Granada Gold Mine Inc. · TSXV:GGM

Granada Gold Mine — Investor Presentation (October 2026)

15 slides from Granada Gold Mine's investor presentation, Oct 15, 2026

  1. Slide 1: Corporate Presentation | October 2026

    79° W Past-Producing Gold Project on Québec's 79 Cadillac Break 890,600 oz Au Measured & Indicated Au GRANADA 15.982 Mt at 1.73 g/t Au 865,500 oz Au Inferred 20.096 Mt at 1.34 g/t Au Au79°W Corporate Presentation | October 2026 TSX-V: GGM | OTC PK: GBBFF | Frankfurt: B6DA granadagoldmine.com Source:

  2. Slide 2: Disclaimer – Cautionary Statements

    DISCLAIMER DISCLAIMER – CAUTIONARY STATEMENTS No stock exchange, securities commission or other regulatory authority has approved or disapproved the information contained herein. Cautionary Note Concerning Forward-Looking Statements. This presentation includes certain “forward-looking statements”. A

  3. Slide 3: Investment highlights: Snapshot

    79 | 79°W Investment highlights Snapshot 890,600 oz 2.7× ~990 m ~20% MEASURED & INDICATED · 15.98 Mt at 1.73 g/t grade uplift from deepest modelled of the 16.34 km² XRT ore sorting, resources; open at property has been +64% vs 2022 at 88% gold depth and along explored recovery strike 865,500 oz C$0.

  4. Slide 4: Abitibi Greenstone Belt: On One of the World's Great Gold Belts

    79 | 79°W Abitibi Greenstone Belt On One of the World’s Great Gold Belts ONTARIO QUÉBEC 0 25 50 km N Rouyn-Noranda Kirkland Lake Cadillac Malartic Val-d'Or Larder Lake GRANADA Town Granada Matachewan Producing Project / past producer Volcanic Mafic–ultramafic Granitoid Sedimentary Gneiss Break, mapp

  5. Slide 5: Site infrastructure and permitting

    79 | 79°W Site & infrastructure Site infrastructure and permitting INFRASTRUCTURE IN PLACE PERMITS 5 km 25 kV 2016 south of Rouyn-Noranda; line to site, up to 12,000 kW; Certificate of Authorization: Highway and range-road Hydro-Québec power >99% four open pits, two waste-rock access renewable stock

  6. Slide 6: The Granada property: A Past Producer With Exploration Upside

    79 | 79°W The Granada property A Past Producer With Exploration Upside 16.34 km² 100% owned and in good standing: 2 mining leases and 52 claims gold mined 1930–35: 164,816 t 51,476 oz at 9.7 g/t, from two shafts of mining: 1930s underground, 3 eras 1990s open pits, 2007 bulk sample approximately 5.5

  7. Slide 7: 890,600 oz Measured & Indicated in the 2026 Resource

    79 | 79°W Resource 890,600 oz Measured & Indicated in the 2026 Resource CLASSIFICATION TONNES GRADE (G/T AU) CONTAINED OZ AU RESOURCE GROWTH, CONTAINED GOLD (KOZ) Measured 6,634,000 1.75 372,900 +64% +90% 890.6 865.5 Indicated 9,348,000 1.72 517,700 543 Measured + Indicated 15,982,000 1.73 890,600 4

  8. Slide 8: The Resource Remains Open Along Strike and at Depth

    79 | 79°W Resource The Resource Remains Open Along Strike and at Depth DRILLED METRES ALONG THE 5.5 KM STRUCTURE, PER 250 M DRILLED METRES BY DEPTH BAND UNDERGROUND UPSIDE 0–100 m 87% 100–200 m 200–300 m 431,000 oz of drilled metres sit within one kilometre of the Granada shafts 300–400 m 70% of the

  9. Slide 9: About 80% of the Property Is Still to Be Explored

    79 | 79°W The Granada property About 80% of the Property Is Still to Be Explored Overhead view Done and 151,255 m of drilling behind the 969 holes 2026 resource estimate of the 5.5 km structure holds the 2026 ~2 km resource of the 16.34 km² property has been About 20% explored; about 80% is still to

  10. Slide 10: Structural Interpretation Supports More Targets

    79 | 79°W Exploration Structural Interpretation Supports More Targets NEXT STEPS THE VEIN SET (SCHEMATIC PLAN) KEY FINDINGS Updated geological map 1 Veins 1 and 2 were mined historically at an Integrating historical mapping, LiDAR and Vein 1 mined average 9.7 g/t Au; three further veins magnetic lin

  11. Slide 11: Priority area for further exploration

    79 | 79°W The Granada property Priority area for further exploration East the 1.9 km between the Aukeko and Austin- Rouyn shafts has no drill holes; about 4% of drilled metres lie east of the main zone Depth at depth, where hole GR-20-21 cut 107.8 g/t gold over 4 m from 617 m; only 48 holes pass 500

  12. Slide 12: Ore-sorting testwork achieved 2.7x grade uplift

    79 | 79°W Processing Ore-sorting testwork achieved 2.7x grade uplift FROM PIT TO CONCENTRATE, PROPOSED (ILLUSTRATIVE, SCALED FROM THE 500 KG TEST) closed-loop water 2.7× 88% gold-grade uplift gold recovered in in testing the sorting test ~10 t at 7.87 g/t Size Gravity Concentrate ~2/3 94.9% of test

  13. Slide 13: 2026 progress and next steps

    79 | 79°W Development 2026 progress and next steps DELIVERED Held (2016) Feb 2026 Apr 2026 Jun 2026 Aug 2026 Sep 2026 Certificate of Authorization C$2.95M raised Ore-sorting results 2026 MRE NI 43-101 filed New President four open pits (2016) oversubscribed placement 2.7× at 88% recovery 890.6 koz M

  14. Slide 14: Board & Management

    79 | 79°W LEADERSHIP BOARD & MANAGEMENT Frank J. Basa, P.Eng. Matthew Halliday, P.Geo. O F F I C ER S CHIEF EXECUTIVE OFFICER & DIRECTOR DIRECTOR & QUALIFIED PERSON Director since 2004. Hydrometallurgical engineer Resource and exploration geologist; formerly with Frank J. Basa with 28+ years in gold

  15. Slide 15: Contact

    Contact Frank J. Basa, P.Eng. Chief Executive Officer +1 416-625-2342 · fbasa@granadagoldmine.com J.W. Dumont President +1 514-261-3261 · jw@granadagoldmine.com Wayne Cheveldayoff Corporate Communications +1 416-710-2410 · waynecheveldayoff@gmail.com Granada Gold Mine Inc. · Rouyn-Noranda, Québec ·