  1. Slide 1: Natural Gas Pipelines

    Natural Gas Pipelines Tom Martin President Natural Gas Pipeline Group

  2. Slide 2: Natural Gas Segment

    Natural Gas Segment (a) Growth Drivers:  Shale-driven expansions / extensions  LNG exports — Liquefaction facilities — Pipeline infrastructure  Gas demand for power generation — Coal plant retirements — Regional demand growth  Exports to Mexico  Repurposing opportunities _______________________

  3. Slide 3: Financial Overview

    Financial Overview KM Gas Pipeline Group 2014 EBDDA (KM-share) $ Million 2014 2014 By Region Budget By Entity Budget West 1,025.9 KMI 271.3 Central 194.2 KMP 2,752.3 East 1,803.3 EPB 1,285.3 Midstream 1,285.5 Total 4,308.9 Total 4,308.9 2014 Highlights  Copano full-year impact  TGP expansions/In-s

  4. Slide 4: Contracted Capacity and Term by Region

    Contracted Capacity and Term by Region Contracted Average Term Region Capacity Remaining East Storage 133 Bcf 3 yr, 6 mo Transport 17.9 Bcf/d 8 yr, 10 mo LNG 18 Bcf 18 yr, 5 mo Interstate West Storage 39 Bcf 6 yr, 0 mo Transport Contracts Transport 16.7 Bcf/d 5 yr, 6 mo Avg. = 7 yr, 1 mo Central Sto

  5. Slide 5: Projects Placed Into Service - 2013

    Projects Placed Into Service - 2013 5

  6. Slide 6: Copano Acquisition

    Copano Acquisition Expanded midstream footprint Copano Asset Overview  Broader reach into the Eagle Ford Shale - 6,800 miles of natural gas pipelines  Larger starting point in emerging Eaglebine/Woodbine play - 3.6 Bcf/d of gas throughput capacity  New entry into other rich gas plays - 460 miles

  7. Slide 7: Gas Pipeline Group Major Projects

    Gas Pipeline Group Major Projects 7

  8. Slide 8: Region Asset Reviews

    KINDER/MORGAN Region Asset Reviews

  9. Slide 9: East Region Assets

    East Region Assets (a) Growth Drivers:  Asset footprint provides a base for serving growing and supply-constrained markets from both traditional and developing supply regions  TGP uniquely positioned in growing Marcellus and Utica shale plays to provide region-wide access to both Gulf Coast and No

  10. Slide 10: East Region Project Backlog

    East Region Project Backlog 10

  11. Slide 11: TGP - Utica Backhaul Transportation

    TGP - Utica Backhaul Transportation  Capacity: 400 MDth/d Long-term 100 MDth/d Short-term  Capital: $155.6 MM  Estimated In-service: April 2014  Project Scope: Pipe modifications at 8 compressor stations  Commercial Benefit: Southbound capacity from Utica Shale to Gulf Coast markets  Rate: Dis

  12. Slide 12: TGP - Rose Lake Project

    TGP - Rose Lake Project  Capacity: 230 MDth/d  Commercial Benefit: Expand TGP’s capacity to  Capital: $83.0 MM transport Marcellus Shale production to Canada  Estimated In-service: November 2014 and New England  Project Scope:  Rate: Negotiated — Station 315 - 12,600 HP new compression  Avg.

  13. Slide 13: TGP - Niagara Expansion

    TGP - Niagara Expansion  Capacity: 158 MDth/d  Capital: $26.0 MM  Estimated In-service: November 2015  Project Scope: — 3.1 miles of 30-inch pipe looping — Station 229 meter facilities — Lease on National Fuel Gas (140 MDth/d)  Commercial Benefit: Provides additional market for Marcellus gas an

  14. Slide 14: TGP - Connecticut Expansion Project

    TGP - Connecticut Expansion Project  Capacity: 72.1 MDth/d  Capital: $76.9 MM  Estimated In-service: November 2016  Project Scope: — 13.3 miles of pipeline loop — Acquisition of Thompsonville Lateral  Commercial Benefit: Additional capacity to serve New England market  Rate: Negotiated  Avg.

  15. Slide 15: TGP - Cameron LNG

    TGP - Cameron LNG  Capacity: 900 MDth/d  Capital: $138.4 MM  Estimated In-service: Q4 2017  Project Scope: — Compressor station modifications to accommodate bi-directional flow — 18,000 HP of new compression — New pipeline laterals for enhanced supply access to the Perryville Hub  Commercial Be

  16. Slide 16: SNG / Elba Express Expansion

    SNG / Elba Express Expansion  Capacity: 333 MDth/d  Capital: $168.0 MM (a)  Estimated In-service: June 2016  Project Scope: — Compression on SNG and EEC — Additional pipeline and other facilities  Commercial Benefit: Additional access to Marcellus/Utica shale gas for existing and new SNG custom

  17. Slide 17: Liquefaction at Elba Island

    Liquefaction at Elba Island Elba Liquefaction Company (ELC) / SLNG  Capacity: 350 MMcf/d (Phase I & II(a))  Capital (KM-share, $MM): Phase I Phase II(a) ELC (KM 51%) $533.0 $224.4 SLNG (KM 100%) 271.0 - EEC (KM 100%) 79.9 31.3 Total $883.9 $255.7 (a) Based on 4 units  Estimated In-service: — 4Q 2

  18. Slide 18: East Region Additional Potential Growth Projects

    East Region Additional Potential Growth Projects  Additional Marcellus / Utica Project Opportunities — Enormous production increases in these two areas will provide expansion and greenfield opportunities to move more gas into the Northeast and significant quantities south to the demand centers on t

  19. Slide 19: East Region Growth Opportunity

    East Region Growth Opportunity TGP Northeast Expansion  Capacity: 1.0+ Bcf/d PNGTS & M&NP Joint Facilities  Capital: Approx. $1.75 - $2.75 B  Estimated In-service: November 2018 TGP Northeast Expansion Wright M&NP  Project Scope: Dracut — Approx. 175 miles of greenfield pipe for connection to TG

  20. Slide 20: West Region Assets

    West Region Assets (a) Growth Drivers:  Large asset footprint provides numerous opportunities for expansion capital investment  West Region pipelines reach back to all Rockies Basins. — Growing liquids and oil production is creating expansion opportunities for associated gas and conversions  Comp

  21. Slide 21: West Region Project Backlog

    West Region Project Backlog 21

  22. Slide 22: EPNG - Sierrita Pipeline

    EPNG - Sierrita Pipeline  Capacity: 204 MDth/d Arizona  Capital (KM-share): $71.5 MM  Estimated In-service: Phase I: October 2014 Tucson  Project Scope: Tohono O’odham — Sierrita Pipeline Co. – JV, Kinder Morgan Sierrita Indian Res. 35% ownership interest and operator Buenos Aires Nat’l Wildlife

  23. Slide 23: CIG - High Plains Expansion

    CIG - High Plains Expansion  Capacity: 600 MDth/d  Capital (KM-share): $11.2 MM  Estimated In-service: — November 2013 (DCP) — July 2014 (Anadarko)  Project Scope: — 8 miles of 24-inch pipe, regulation, and metering at Cheyenne into WIC — Lancaster Meter Station (Anadarko) and LaSalle Meter Stat

  24. Slide 24: CIG - DJ Basin Project

    CIG - DJ Basin Project  Capacity: 100 MDth/d  Capital: $14.7 MM  Estimated In-service: Q1 2015  Project Scope: — Connect 7.6 miles of pipe to CIG for $12.0 MM — Build 3.3 miles of 16-inch pipe to CIG High Plains — Metering  Commercial Benefit: Project to connect processing plant within the DJ B

  25. Slide 25: West Region Additional Potential Growth Projects

    West Region Additional Potential Growth Projects  Growth in exports to Mexico — Total incremental Mexico growth by 2025 projected up to 2.1 Bcf/d that can be served from the EPNG footprint • Incremental power generation demand growth on Willcox, Samalayuca laterals and Sierrita • Creates opportunit

  26. Slide 26: West Region Growth Opportunity

    West Region Growth Opportunity Mexico Incremental Gas Demand Potential Est. Avg. Daily Gas No. of Capacity Demand Key Demand Type Projects (MW) (MMcf/d) Electric Gen Conversions 7 4,241 534 Electric Gen New Builds 12 8,493 1,070 Industrial Potential 513 Total Incremental Mexico Demand Potential 2,11

  27. Slide 27: West Region Growth Opportunity

    West Region Growth Opportunity CIG Powder River Lateral Conversion to NGL Service  Capacity: 60-100 MBbls/d  Capital: $75-100MM  Estimated In-service: 2015  Project Scope: — Conversion of 16-inch lateral to liquids service — Connect with Overland Pass Pipeline at Laramie — Requires pump and mete

  28. Slide 28: Central Region Assets

    Central Region Assets Growth Drivers:  Large and strategic asset footprint near major shale plays and supply basins provides opportunities to attach new supply  Potential to serve 10 Bcf/d of transportation demand from 5 announced LNG liquefaction projects along the Gulf Coast near NGPL and KMLP —

  29. Slide 29: Central Region Project Backlog

    Central Region Project Backlog 29

  30. Slide 30: Central Region Opportunity

    Central Region Opportunity KMLP - LNG Liquefaction Transport Project  Capacity: 700 MDth/d  Capital: $129.1 MM  Estimated In-service: 4Q 2018  Project Scope: — Kinder Morgan Louisiana Pipeline converted to a bi- directional pipe — Located in Calcasieu and Acadia Parishes, Louisiana  Commercial

  31. Slide 31: Central Region Additional Potential Growth Projects

    Central Region Additional Potential Growth Projects  LNG Liquefaction Opportunities — LNG liquefaction projects moving forward in South Texas/Louisiana provide potential expansion investment opportunities on both NGPL and KMLP  Future Power Plant Load — Continue to work with power plants identifie

  32. Slide 32: Central Region Growth Opportunity

    Central Region Growth Opportunity KMLP - LNG Liquefaction Transport  Capacity: 0.7-1.9 MMDth/d  Capital: $70-350MM  Estimated In-service: Late 2018  Project Scope: — Kinder Morgan Louisiana Pipeline converted to a bi- directional pipe — Located in Calcasieu and Acadia Parishes, Louisiana  Comme

  33. Slide 33: Midstream Assets

    Midstream Assets Growth Drivers:  Large asset footprint provides continued expansion capital investment  Copano acquisition provides expanded footprint and midstream services while leveraging G&P experience and expertise across portfolio of KM assets, including the development of new NGL initiativ

  34. Slide 34: Midstream Project Backlog

    Midstream Project Backlog 34

  35. Slide 35: Mier Monterrey Expansion

    Mier Monterrey Expansion  Capacity: 215 MMcf/d  Capital: $126.3MM  Estimated In-service: — September 2014 (compression) — January 2015 (conditioning plant)  Project Scope: — Compressor station (U.S.) — Conditioning plant (U.S.) — Webb 14-inch pipe replacement (U.S.) — Leased compression (Mexico)

  36. Slide 36: Calpine Magic Valley

    Calpine Magic Valley  Capacity: 90 MDth/d  Capital: $26.4MM  Estimated In-service: March 2014 (compression)  Project Scope: 23 miles of 16-inch pipe, compression and meter  Commercial Benefit: Provides additional capacity to serve power plants in deep south Texas  Current Status: — Executed 90

  37. Slide 37: DK Expansion (incl. TXP3)

    DK Expansion (incl. TXP3)  Capacity: 400 MMcf/d  Capital: $250.1MM  Estimated In-service: — June 2014 (pipeline) — July 2014 (plant)  Project Scope: — 400 MMcf/d cryogenic plant — 8 miles of 24-inch pipe — 6,720 HP compression  Commercial Benefits: — Expands gathering and processing capacity in

  38. Slide 38: Eagle Ford Fractionation Outlet

    Eagle Ford Fractionation Outlet  Capacity: 30 MBbls/d  Capital: $20.0MM  Expected In-service: 3Q 2015  Project Scope: 26 miles of 12-inch pipeline from Markham to a NGL fractionator near Sweeny, TX  Commercial Benefits: — Provides economic outlet for NGLs produced from expanded Houston Central

  39. Slide 39: Eaglebine Project

    Eaglebine Project  Capacity: 45 MMcf/d  Capital: $24.3MM  Estimated In-service: 3Q 2014  Project Scope: — Convert 50 miles of existing pipeline for rich gas service — 100 GPM amine treater and dehydration unit — 3 gas chill units (15 MMcf/d each) — 6.5 miles of natural gas pipelines — 4-mile Y-g

  40. Slide 40: Midstream Additional Potential Growth Projects

    Midstream Additional Potential Growth Projects  Exports — Electric generators in Mexico are looking towards natural gas to fuel new plants to meet growth and replace other fuels such as oil — Proposed LNG liquefaction projects in South Texas  Processing and Gathering — Continued growth in shale pl

  41. Slide 41: Midstream Growth Opportunities

    Midstream Growth Opportunities Gulf Coast LNG Opportunities LNG export terminals announced to come on-line in 2017-19 along the Texas Gulf Coast:  Golden Pass LNG (Sabine Pass, TX) — 2.1 Bcf/d  Freeport LNG (Freeport, TX) — 2.1 Bcf/d  Excelerate (Lavaca Bay, TX) — Small scale floating LNG process

  42. Slide 42: Gas Pipeline Group Growth Outlook

    Gas Pipeline Group Growth Outlook 42