Slide 1: ETS Transition to MATS
ETS Transition to MATS E1-INTERNAL
Slide 2: Agenda
Agenda • Impacted Exchanges • Changes on the MATS side o Hybrid / Stepwise / Piecewise curve o Zero Volume Rule o Zero Volume in the Bid Matrix • eZ-Ops MATS UI Demo • RestAPI Changes on the eZ side o Portfolio Identifier o Optional Exchange Name to Get portfolios o Exchange Name in the Portfolio Li
Slide 3: Impacted Exchanges
Impacted Exchanges • Existing exchanges • New Exchanges(with API Availability) ETS transition to MATS – April 2025 3 E1-INTERNAL
Slide 4: Changes on the MATS side: Hybrid / Stepwise / Piecewise Curve
Changes on the MATS side : Hybrid / Stepwise / Piecewise Curve • Curve Types o Stepwise (BE/NL) – Keep sending as it is today o Piecewise (All other areas except BE/NL) – Keep sending as it is today o Hybrid Curve – Mix of Stepwise and Piecewise. Sample example below ETS transition to MATS – April 2
Slide 5: Changes on the MATS side: Zero Volume Rule
Changes on the MATS side : Zero Volume Rule • Zero Volume Curve Not Compatible in MATS MATS Compatible ETS transition to MATS – April 2025 5 E1-INTERNAL
Slide 6: Changes on the MATS side: Zero Volume in the Bid Matrix
Changes on the MATS side : Zero Volume in the Bid Matrix Not Compatible in MATS MATS Compatible ETS transition to MATS – April 2025 6 E1-INTERNAL
Slide 7: eZ-Ops MATS UI Demo
eZ-Ops MATS UI Demo DEMO ETS transition to MATS – April 2025 7 E1-INTERNAL
Slide 8: Changes on the eZ side – Auction Endpoints
Changes on the eZ side – Auction Endpoints - Portfolio identifier - ETS endpoints will no longer be supported ETS transition to MATS – April 2025 8 E1-INTERNAL
Slide 9: Changes on the eZ side – Get Portfolios Endpoint optional parameter
Changes on the eZ side – Get Portfolios Endpoint optional parameter - Optional ExchangeName in the GET Portfolios endpoint ETS transition to MATS – April 2025 9 E1-INTERNAL
Slide 10: Changes on the eZ side – Get portfolios Response
Changes on the eZ side – Get portfolios Response - ExchangeName in the response of Get Portfolios Endpoint ETS transition to MATS – April 2025 10 E1-INTERNAL
Slide 11: SDAC MTU Shift
SDAC MTU Shift ETS transition to MATS – April 2025 11 E1-INTERNAL
Slide 12: SDAC MTU Shift Contd.
SDAC MTU Shift Contd. ETS transition to MATS – April 2025 12 E1-INTERNAL
Slide 13: Testing Plan
Testing Plan Sl No Stages in MATS testing Simu environment Status 1 Retrieve Area/ Products/Portfolios Ready 2 Retrieve Portfolio Identifier for each exchange Portfolio Ready 3 Send Linear Order in MATS 3.1 - Stepwise for Belgium and NL Ready 3.2 - Piecewise for all areas except BE and NL Ready 4 Re
Slide 14: Onboarding Timeline
Onboarding Timeline - All clients – Simulation Onboarding (Simu1) can start from 6th May 2025. - The Customer Success Team will manage the creation and mapping of all timeseries required for customers who use the auction market result integration functionality in advance of the Production Go-Live. N