUS on sustainable growth and manageable declines. • DELIVER solid, repeatable results. • SEEK additional reductions in capital and operating costs. • CONCENTRATE on delineation and development at Michichi. 5

  6. Slide 6: Recipe for Junior E&P Success

    RECIPE FOR JUNIOR E&P SUCCESS • CONSOLIDATED land position • ACCESS to infrastructure and takeaway capacity • AFFORDABLE well costs • STRONG drilling results • DEEP prospect inventory • CONTROLLED pace 6

  7. Slide 7: Asset Base Overview

    ASSET BASE OVERVIEW Alberta Saskatchewan Michichi ~90% of total production • Current Production = 4,700 boe/d • 300 horizontal oil-focused drilling locations identified(1) • ~300 net undeveloped sections of land Edmonton LLOYDMINSTER • Ownership and control of key infrastructure MICHICHI Saskatoon L

  8. Slide 8: Michichi Geological Model

    MICHICHI GEOLOGICAL MODEL MIDDLE BANFF DETRITAL BANFF SAND API (°) 31-33 31-33 31-33 Pay (m) 2-10 3-8 3-8 Perm (md) 0.1-30 100-300 10-100 Porosity (%) 4-9 15-25 10-24 DPIIP (sec) 6-12 1-3 RF (%)* 10 15 15 Depth (m) 1200-1300 1200-1300 1200-1300 Reservoir Limestone Shoals Sandstone, Siltstone, Sandst

  9. Slide 9: Balancing Focused Acquisitions with High-Impact Drilling

    BALANCING FOCUSED ACQUISITIONS WITH HIGH-IMPACT DRILLING BNP, Feb. 2015 ~300 boed(79% oil) • 30 net undeveloped sections • 40 net locations Acquisition Costs: $50,000/boed 2P $4.58/boe Centrica Aug. 2015 ~500 boed(25% oil) • 21 net undeveloped sections • 40 net locations Acquisition Costs: $18,000/b

  10. Slide 10: The Michichi Advantage

    THE MICHICHI ADVANTAGE  Extensive Oil Potential • >10 million barrels of oil in place per section combined for Banff and Detrital zones in MQL focus area • Waterflood upside  Dominant Land Base • ~300 net undeveloped sections • Crown land, >90% avg. working interest  Extensive Inventory • 300 hor

  11. Slide 11: Michichi Well Performance

    MICHICHI WELL PERFORMANCE Michichi Well Performance 250 Expected IP30 Rate (186 BOE/D) 2014-2015 Drill Season Actuals Michichi at a Glance 200 Light Oil 31◦- 33◦ 150 Oil & Liquids BOE/D 65% Weighting 100 Capital ($C) 50 (Drill, Complete Equip, ~$2.0 MM Tie-in) - Reserves 186 MBOE 1 2 3 4 5 6 7 8 9 1

  12. Slide 12: Michichi Well Economics

    MICHICHI WELL ECONOMICS 1 $2.0 MM capital and constant dollar pricing used for all cases 2 Realized Canadian price includes 8% WTI/Cdn Light Differential 12

  13. Slide 13: Michichi – Reductions in Capital Cost Structure

    MICHICHI – REDUCTIONS IN CAPITAL COST STRUCTURE1 Drilling Cost Per Meter $900 Advancements to Marquee’s drilling Motor Issues $800 design and operations process have $700 successfully decreased drilling costs over time. Short Lateral $600 $500 >45% REDUCTION IN $400 DRILLING COST PER METER $300 1 2

  14. Slide 14: MQL Cost Structure and Potential Asset Value

    MQL COST STRUCTURE AND POTENTIAL ASSET VALUE Historical Performance Potential Asset Value (PAV) Cost Structure and Production Growth Peer Comparison (1)(2) $36.00 45.0 60% Peer Companies MQL $32.00 44.0 40% BOE/d per MM Shares Outstanding $28.00 $24.00 43.0 20% $20.00 $/BOE 42.0 0% $16.00 $12.00 41.

  15. Slide 15: Marquee Highlights – Why Invest?

    MARQUEE HIGHLIGHTS – WHY INVEST? R R R R R R Continuous Strong balance Solid Top-quartile Large land 100% owned improvements sheet production well base and infrastructure in cost performance economics drilling structure inventory Less than 22% Extensive, >3,000 bbl/d oil Drilling costs 2015 YTD F&D

  16. Slide 16: Recent Achievements and Near Term Catalysts

    RECENT ACHIEVEMENTS AND NEAR TERM CATALYSTS 2014 Achievements: 2015 Catalysts: RIMPROVED CONSISTENCY AND MAGNITUDE OF WELL RESULTS:  SUMMER DRILLING PROGRAM: IP results and oil weighting positive adjustment to type curve and reserve bookings for all four new Michichi horizontal wells above type cur

  17. Slide 17: Analyst Coverage

    ANALYST COVERAGE Peters & Co. National Bank Financial DALE LEWKO DAN PAYNE E: DLEWKO@PETERSCO.COM E: DAN.PAYNE@NBC.CA P: 403-261-2215 P: 403-290-5441 Canaccord Genuity Corp. Acumen Capital ANTHONY PETRUCCI TREVOR REYNOLDS E: APETRUCCI@CANACCORDGENUITY.COM E: TREYNOLDS@ACUMENCAPITAL.COM P: 403-691-78

  18. Slide 18: Contact Us

    CONTACT US For more information, please contact: Main: 403-384-0000 Richard Thompson Fax: 403-265-0073 President, CEO & Director Address: 1700, 500-4th Ave SW Calgary, AB T2P 2V6 Email: rthompson@marquee-energy.com Investor Inquires: ir@marquee-energy.com Direct: (403) 817-5561 Web: www.marquee-ener

  19. Slide 19: Appendix

    Appendix 19

  20. Slide 20: Experienced Management Team

    EXPERIENCED MANAGEMENT TEAM Richard Thompson, President & CEO (since 2011) • Former Executive Vice President/ Director of Cequence Energy Ltd. from 2008 to 2010 • Former Vice President of Exploration at Cyries Energy Inc. from 2004 to 2008 • Geophysicist from the University of Manitoba, graduated wi

  21. Slide 21: Strong Governance

    STRONG GOVERNANCE Glenn Carley, BA, LLB., MBA, ICD.D • Mr. Carley is the President of Selinger Capital Inc., a private investment company and has served as a Director of Marquee since December 5, 2011, and Chairman since May 2015. Mr. Carley currently serves as the Chairman of Painted Pony Petroleum

  22. Slide 22: MQL Hedges as of December 7, 2015

    MQL HEDGES AS OF DECEMBER 7, 2015 Term Hedge Type Counterparty Volume Pricing July 1, 2015 to December 31, 2015 WTI fixed price National Bank 200 bbls/d Cdn $74.05/bbl July 1, 2015 to December 31, 2015 WTI fixed price National Bank 200 bbls/d Cdn $75.00/bbl October 1, 2015 to December 31, 2015 WTI f

  23. Slide 23: 2014/2015 Production and Netbacks

    2014/2015 PRODUCTION AND NETBACKS Q3-14 Q4-14 2014 Q1-15 Q2-15 Q3-15 Average Production 5,143 5,209 4,858 5,536 5,118 4,703 BOE/D Liquid Content 42% 46% 44% 50% 49% 45% 49.97 44.56 52.00 31.35 34.53 29.57 /BOE Sales Price $ 6.54 3.64 5.71 2.12 5.33 3.52 /BOE Royalty Expense 11.67 15.00 15.20 13.37 1

  24. Slide 24: Reserves Growth

    RESERVES GROWTH Marquee Reserves Growth 25,000 Proved Producing Total Proved Total Proved plus Probable 20,000 15,000 MBOE 10,000 5,000 0 2011 2012 2013 2014 Apr-15 Reserves Category Light Oil Heavy Oil Gas NGL Total BT NPV10(1) Reserve Life Effective Date: December 31, 2014 (Mbbl) (Mbbl) (MMcf) (Mb

  25. Slide 25: Contingent Oil Resource Assessment

    CONTINGENT OIL RESOURCE ASSESSMENT OCTOBER 15, 2015 INDEPENDENT CONTINGENT RESOURCES EVALUATION PERFORMED BY SPROULE ASSOCIATES LIMITED IN THE MICHICHI AREA: • The contingent resource estimates contained in the Sproule Resource Assessment demonstrate that targets in the Detrital and Banff zones in t

  26. Slide 26: Continuous Improvement

    CONTINUOUS IMPROVEMENT  REDUCING OP  LOWERING  IMPROVING  Y/Y RESERVES COSTS G&A F&D COSTS GROWTH 2013 Avg.= $22.55/boe 2013 Avg. = $6.15/BOE 2013 Avg. = $24.60/boe 2011 PDP = 1,999 MBOE 2014 Avg.= $18.70/boe 2014 Avg. = $3.70/BOE 2014 Avg. = $19.70/boe 2014 PDP = 8,944 MBOE Q2 2015 Avg. = $15.9

  27. Slide 27: Lloydminster Performance

    LLOYDMINSTER PERFORMANCE 2014 Lloydminster Well Results 100 Regional/Sparky 90 McLaren 80 HZ MQL 2014 Wells 70 * To be optimized BOE/D 60 + Well bore damage 50 40 30 20 10 0 + * * * Wells (Chronologically Ordered) MQL 2015 Well • Lloydminster current production = 500 bopd Completion Pending • Low ri

  28. Slide 28: Marquee History

    MARQUEE HISTORY Closed PVR sale on Entered into a Closed property Received Acquired gas plant, Closed bought deal Lloyd property for reorganization and acquisition at shareholder approval gathering system Closed transaction to financing with $20M; Closed strategic recapitalization Michichi to furthe

  29. Slide 29: Schedule A, B

    SCHEDULE A, B SCHEDULE A: DRILLING LOCATIONS This presentation discloses drilling locations in three categories: (i) proved locations; (ii) probable locations; and (iii) unbooked locations. Proved locations and probable locations are derived from the Company's most recent independent reserves report

Marquee Energy — Q3 2015 Earnings Presentation on 6ix