Inpex Corporation · TSE:1605

Inpex — Investor Presentation (May 2010)

21 slides from Inpex's investor presentation, May 14, 2010

  1. Slide 1: Two LNG Projects - Ichthys and Abadi

    Two LNG Projects j ‐ Ichthys y and Abadi Ichthys LNG NG Project roject

  2. Slide 2: Ichthys Project Location

    Ichthys Project Location Abadi WA‐285‐P Ichthys Field WA‐285‐P/WA‐37‐R Ichthys Field & Adjacent Area 3 Extent of Ichthys Field 4

  3. Slide 3: Brief Summary of Permit; Exploration History

    Brief Summary of Permit  Permit Holders: INPEX Browse, Ltd. (76%) TOTAL E&P Australia (24%)  Exploration Term : Initial grant for WA‐285P in 1998. Renewal for 3rd term in progress.  Retention Lease (WA‐37R): 5 years from Sep. 21, 2009. Currently working towards obtaining Production License for WA

  4. Slide 4: Outline for Development Concept

    Outline for Development Concept  LNG Production: approx. 8.4 million ton per year  Condensate Production: approx. 100,000 barrel per day(Peak Rate)  LPG Production: approx. 1.6 million ton per year  Subsea S b Production P d ti Wells: W ll 30 wells ll att B Brewster, t 20 wells ll att Pl Plover

  5. Slide 5: Offshore Facility Layout; Subsea Well and Infield Flowlines

    Offshore Facility Layout 9 Subsea Well and Infield Flowlines 10

  6. Slide 6: CPF/FPSO; Gas Export Pipeline

    CPF/FPSO 11 Gas Export Pipeline  Specification – Size and Thickness : 42”x33.5 mm – Length : approx. 885 km – Allowable Pressure : 200 Bara – Material : X65 – Total Weight : approx. 800,000 ton – Water Depth at Route : approx. 250m ‐ 0m Image 12

  7. Slide 7: LNG Plant Site Location

    LNG Plant Site Location  Decided Onshore LNG Plant Site at Darwin – Announcement was issued at Darwin date on 26th Sep. 2008 – Messrs. Martin Ferguson, Australian Resources Minister and Paul Henderson Chief Minister NT attended 13 LNG Plant Site Location 14

  8. Slide 8: LNG Plant Layout; Module Offloading Facility

    LNG Plant Layout 15 Module Offloading Facility Image 16

  9. Slide 9: GHG (Greenhouse Gas) Management

    GHG (Greenhouse Gas) Management (1)  Situation in Australia ‐ Carbon Capture and Storage (CCS) Law (Offshore Petroleum Amendment (Greenhouse Gas Storage)) became effective in Nov. 2008 ‐ CCS acreages released in Mar Mar. 2009 ‐ Carbon Pollution Reduction Scheme (CPRS: emissions trading scheme) bill

  10. Slide 10: Contribution to Local Community; Development Schedule

    Contribution to Local Community 19 Development Schedule Submission of FID First Application of additional LNG Environmental information Approval Government Approvals Public Comments To obtain Environmental Approval Application of Production To obtain Production Licence Licence FEED Detailed Engineer

  11. Slide 11: Project Organization Chart; Exploration & Production Cost Trend

    Project Organization Chart 24% 76% TOTAL E&P Australia WA-285-P INPEX Browse, Ltd. Joint Venture (Operator) Tokyo Head Office Ichthys Project Committee Managing Director Perth Head of Project Senior Project Director Offshore Onshore Project Corporate Commercial Senior Advisor Coordination Coordinati

  12. Slide 12: Exploration & Production Cost Trend (Detail)

    Exploration & Production Cost Trend (Detail)  Facilities, Engineering and Labor Wages  Oil & Gas Production Facilities : Dropped approx. 15% in 2009 compared with 2008. However, an increase is expected by approx. 11% in 2010.  Engineering g g Fee : Remained at the same level as 2008.  Labor Wage

  13. Slide 13: LNG Market; Condensate Market

    LNG Market  Market: – Asia,North America,Europe  Buyers: In Asian region, Electric/Power companies and City Gas companies i Ja in Japan, a South Korea, Ko ea China, Chi a Taiwan, Tai a Singapore, Si a o e Thailand, Thaila d Indonesia I do e ia etc. et  Price: – Asian LNG Prices are generally link

  14. Slide 14: LPG Market; Taxation Scheme in Australia

    LPG Market  Market – U.S. is the largest LPG consumer in the world, while in Asia‐Pacific, China, India and Japan are the main consumers in the order of consumption. – Japan is the world largest LPG importer importing about 12 million ton per year. It accounts for approximately 80% of total consump

  15. Slide 15: Abadi LNG Project

    Ichthys Project History 29 Abadi LNG NG Project roject

  16. Slide 16: Masela PSC Block; Abadi Gas Field (1)

    Masela PSC Block 31 Abadi Gas Field (1)  Abadi Gas/Condensate Field - Water Depth: 400 ‐ 800m - Reservoir Depth: 3,700 ‐ 3,900m - Areal closure: more than 1,000km2  Discovered gas and condensate in Abadi‐1 exploration well in 2000  Drilled 6 additional appraisal wells, and confirmed the extension

  17. Slide 17: Abadi Gas Field (2); Production Sharing Contract

    Abadi Gas Field (2) 33 Production Sharing Contract  Contractor: INPEX Masela, Ltd. (90%)*  Effective Date: Nov. 16, 1998  Contract Period: 30 years  Exploration Period: 10 years (proceed to Development and Production Period in case of commercial discovery)  Contract Area : 3,221.3km2 (already p

  18. Slide 18: Plan of Development; Floating LNG

    Plan of Development  In Sep. 2008, INPEX submitted the Plan of Development (POD) of the Abadi gas field, and the Indonesian Government (BPMigas) approved the POD.  Development Concept as approved in the POD** ‐ Floating LNG ‐ Initial development focusing on the North block ‐ LNG production of 4.5M

  19. Slide 19: FLNG Layout; Development Schedule

    FLNG Layout Flare Living Utility Process Stack Quarter Area Area Turret Stern Bow Condensate Offloading LNG Loading Arm Hose Reel 37 Development Schedule Final Investment Decision(FID) First LNG Public Announcement Local hearing Government Environmental & Environmental Social Impact Permit Approval

  20. Slide 20: Organization of Project Implementation; Abadi Project History

    Organization of Project Implementation President Director Indonesia Masela Assets Asset Director Director Internal Strategic HSE Auditor Planning Gas & Pre- Legal & Petroleum Project Subsurface Facility GA & HR Finance Crude Oil Exploration Drilling Production Insurance Engineering Service Developme

  21. Slide 21: Current Status of FLNG undertaken by other Companies

    Current Status of FLNG undertaken by other Companies  Shell: LNG-FPSO (3.5 MMTPA) – Signed a master agreement with Technip/Samsung consortium for the design, construction and installation of multiple floating liquefied natural gas (FLNG) facilities over a period of up to fifteen years in July 2009