Pt Trimegah Bangun Persada Tbk · IDX:NCKL

Pt Trimegah Bangun Persada Tbk — H1 2023 Earnings Presentation

26 slides from Pt Trimegah Bangun Persada Tbk's earnings presentation, 2023

  1. Slide 1: Analyst/Investor Briefing 1H 2023

    Dari Obi Untuk WSTBP PT TRIMEGAH BANGUN PERSADA TBK Judoucsia Analyst/Investor Briefing 1H 2023

  2. Slide 2: Disclaimer

    Disclaimer By attending the meeting where this presentation is made, or by reading the presentation materials, you are agreeing to maintain absolute confidentiality regarding the information disclosed in this document and to be bound by the following limitations: You must read the following before c

  3. Slide 3: Agenda

    Agenda Company Overview Operation Overview Financial Overview

  4. Slide 4: Company Overview

    Dari Obi Untuk 1 Company Overview

  5. Slide 5: Company Overview

    Company Overview TBP is a pure-play integrated operator of nickel mining and smelters in Indonesia with growing exposure to battery segment Large Upstream Resource Base Vertically Integrated Nickel Operations Total reserves of 168.9mt1 across Presence from upstream mining to downstream 2 operating m

  6. Slide 6: History and Key Milestones

    History and Key Milestones 2005 2006/07 2009 2010 2017 Commenced regional • GPS obtained an exploration • Started exploration and mining • Obtained IUP for Kawasi Mine Expanded investments in geological mapping permit for Loji in 2006 development at Kawasi Mine and commenced mining downstream smelti

  7. Slide 7: TBP Group Structure and Portfolio Overview

    TBP Group Structure and Portfolio Overview Comprehensive Nickel Value Chain Presence on the Obi Island Upstream Midstream Downstream RKEF technology Saprolite Ferronickel Stainless Steel Nickel Sulfate Industrial Cathode HPAL technology Zone Limonite MHP Precursor EV Battery Cobalt Sulfate Recycling

  8. Slide 8: TBP Group Structure and Portfolio Overview

    TBP Group Structure and Portfolio Overview Short Transportation Distance Between Assets All production facilities and supporting infrastructures are strategically planned and built in the west part of Obi Island with short transportation distance, resulting in lower operating expense and additional

  9. Slide 9: Strong Commitment to Sustainability and Contributing to the UN SDGs

    Strong Commitment to Sustainability and Contributing to the UN SDGs Governance Environmental Corporate governance: ensuring Land: waste and wastewater integrity and ethical behavior as core management, optimal surface water tenets of the company management and quality monitoring, Occupational health

  10. Slide 10: Key Investment Highlights

    Key Investment Highlights Existing And Growing Exposure To Key Battery Material Products Obi Island Integrated Pure-play Nickel Player With Low Operating Costs Vertically Integrated Operations Located on Obi Island With Operational Synergies Strategic Partnerships With Companies In Nickel Value Chai

  11. Slide 11: Operations Overview

    Dari Obi Untuk WSTBP Judonedia 2 Operations Overview

  12. Slide 12: Mining Operations

    Mining Operations Mining Production Output (million wmt) Nickel Ore Sales (million wmt) YoY CAGR=50% 10.72 140% YoY 9.34 CAGR=137% 75% 7.77 6.49 4.76 6.29 3.22 3.89 6.48 3.59 3.71 5.89 4.30 3.42 2.60 1.38 2.36 4.43 2.03 2.87 2.86 1.34 1.29 1.38 1.56 1.88 2.19 0.86 0.84 FY 2020 FY 2021 FY 2022 1H 202

  13. Slide 13: HPAL Operations Snapshot

    HPAL Operations — 1 HPAL Operations Snapshot HPL started construction of HPAL Project since mid 2018; started production in June 2021 from 2 production lines with total designed 1 capacity of 37,000 tons contained Ni/year MHP (Mixed Hydroxite Precipitate); and it is the first MHP producer in Indones

  14. Slide 14: HPAL Production Output and Sales Volume

    HPAL Operations — 2 HPAL Production Output (In ton) HPAL Sales Volume (In ton) YoY MHP Ni 42,310 YoY YoY MHP Ni 46% YoY MHP Ni MHP Ni =217% =233% 42,251 22% 30,002 20,585 23,969 19,588 13,349 12,671 2,797 5,303 3,178 1,290 1,811 2,693 5,317 2,573 2,551 1,721 FY 2021 FY 2022 1H 2022 1H 2023 FY 2021 F

  15. Slide 15: Second HPAL Project – PT ONC

    HPAL Operations — 3 Second HPAL Project – PT ONC TBP has started further expansion plan to increase MHP 1 production output through PT Obi Nickel Cobalt (ONC). PT ONC has started construction of the second HPAL project in mid 2022; which will have 3 production lines 2 with annual capacity of 65,000

  16. Slide 16: RKEF Smelter Snapshot

    RKEF Operations — 1 RKEF Smelter Snapshot First RKEF Smelter – PT Megah Surya Pertiwi (“MSP”) • Commenced full operation since early 2017; MSP has 4 production lines with annual production output of 25,000 tons contained Ni/year and currently run full capacity Second RKEF Smelter – PT Halmahera Jaya

  17. Slide 17: Ferronickel Production Output and Sales Volume

    RKEF Operations — 2 Ferronickel Production Output (In metal ton) Ferronickel Sales Volume (In metal ton) YoY YoY 186% 171% 37,550 37,756 CAGR=5% CAGR=7% 23,676 22,824 26,047 26,182 22,921 25,372 25,302 21,956 13,910 14,932 13,119 13,874 FY 2020 FY 2021 FY 2022 1H 2022 1H 2023 FY 2020 FY 2021 FY 2022

  18. Slide 18: Financial Overview

    Dari Obi Untuk WsTEP Yudoucsca 3 Financial Overview

  19. Slide 19: Profit & Loss Statements Highlights – 1H22 vs 1H23

    Profit & Loss Statements Highlights – 1H22 vs 1H23 Revenue Gross Profit and Margin Margin USD (in million) IDR (in billion) 48% 55% 49% 55% 34% CAGR YoY Commentary 53% 89% CAGR 55% YoY 643 680 315 314 17% ▪ Strong track record of 575 9,568 10,242 4,514 4,675 232 revenue growth driven by 8,229 207 27

  20. Slide 20: Profit & Loss Statements

    Profit & Loss Statements For the six-months For the years ended, Dec 31 period ended, June 30 Exchange rate USD/IDR 14,572 14,312 14,876 14,445 15,071 Commentary In IDR billion Audited Audited Audited Unaudited Unaudited FY020 FY21 FY22 1H 2022 1H 2023 ▪ Share in profit of associates’ Revenue 4,072

  21. Slide 21: Profit & Loss Statements of QoQ

    Profit & Loss Statements of QoQ In IDR billion In thousand USD Exchange rate USD/IDR 15,243 14,866 15,243 14,866 Unaudited Unaudited Unaudited Unaudited Q1 2023 Q2 2023 Variance Variance (%) Q1 2023 Q2 2023 Commentary Revenue 4,786 5,456 670 14% 314,005 367,019 Cost of good sold (3,220) (3,524) (304

  22. Slide 22: Average Selling Price

    Average Selling Price Limonite Ore (USD/wmt) Saprolite Ore (USD/wmt) Commentary YoY -18% YoY YoY -13% ▪ ASP nickel ores decreased due to 29% CAGR 30.84 33% the decrease of MEMR’s Reference 28.04 25.36 56.57 62.44 54.05 Price which has a direct link to LME, 21.74 although, there is a time-lag with th

  23. Slide 23: Cash Costs

    Cash Costs Limonite Ore (USD/wmt) Saprolite Ore (USD/wmt) Commentary YoY ▪ Both cash cost Saprolite CAGR CAGR -6% 13% and Cash Cost Limonite 137% YoY 26.72 slightly decreased in 1H 7.89 7.45 -9% 7.03 2023. 13.06 16.66 17.08 15.56 ▪ HPAL Cash Cost before 4.15 cobalt credit slightly up in 1.41 FY22 bu

  24. Slide 24: QoQ Highlight

    QoQ Highlight Nickel Ore (USD/wmt) HPAL Products (USD/t) Commentary Limonite Saprolite MHP Ni MHP Co NiSO₄ ▪ Limonite and saprolite -15% -12% -13% encountered a higher drop in 19,396 60.17 17,793 15,725 16,945 16,962 their ASP than in their Cash -22% 51.04 -10% Cost, resulting in lower 10,464 margin

  25. Slide 25: Capital Expenditures

    Capital Expenditures USD (in million) IDR (in billion) Historical Capital Expenditure 586 8,721 554 499 8,206 7,925 Commentary 7,271 7,828 ▪ Capex has grown from IDR 7.3T in FY 2020 to IDR 8.7T in FY 7,258 2022. Primarily consists of smelter projects, heavy equipment and vehicles. 324 ▪ At the end o

  26. Slide 26: Thank You

    THANK YOU For further information, please contact: Lukito Gozali – Head of Investor Relations PT Trimegah Bangun Persada Tbk. – Head Office Gedung Bank Panin Lt. 2 Jl. Jenderal Sudirman, Jakarta Pusat 10270, Indonesia www.tbpnickel.com | investor.relations@haritanickel.com