21 slides from Greenroc Strategic Materials's investor presentation, Sep 28, 2022
Slide 1: Greenroc Mining Plc. IMC presentation, September 28th 2022
Greenroc Mining Plc. IMC presentation, September 28th 2022
Slide 2: Disclaimer
Disclaimer Important: You must read the following disclaimer before continuing. The following disclaimer applies to the following presentation and you are therefore advised to read Not withstanding the above, this Presentation is only being given to persons reasonably believed by the Company to be (
Slide 3: Disclaimer
Nothing in the Presentation is, or should be relied on as, a promise or representation as This Presentation and its contents are confidential and you and your directors, officers, to the future. This Presentation contains certain forward-looking statements relating to employees, agents and affiliate
Slide 4: Overview
Overview Business objective: Responsible production of graphite raw material for Li-battery anodes, supplying the downstream sector of Inglefield, multi-element EV battery makers in Europe TBS, titanium Melville Bay, iron 01 Portfolio of high-grade - Amitsoq: super high-grade graphite for EV sector
Slide 5: Management Team
Management Team Track record of value generation and proven expertise in the key disciplines required to fast-track projects through to development and production Stefan Bernstein George Frangeskides Jim Wynn Mark Austin Lars Brünner Mark Rachovides Chief Executive Officer Finance Director Non-Execu
Slide 6: Amitsoq: Super High-Grade Graphite
Amitsoq Super High-Grade Graphite 06 | Investor Presentation
Slide 7: Electric car batteries need graphite
Electric car batteries need graphite • EV Li-ion batteries contain more graphite than any other raw materials Li-ion battery components component by weight by weight • An average EV battery carries 40-80kg of coated high purity spherical graphite (cHPSG) or ca 1kg cHPSG per kWh oxy co gen • Producti
Slide 8: Some of the world's highest graphite grades
Some of the world’s highest graphite grades Amitsoq Island • Located in Nanortalik region of southern Greenland; • Ice-free year round enabling easy shipping • Previously operating mine • JORC Resource 8.28 Mt @ 19.75% graphite • Second stage drilling completed, awaiting assays and resource update K
Slide 9: Drilling results: 2021 and 2022
Drilling results: 2021 and 2022 • Upper graphite layer typically 3-8m thick • Lower graphite layer typically 5-15m thick, in places thicknesses to about 20m, particularly towards the north (collars C2 and J) • Deposit open in three directions and partly covered outcrops of graphite to the NE of dril
Slide 10: Amitsoq graphite product
Amitsoq graphite product Metallurgical test work (ProGraphite GmbH) demonstrates that Amitsoq graphite can deliver High-grade, >95% carbon (C) Battery-grade high purity concentrate graphite (99.97% C) (“HPSG”) for LIBs Conceptual annual production: • 300-400kt ore @ 20% graphite for 60-80kt graphite
Slide 11: Roadmap to production
Roadmap to production Conceptual plan 2023-2026, development, construction to production 2023 2024 2025 2026 Resource Exploitation DFS, Start Construction final definition, High-grade, >95% carbon (C) permitting, PFS, construction of Scoping study, Pilot processing mine, processing Production start
Slide 12: Market demand - European battery ambitions
Market demand - European battery ambitions • In Europe there are presently 21 GigaFactories in production or under construction, producing a total of 354GWh in 2025 and 541GWh in 2030* • Additionally, 17 GigaFactories are planned for opening in 2025 and 2 more for 2030, producing 198GWh in 2025 and
Slide 13: European Sourced graphite for European gigafactories
European Sourced graphite for European gigafactories Graphite requirement to feed European GigaFactories: Skaland 2025: 707kt/y - 1,103kt/y Amitsoq 2030: 1,081kt/y - 2,161kt/y Vittangi Shipping from Greenland to Hamburg: 1,600NM/ 5 days Liverpool: 1,400NM/ 4 days Woxna Aitolampi Present and projecte
Slide 14: Hydropower potential for zero-CO2 graphite production
Hydropower potential for zero-CO2 graphite production 17GWh hydropower plant assessment and planned for Tassiusaarsuk, located 15km NE of Amitsoq Nanortalik town. Only c.16km of powerline cables needed to supply Amitsoq graphite Tassiusaarsuk mine with green energy Nanortalik 14 | Investor Presentat
Slide 15: Thule Black Sands: High-Grade Ilmenite
Thule Black Sands High-Grade Ilmenite 15 | Investor Presentation
Slide 16: High Grade Ilmenite
High Grade Ilmenite THULE BLACK SANDS Extensively drilled and set to move into the development phase High-grade ilmenite Extensively drilled, with JORC Resource: 19MT@ Resource upgrade and mineral sands located on 10km of mineralised strike 43.6% THM, in-situ ilmenite EIA/SIA ongoing shoreline of St
Slide 17: Ilmenite & Titanium Explainer
Ilmenite & Titanium Explainer Ilmenite: black iron-titanium oxide (FeTiO3) largely Ilmenite is the recovered by dredging primary ore of Ilmenite mineral sands titanium Used to make high- Titanium: metal with the performance alloys highest strength to weight (aerospace & military), Titanium ratio of
Slide 18: 2021 Drilling positions for Resource update and 2022 EIA field studies
2021 Drilling positions for Resource update and 2022 EIA field studies partly completed THULE BLACK SANDS Phase 2 Drilling completed 2021 249 holes completed to a maximum of 6m depth for a total of 550m Drilling focused on high-grade southern zone Maiden Resource limited to top 1m (depth of permafro
Slide 19: Wider GreenRoc Portfolio
Wider GreenRoc Portfolio Melville Bay Iron Ore Project N-W Greenland JORC Inferred Resource of 63 Million Tonnes @ 31.4% Fe Significant potential to increase Resource at Melville Bay through drilling - Exploration Target of 200-400 Mt at 25-37% Fe High-grade magnetite concentrate can be produced, gr
Slide 20: GreenRoc Retained Advisers & Consultants
GreenRoc Retained Advisers & Consultants Geology/Resources Environmental/Social Impact Mining/Engineering/Metallurgy Professional Services In Country Services/Logistics 20 | Investor Presentation
Slide 21: Contact Details
Contact Details GreenRoc Mining Plc St Brides Partners Ltd (PR Advisers) 6th Floor, 60 Gracechurch St Warnford Court London EC3V 0HR 29 Throgmorton Street United Kingdom London, EC2N 2AT Tel: +44 (0)20 3950 0724 Tel: +44 (0) 20 7236 1177 Email: info@greenrocmining.com Email: info@stbridespartners.co