Southern Hemisphere Mining Limited · ASX:SUH

Southern Hemisphere Mining — Euroz Rottnest Conference 2010

25 slides from Southern Hemisphere Mining's conference presentation, 2010

  1. Slide 1: Southern Hemisphere Mining Limited Investor Presentation – Euroz Rottnest Conference

    Slide 1: Southern Hemisphere Mining Limited Investor Presentation – Euroz Rottnest Conference

    Southern Hemisphere Mining Limited Investor Presentation – Euroz Rottnest Conference Trevor Tennant – Chairman and Managing Director

  2. Slide 2: Disclaimer Notice

    Slide 2: Disclaimer Notice

    Disclaimer Notice This Presentation contains certain forward –looking information and forecasts. Such forecasts , projections and information are not a guarantee of the Company’s future performance and include unknown risks and uncertainties. Accordingly, the actual results and developments may diff

  3. Slide 3: Overview

    Slide 3: Overview

    Overview Los Pumas Project location  Dual listed exploration company focused on early development of Los Pumas Manganese Project in Northern Chile  Completed a secondary listing on the ASX in January 2010  ASX Code: SUH Company Focus  Los Pumas Manganese Project – target completion of project fe

  4. Slide 4: SUH Share Price since listing; Capital Structure

    Slide 4: SUH Share Price since listing; Capital Structure

    Southern Hemisphere SUH Share Price since listing  Listed on ASX - 5 January 2010 $0.60 5,000,000 $0.50 4,000,000  Major shareholders include Board of $0.40 3,000,000 Directors and independent Chinese $0.30 2,000,000 investors $0.20 $0.10 1,000,000  Fully funded to complete Los Pumas $0.00 0 Mang

  5. Slide 5: Board of Directors

    Slide 5: Board of Directors

    Board of Directors Chairman and Managing Director Non-Executive Director  mining engineer with over 37  over 25 years experience in mine Trevor Tennant years experience Eduardo Valenzuela operations, technical services and  previous executive director of project financing Portman, OMH and Territo

  6. Slide 6: Mining in Chile

    Slide 6: Mining in Chile

    Mining in Chile  The largest copper producer in the world  Strong mining history with westernised regulations  Robust, growing economy and stable government  Australia, Canada, USA, EU, China, Japan, South Korea, Mexico and European Free Trade Association have free trade agreements  Los Pumas P

  7. Slide 7: Manganese market

    Slide 7: Manganese market

    Manganese market  Manganese is primarily used in steel production with no suitable substitute  Increasing steel production (especially in China) is increasing the demand for Manganese Manganese Price History (44% Mn) 18  Market fundamentals are changing, 15 leading to increased Chinese imports Ma

  8. Slide 8: Los Pumas Manganese Project

    Slide 8: Los Pumas Manganese Project

    Los Pumas Manganese Project Los Pumas Regional Location Map  Large, easy to mine JORC Inferred Resource  Low capital and operating costs expected  Excellent logistics and near mine infrastructure  Shallow mineralisation with low strip ratio  Beneficiates using heavy liquid separation  High man

  9. Slide 9: Potential Development Scenario

    Slide 9: Potential Development Scenario

    Potential Development Scenario  Initial 15Mt Inferred Resource targeting annual production of 400kt with plant designed to 500ktpa (38% Mn, 0.8% Fe, 20% SiO2 and 0.06% P)  Provisional MOU with senior shareholder to purchase 150kt of product per annum  Targeting initial shipment second half 2011 

  10. Slide 10: Project Infrastructure

    Slide 10: Project Infrastructure

    Project Infrastructure Arica Port Undercover stockpile warehouse Ship loading conveyor system Port Infrastructure  Arica Port 170km by road from Los Pumas with bulk loading capabilities for Handymax ships  Undercover stockpile facilities available (used for zinc concentrates from Bolivia)  Additi

  11. Slide 11: Project Infrastructure

    Slide 11: Project Infrastructure

    Project Infrastructure Arica – La Paz Rail Line Arica – La Paz Highway Project Access Road Transport logistics  Major arterial highway from Arica to La Paz 40kms from Los Pumas  Rail line between Arica to La Paz less than 11km from Los Pumas – considered for re-commissioning by Chilean Government

  12. Slide 12: Project Infrastructure

    Slide 12: Project Infrastructure

    Project Infrastructure Proposed Mine Camp/Hotel at Putre Regional Capital of Arica Arica Chacalutta Airport Mine Camp  Mine camp/hotel available at Putre – established by Shell to service a large mine workforce at mothballed gold mine  Regional capital Arica serviced by daily domestic flights from

  13. Slide 13: Geology

    Slide 13: Geology

    Geology Los Pumas Project Area DDH drilling at Los Pumas  Tabular flat mantle near surface  Resource at 0-30m depth with low strip ratio  Past artisan mining activity evident

  14. Slide 14: Geology

    Slide 14: Geology

    Geology Mineralisation is flat, shallow and easy to mine, outcropping, to a maximum depth of 30m Los Pumas Cross Section of the North Sector Los Pumas Major Geological Features Taapaca Volcano Los Pumas Project Area Taapaca Volcanic Complex (TVC) Lauca Ignimbrite (PII) Huaylas Formation (Msh) Los Pu

  15. Slide 15: Ore Resource

    Slide 15: Ore Resource

    Ore Resource Los Pumas Regional Map  Current JORC Inferred Resource of 15Mt @ 10%Mn1  Infill drill program completed in February  Awaiting new resource estimate from Coffey Mining  Opportunities for increasing tonnages at Los Pumas and other sites are high Notes: 1. Using a 6% Mn cut-off

  16. Slide 16: Metallurgy

    Slide 16: Metallurgy

    Metallurgy Los Pumas Drill Core Regional Artisanal Workings  Test work from surface grab samples using heavy liquid at an S.G. of 3.0 – average of 37.4% Mn, 1.4% Fe, 22.3% SiO2 and 0.07% P  Exceptionally high Mn to Fe ratio of 26 makes product highly attractive to smelters

  17. Slide 17: Metallurgy

    Slide 17: Metallurgy

    Metallurgy Heavy liquid separation tests on core samples were designed to test yields and product grades from different litho units that comprise the Los Pumas Manganese deposit. An initial review of the results indicate that the intermediate mantle litho unit delivers the most promising results. Th

  18. Slide 18: Regional Exploration

    Slide 18: Regional Exploration

    Regional Exploration Regional map of exploration potential  Mineralisation known since World War II but potential not assessed previously  Other regional manganese targets identified

  19. Slide 19: Project Status

    Slide 19: Project Status

    Project Status  Identified the Los Pumas Project in 2008  Key tasks completed:  340 RC drill holes  32 Diamond Drill holes  Inferred Ore Resource estimated – independent recalculation underway  Hydrology Report complete  Crushability and SG tests on core samples  Concept design of process pl

  20. Slide 20: Targeted Milestones

    Slide 20: Targeted Milestones

    Targeted Milestones March 2010 Revised resource estimate Third quarter 2010 Completion of Definitive Feasibility Study Second half 2010 Raise capital for project development Second half 2011 First shipment

  21. Slide 21: Copper/Gold Projects

    Slide 21: Copper/Gold Projects

    Copper/Gold Copper/ Gold Projects Projects 21

  22. Slide 22: Chitigua Copper Project

    Slide 22: Chitigua Copper Project

    480000 490000 Chitigua Copper Project * | SOUTHERN +) HEMISPHERE mining limited 480000 490000 510000 520000 530000 22

  23. Slide 23: Copper/Gold Exploration Projects

    Slide 23: Copper/Gold Exploration Projects

    Copper/Gold Exploration Projects Historical open cut at La Cuyana in the Central Cluster Historical mining activity at Tres Cruces in the Central Cluster  Large portfolio of exploration projects throughout Chile over 800km2  Held in four clusters: – Calama – Salamanca – Southern – Central

  24. Slide 24: Copper/Gold Exploration Projects

    Slide 24: Copper/Gold Exploration Projects

    Copper/Gold Exploration Projects Initial exploration work to be focused on a small number of projects - a preferred target will be drill tested Calama Cluster Chitigua Project  porphry copper on controlling structure to some of world’s largest copper mines Salamanca Cluster Las Santas Project  por

  25. Slide 25: Summary

    Slide 25: Summary

    Summary  Los Pumas Manganese Project – large easy to mine JORC Inferred Resource – low capital and operating costs expected – excellent logistics and near mine infrastructure – shallow ore body with low strip ratio – beneficiates using heavy liquid separation – high manganese to iron ratio and low

Source: Internet Archive copy of shmining.com.au

More decks from Southern Hemisphere Mining Limited

All 40 Southern Hemisphere Mining decks