Gorilla Gold Mines Ltd · ASX:GG8

Gorilla Gold Mines — Merger or Acquisition (November 2026)

64 slides from Gorilla Gold Mines's merger presentation, Nov 18, 2026

  1. Slide 1: Acquisition of Cosmos Project from IGO and Appointment of Simon Lawson as Executive Chairman

    Not for release to US wire services or distribution in the United States rsonal use only ASX: GG8 Acquisition of Cosmos Project from IGO and Appointment of Simon Lawson as Executive Chairman A new chapter for Gorilla Gold in Western Australia 18 November 2026 1

  2. Slide 2: Disclaimer

    Disclaimer Nature of Document: This presentation has been prepared and issued by Gorilla Gold Mines Ltd (Company) to provide general information about the Company. The information in this document is in summary form and should not be relied upon as a complete and accurate representation of any matte

  3. Slide 3: Disclaimer - Recipients outside of Australia

    Disclaimer Recipients outside of Australia This presentation does not constitute an offer or invitation in any place in which, or to any person to whom, it would not be lawful to make such an offer or invitation. No action has been taken to register or qualify the New Shares or the Offer, or to othe

  4. Slide 4: Creating a substantially larger integrated WA gold business

    Creating a substantially larger integrated WA gold business rsonal use only EXISTING HIGH-GRADE A NEW GROWTH FRONT EXISTING PROCESSING WA PLATFORM AT COSMOS INFRASTRUCTURE 1.5Moz @ 3.8g/t Au1 across Comet Vale, Historical production of 1.1Mtpa concentrator and extensive site Mulwarrie and Vivien ~12

  5. Slide 5: Simon Lawson appointed as Executive Chairman

    Simon Lawson appointed as Executive Chairman Former Spartan Resources Executive Chairman returns to an executive role to help drive Gorilla’s next phase of growth. Highly regarded Australian mining executive Simon Lawson appointed as rsonal use only Executive Chairman of Gorilla Gold, transitioning

  6. Slide 6: Highly experienced team with a proven track record

    Highly experienced team with a proven track record Led by Executive Chairman Simon Lawson, who began his Australian mining career as Mine Geologist and Project Resource Geologist at Cosmos (2006-2010). rsonal use only Simon Lawson – Executive Chairman Charles Hughes – Chief Executive Officer Rameliu

  7. Slide 7: Introducing the Cosmos Project

    rsonal use only Introducing the Cosmos Project Image: Cosmos Project gorillagold8.com | ASX:GG8

  8. Slide 8: Transformational acquisition of the Cosmos Project

    Transformational acquisition of the Cosmos Project Gorilla has signed a binding share purchase agreement (SPA) to acquire 100% of IGO Cosmos Pty Ltd (IGO Cosmos), a wholly rsonal use only owned subsidiary of IGO Limited (IGO). IGO Cosmos owns 100% of the Cosmos Project (Cosmos) located ~30km north o

  9. Slide 9: Cosmos snapshot

    Cosmos snapshot ▪ Location: 30km from Leinster and 68km by sealed road from Gorilla's fully permitted Vivien Project rsonal use only ▪ Geology: Adjacent to the Bellevue Gold Project (MRE of 2.7Moz at 8.6g/t Au2) and sits within the same prospective geological setting ▪ High-grade production: Histori

  10. Slide 10: Cosmos: a high-grade gold opportunity in front of established infrastructure

    Cosmos: a high-grade gold opportunity in front of established infrastructure ▪ Limited gold exploration completed since Ramelius' historical gold mining operations at Cosmos concluded in 2016 Exceptional unexplored ▪ Simon Lawson commenced his mining career in Australia as a mine geologist at Cosmos

  11. Slide 11: Gold opportunity at Cosmos

    Gold opportunity at Cosmos The Cosmos Project hosts numerous highly prospective gold camps, including Main Road, Jones Creek, Orleans and several emerging regional targets1. rsonal use only Limited systematic gold-focused exploration across the Project over the past decade, with previous owners prim

  12. Slide 12: Exceptional high-grade gold drilling results at Cosmos

    Exceptional high-grade gold drilling results at Cosmos Historical drilling at Cosmos confirms unmined, high-grade mineralisation entirely open and untested by modern exploration. Rank Area Prospect at Cosmos Hole From Depth (m) Intercept Gram × Metres 1 Main Road NE Stockwork KVP196 18 20.0m @ 40.3

  13. Slide 13: Main Road

    Main Road Last mined by Giralia in 1991 at 3.3g/t Au1, Main Road sits within a ~4km mineralised trend with significant oxide and sulphide upside. The Main Road Trend is centred on the historical rsonal use only Main Road oxide pit. Historical drilling has largely focused on shallow oxide mineralisat

  14. Slide 14: Main Road

    Main Road Last mined by Giralia in 1991 at 3.3g/t Au1, Main Road sits within a ~4km mineralised trend with significant oxide and sulphide upside. rsonal use only Main Road Notes: 1. Department of Mines, Petroleum and Exploration (DMPE), MINEDEX: Mines and Mineral Deposits Database, Site S0002721 ‘Ma

  15. Slide 15: Main Road

    Main Road Multiple DHEM and MLEM plates define high-priority sulphide targets across the ~4 km Main Road trend, beneath and beyond the historic oxide workings. rsonal use only gorillagold8.com | ASX:GG8 15

  16. Slide 16: Jones Creek System

    Jones Creek System >5km long structural system with 4 recent producing high-grade gold pits last mined by Ramelius between 2015-2016. The Jones Creek System remains poorly tested below ~50m depth. rsonal use only Located within the same prospective geological setting as Bellevue. Multiple high-grade

  17. Slide 17: Jones Creek System – Yellow Aster, Nil Desperandum and Mossbecker

    Jones Creek System – Yellow Aster, Nil Desperandum and Mossbecker Four high-grade gold pits last mined by Ramelius between 2015 and 2016 demonstrate a >5 km mineralised system with substantial exploration upside between and beneath the historic workings. rsonal use only Yellow Aster North Yellow Ast

  18. Slide 18: Jones Creek System – Mossbecker

    Jones Creek System – Mossbecker Last mined by Ramelius in 2016, Mossbecker is a high-grade gold pit sitting on the >5 km Jones Creek structural system, where historic mining appears to have tested only a small part of the broader mineralised corridor. rsonal use only Mossbecker pit gorillagold8.com

  19. Slide 19: Jones Creek System – Nil Desperandum

    Jones Creek System – Nil Desperandum Last mined by Ramelius in 2016, Nil Desperandum is a high-grade open-pit within the >5 km Jones Creek structural system, with mineralisation extending beneath and beyond the limits of historic mining. rsonal use only Nil Desperandum pit gorillagold8.com | ASX:GG8

  20. Slide 20: Orleans

    Orleans Last mined by Plutonic in 1996, Orleans is a historic oxide gold pit with near-term cut-back potential and limited exploration along strike and at depth. rsonal use only Adjacent to the Bellevue Gold Project, which hosts a MRE of 2.7Moz at 8.6g/t Au1. Located within the same prospective geol

  21. Slide 21: Orleans

    Orleans Historic oxide pit with growth upside and immediate cut-back potential. rsonal use only gorillagold8.com | ASX:GG8 21

  22. Slide 22: Regional exploration

    Regional exploration Additional gold and base metal targets across the tenement package, largely untested by drilling. South-East Greenfields rsonal use only • Regional-scale Au exploration target: ~2.5km aircore anomaly, tested to only 50m depth • Sits alongside BHP's Camelot Ni resource (mined as

  23. Slide 23: Nickel provides additional long-term optionality

    Nickel provides additional long-term optionality Substantial historical nickel inventory exists at Cosmos, providing long term nickel optionality. ▪ Nickel rights at Cosmos are included as part of the rsonal use only proposed transaction ▪ Gorilla to acquire all mineral rights at Cosmos other than l

  24. Slide 24: Cosmos Infrastructure

    rsonal use only Cosmos Infrastructure Image: Cosmos Project gorillagold8.com | ASX:GG8

  25. Slide 25: Cosmos processing plant

    Cosmos processing plant 1.1Mtpa concentrator refurbished and upgraded in 2023, providing a potentially more capital- efficient pathway to gold production. rsonal use only ▪ GRES completed the refurbishment and upgrade of the Cosmos processing plant to a 1.1Mtpa concentrator in 2023 ▪ The plant has b

  26. Slide 26: Recently Refurbished Plant – Accelerating the Pathway to Gold Production

    Recently Refurbished Plant – Accelerating the Pathway to Gold Production Recently refurbished in 2023, the 1.1Mtpa Cosmos concentrator provides an established processing platform with the potential to materially reduce capital requirements and accelerate the pathway to gold production. rsonal use on

  27. Slide 27: Processing Infrastructure Underpins Future Gold Production Strategy

    Processing Infrastructure Underpins Future Gold Production Strategy rsonal use only gorillagold8.com | ASX:GG8 27

  28. Slide 28: Other site infrastructure

    Other site infrastructure Acquisition includes a substantial portfolio of established non- process infrastructure (NPI), supporting site operations and providing a foundation for future gold development. rsonal use only Infrastructure Overview ▪ Existing operational aerodrome which, subject to licen

  29. Slide 29: Large existing camp site at Cosmos

    Large existing camp site at Cosmos Large ~450-person camp in place and acquired as part of the acquisition. ▪ 450-person1 camp acquired as part of the rsonal use only acquisition, worth ~$45 million to replicate at today’s estimated ~$100k per room2 construction rates ▪ ~259 rooms1 currently conside

  30. Slide 30: Transaction details

    rsonal use only Transaction details Image: Cosmos Project gorillagold8.com | ASX:GG8

  31. Slide 31: Acquisition Terms

    Acquisition Terms1 Key term Summary Share purchase agreement for 100% of the issued shares in IGO Cosmos Pty Ltd, the entity holding the tenements, technical information, legal agreements and site infrastructure comprising Structure the Cosmos Project. rsonal use only • Such number of fully paid ord

  32. Slide 32: Equity Raising Overview

    Equity Raising Overview Key term Summary ▪ Gorilla is conducting a two-tranche placement of approximately 226.4 million fully paid ordinary shares to institutional and sophisticated investors, to raise rsonal use only approximately A$60m (“Placement” or “Offer”) ▪ Tranche 1: approximately 182.5 mill

  33. Slide 33: Pro forma capital structure

    Pro forma capital structure Gorilla pro-forma Unit Current Gorilla1,4 Capital raising Cosmos Acquisition Pro-Forma Gorilla rsonal use only Offer Price $/sh 0.265 0.265 0.265 0.265 No. of Ordinary Shares m 732.7 226.4 238.3 1197.3 Market Capitalisation4 A$m 194.2 60.0 63.1 317.3 Cash2,3 A$m 9.5 60.0

  34. Slide 34: Source and uses of funds

    Source and uses of funds A$60m capital raising to unlock the exploration potential of Cosmos and continue driving growth at Vivien and the North Kalgoorlie Hub. Sources of Funds A$m rsonal use only Existing Cash (30-September-26) 9.5 Capital raising (before costs) 60.0 Total Sources 69.5 Uses of Fun

  35. Slide 35: Indicative timetable

    Indicative timetable Acquisition completion targeted during January 2027. Indicative timetable1 Indicative Date rsonal use only Settlement of Offer Shares (Tranche 1) 25 November 2026 Allotment of Offer Shares (Tranche 1) 26 November 2026 Notice of Meeting sent to shareholders Early December 2026 Go

  36. Slide 36: Overview of Gorilla

    rsonal use only Overview of Gorilla Image: Cosmos Project gorillagold8.com | ASX:GG8

  37. Slide 37: Corporate overview

    Corporate overview GG8 Share Price (since Jan-25) A$/sh Post Acquisition 0.60 Market Data Units Today and capital raise 0.55 rsonal use only Offer Price $/sh 0.265 0.265 0.50 Shares on issue m 732.7 1197.3 0.45 Market Capitalisation A$m 194.2 317.3 0.40 Cash as at 30 September 2026 A$m 9.5 69.5 0.35

  38. Slide 38: Proven track record in exploration and creating shareholder value

    Proven track record in exploration and creating shareholder value Gorilla directors and management have a successful track record in acquiring and exploring highly prospective projects. Market Capitalisation (A$m)1 during tenure of GG8 team rsonal use only Simon Lawson Craig Jones Alex Hewlett Kelvi

  39. Slide 39: North Kalgoorlie Gold Hub – 1.2Moz @ 3.7g/t Au

    North Kalgoorlie Gold Hub – 1.2Moz @ 3.7g/t Au Gorilla’s flagship growth platform in WA. District-scale upside rsonal use only • MRE 1.2Moz at 3.7g/t Au1 current Resource base • ~64km of mineralised structures identified • Only 5.5km tested for 1.2Moz at Comet Vale and Mulwarrie • Significant explor

  40. Slide 40: North Kalgoorlie Gold Hub – New discoveries driving next leg of growth

    North Kalgoorlie Gold Hub – New discoveries driving next leg of growth 64km of targets, 5.5km drilled for high-grade 1.2Moz Resource base. rsonal use only Notes: 1. Refer to Gorilla ASX releases titled “Mulwarrie Resource Update” dated 4 August 2025 and “Major Resource Upgrade for Comet Vale” dated

  41. Slide 41: Comet Vale – 860,000oz @ 3.7 g/t Au and growing

    Comet Vale – 860,000oz @ 3.7 g/t Au and growing High-grade camp, multiple new discoveries on granted Mining Leases next to the Goldfields Highway. Camp-scale mineralisation rsonal use only 9x5km zone of complex faulting, shearing and mineralisation – highly prospective Simple targeting Surface geoch

  42. Slide 42: Comet Vale – Cheer and Lakeview

    Comet Vale – Cheer and Lakeview rsonal use only gorillagold8.com | ASX:GG8 42

  43. Slide 43: Comet Vale: Exploration, growth and conversion targets

    Comet Vale: Exploration, growth and conversion targets Broad-spaced drilling discovering multiple new zones of high-grade mineralisation Donkey Kong and Diddy Kong rsonal use only First drilling into two 1km soil anomalies returned significant shallow gold mineralisation Magilla Discovery Initial dr

  44. Slide 44: Mulwarrie – Significant regional growth upside

    Mulwarrie – Significant regional growth upside 350,000oz @ 3.6g/t Au1 from surface, next to Davyhurst haul road and 10km from the closest mill Camp-scale mineralisation rsonal use only Multiple major mineralised structures, including Mulwarrie, Lady Gladys and Little Gem structure Simple targeting S

  45. Slide 45: Mulwarrie – Significant regional growth upside

    Mulwarrie – Significant regional growth upside rsonal use only gorillagold8.com | ASX:GG8 45

  46. Slide 46: Vivien – Permitted high-grade gold mine with major growth upside

    Vivien – Permitted high-grade gold mine with major growth upside 4km from the closest mill Existing high-grade Resource: rsonal use only • 278,000oz @ 4.1g/t Au1 • Established high-grade underground gold system with multiple growth targets Fully Permitted Underground Opportunity • Mining by Ramelius

  47. Slide 47: Vivien – Permitted high-grade gold mine with major growth upside

    Vivien – Permitted high-grade gold mine with major growth upside rsonal use only gorillagold8.com | ASX:GG8 47

  48. Slide 48: Vivien – Significant high-grade discovery at Vince

    Vivien – Significant high-grade discovery at Vince High-grade discovery at a previously untested parallel structure to Vivien Main rsonal use only Parallel structure to Vivien Main • This is the biggest Vivien-style structure at the project Previously untested target • Conceptual structural target •

  49. Slide 49: Mineral Resources

    rsonal use only Mineral Resources Image: Cosmos Project gorillagold8.com | ASX:GG8

  50. Slide 50: Mineral Resource Statements

    Mineral Resource Statements Global Mineral Resource – Australia and Canada rsonal use only Indicated Inferred Total Category Tonnage (Mt) Au Grade (g/t) Au Moz Tonnage (Mt) Au Grade (g/t) Au Moz Tonnage (Mt) Au Grade (g/t) Au Moz Comet Vale 1.7 4.1 0.22 5.6 3.5 0.64 7.3 3.7 0.86 Mulwarrie 1.3 2.8 0.

  51. Slide 51: Mineral Resource Statements – Comet Vale Gold Project

    Mineral Resource Statements Comet Vale Gold Project Method Category Tonnes (kt) Grade (Au g/t) Au (koz) rsonal use only Open Pit Indicated 1,300 4.3 180 Inferred 2,400 2.3 180 Sub-total 3,700 3.0 350 Underground Indicated 400 3.7 50 Inferred 3,200 4.5 460 Sub-total 3,600 4.4 510 Total All Categories

  52. Slide 52: Mineral Resource Statements – Mulwarrie Gold Project

    Mineral Resource Statements Mulwarrie Gold Project Method Category Tonnes (kt) Grade (Au g/t) Au (koz) rsonal use only Open Pit Indicated 1,200 2.7 110 Inferred 850 4.0 110 Sub-total 2,100 3.3 220 Underground Indicated 34 3.1 3.3 Inferred 900 4.3 130 Sub-total 940 4.3 130 Total All Categories 3,000

  53. Slide 53: Mineral Resource Statements – Vivien Gold Project

    Mineral Resource Statements Vivien Gold Project rsonal use only Category Tonnage (Mt) Grade (Au g/t) Au (koz) Indicated 0.15 4.9 24 Inferred 1.95 4.1 254 Total 2.1 4.1 278 Notes: 1. Open Pit (OP) resources are constrained within optimised pit shells based on A$3,500 per ounce gold price and reported

  54. Slide 54: Mineral Resource Statements – Labyrinth Gold Project

    Mineral Resource Statements Labyrinth Gold Project rsonal use only Lode Tonnes (Mt) Grade (Au g/t) Au (koz) Boucher 1 5.7 190 McDowell 1 4.5 150 Talus 0.7 5.3 110 Front West 0.2 2.7 20 Shaft 0.1 5.5 30 Total (Inferred) 3.0 5.0 500 Notes: 1. Reported at a 3g/t.m accumulation (grade x vein thickness)

  55. Slide 55: Relevant Releases

    Relevant Releases This presentation refers to the following historical ASX announcements: • Acquisition of Cosmos and Simon Lawson to Exec Chairman (refer ASX Announcement • Major Resource Upgrade for Comet Vale (refer ASX Announcement 15 December 2025) 16 November 2026) rsonal use only • Mulwarrie

  56. Slide 56: Appendix A: Key Risks

    rsonal use only Appendix A: Key Risks Image: Cosmos Project gorillagold8.com | ASX:GG8

  57. Slide 57: Key Risks

    Key Risks ▪ A number of risks and uncertainties, which are both specific to Gorilla and/or the Cosmos Project and of a more general nature, or which relate to the acquisition of the Cosmos Project, may affect the future operating and financial performance of Gorilla and the value of its securities.

  58. Slide 58: Key Risks

    Key Risks ▪ At present, the Cosmos Project is not generating any revenue. There can be no assurance that significant losses will not occur in the near future or that the Company will be profitable in the future. There can also be no assurance that the underlying assumed levels of expenses will prove

  59. Slide 59: Key Risks

    Key Risks ▪ The Company’s activities are subject to potential risks and liabilities associated with the potential pollution of the environment and the necessary disposal of mining waste products resulting from mineral exploration. Insurance against environmental risk (including potential liability f

  60. Slide 60: Appendix B: International Offer Restrictions

    rsonal use only Appendix B: International Offer Restrictions Image: Cosmos Project gorillagold8.com | ASX:GG8

  61. Slide 61: International Offer Restrictions

    International Offer Restrictions This document does not constitute an offer of new ordinary shares (“New Shares”) of the Company in any jurisdiction in which it would be unlawful. In particular, this document may not be distributed to any person, and the New Shares may not be offered or sold, in any

  62. Slide 62: International Offer Restrictions

    International Offer Restrictions This document does not constitute an offer of new ordinary shares (“New Shares”) of the Company in any jurisdiction in which it would be unlawful. In particular, this document may not be distributed to any person, and the New Shares may not be offered or sold, in any

  63. Slide 63: International Offer Restrictions

    International Offer Restrictions This document does not constitute an offer of new ordinary shares (“New Shares”) of the Company in any jurisdiction in which it would be unlawful. In particular, this document may not be distributed to any person, and the New Shares may not be offered or sold, in any

  64. Slide 64: Contact

    rsonal use only Contact Charles Hughes | CEO admin@gg8.com.au www.gorillagold8.com.au gorillagold8.com | ASX:GG8

Gorilla Gold Mines — Merger or Acquisition (November 2026) on 6ix