Black Cat Syndicate Ltd. · ASX:BC8

Black Cat Syndicate — Australian Gold Conference 2022

30 slides from Black Cat Syndicate's conference presentation, Jun 14, 2022

  1. Slide 1: Australian Gold Conference

    Investor Presentation AUSTRALIAN GOLD CONFERENCE June 2022

  2. Slide 2: Disclaimer, distribution and disclosure

    Disclaimer, distribution and disclosure Disclaimer and not for US distribution This presentation includes forward-looking statements including, but not limited to, comments regarding the timing and content of upcoming work programs, geological interpretations, receipt of property titles, potential m

  3. Slide 3: The elevation of a new gold growth stock

    Advanced assets Three project areas with a combined 2.0Moz Resource at 2.5g/t All located within WA on granted mining tenure with exploration upside Development pipeline Two established operating centres with existing processing infrastructure A staged path to produce gold from all three projects wi

  4. Slide 4: Business overview

    Business overview Five year vision: Resource growth to 3Moz with multiple producing assets 2.0Moz @ 2.5g/t Au 1,770km2 total Mineral Resources total landholding >$140M $105.9M 1 estimated infrastructure forecast operating cashflow (post 2 replacement cost capital & before tax) from Kal East base cas

  5. Slide 5: Coyote

    1 COYOTE Pathway to production 5

  6. Slide 6: A high-grade starter project

    1 COYOTE GOLD OPERATION A high-grade starter project Project highlights Development strategy • Potential 5-year mine plan based on the initial processing of stockpiles followed by Landholding Gold Resources known open pit and underground Resources ~440km² 488koz @ 5.1g/t • Restart studies and approv

  7. Slide 7: Drilling starting in July 2022

    1 COYOTE GOLD OPERATION Drilling starting in July 2022 Exploration upside – near mine Rigs will mobilise from early July and operate continuously through the 2022 field season: 1. Infill drilling at Speedy (54koz @ 7.4 g/t Au) to 1 support a development study in 2022 2. Infill and extensional drilli

  8. Slide 8: Full geophysical review underway

    1 COYOTE GOLD OPERATION Full geophysical review underway Exploration upside – regional Mineralisation controlled by intersection of NW/NE faults and folded Coyote stratigraphy; priority targets include: 1. Coyote West: 2km Au/As anomaly 7 immediately west of Coyote mine; possible plunge extension 1

  9. Slide 9: Paulsens Gold Operation

    2 PAULSENS GOLD OPERATION Pathway to production 9

  10. Slide 10: A high quality, well maintained operation

    2 PAULSENS GOLD OPERATION A high quality, well maintained operation Project highlights Development strategy Landholding Gold Resources • Significant remnant mining opportunities based on the previously defined Ore Reserve located close to existing development ~530km² 217koz @ 2.5g/t • High priority

  11. Slide 11: Drilling starting in September 2022

    2 PAULSENS GOLD OPERATION Drilling starting in September 2022 Exploration upside – near mine Drilling planned to commence in September 2022 following completion of structural & geophysics reviews 1. Upper and Lower Gabbro Veins: extensions of high-grade mineralisation close to existing infrastructur

  12. Slide 12: Significant regional potential with limited previous work

    2 PAULSENS GOLD OPERATION Significant regional potential with limited previous work Exploration upside – regional Advanced and untested exploration targets hosted on splay structures from Nanjilgard Fault: 1. Paulsens Underground Extension: Extensions 8 around current system 2. Paulsens East/Eagle R

  13. Slide 13: Kal East

    3 KAL EAST Pathway to production 13

  14. Slide 14: Initial production plan - development ready

    3 KAL EAST GOLD PROJECT Initial production plan - development ready Project highlights Development strategy – project is in the Go Bay Landholding Gold Resources • Key permits in place and long-lead time items acquired 800km² 1,294koz @ 2.1g/t • Initial Ore Reserve underpins a five+ year mine life •

  15. Slide 15: Pre-Feasibility Study and Ore Reserve

    3 KAL EAST GOLD PROJECT Pre-Feasibility Study and Ore Reserve A robust PFS completed to a high standard – with upside Key Metrics Units Study Outcomes • PFS completed with minimal final technical design and tenders required Ore Reserve Gold Price A$oz 2,300 to reach a final investment decision Study

  16. Slide 16: Forecast AISC

    3 KAL EAST GOLD PROJECT Forecast AISC AISC ($/oz) 3,500 3,000 Highly competitive forecast AISC in comparison to current Australian gold production 2,500 2,000 1,500 1,000 500 0 Murchison Leonora Mt Morgans Halls Creek Telfer Kal East Gruyere Tomingly Mount Monger Karlawinda Tropicana Mt Rawdon Cowal

  17. Slide 17: Investment Summary

    INVESTMENT SUMMARY Pathway to production 17

  18. Slide 18: Simple structure, experienced team

    Simple structure, experienced team Pro-forma Corporate Information Board of Directors Shares on Issue (post acquisition) 213.6M Gareth Solly Previous roles include senior management roles with Managing Director Norilsk Nickel, Silver Lake Resources and Saracen Gold Options @ ~$0.33 (av.) 14.4M BSc (

  19. Slide 19: Track record of rapid Resource growth

    Track record of rapid Resource growth oz 2,500,000 Resource growth to >2Moz in 4 years: • 1.3Moz Resource acquired • 0.8Moz Resource discovered 2,000,000 • For every 1oz acquired, 1.5oz discovered 1,500,000 981,000 1,000,000 Inferred 523,000 Active and growing: Measured/Indicated • >200,000m drilled

  20. Slide 20: Attractive valuation compared to peers

    Attractive valuation compared to peers $EV/oz $350 $300 $250 $200 $150 Low Enterprise Value per Resource ounce compared to Australian gold mining and developer peers $100 $50 $0 Black Cat Westgold St Barbara Dacian Gold De Grey Regis Ramelius Genesis Gold Road Calidus Bellevue Gold Beacon Capricorn

  21. Slide 21: Building a strong foundation

    Building a strong foundation • Commencement of • Commencement of • Paulsens restart studies drilling at Coyote drilling at Paulsens • Drilling results from • Results from Myhree • Ongoing results from Paulsens grade control drilling Coyote drilling • Discovery and • EIS funded drilling at • Addition

  22. Slide 22: Investment summary

    Investment • Five year vision to become a new multi-operation gold mining business following the summary acquisition of Coyote and Paulsens • Drilling high-grade, high value targets at newly acquired assets in the coming weeks with the potential to deliver significant value uplift • Valuable establi

  23. Slide 23: Thank you.

    Thank you. Level 3, 52 Kings Park Road, West Perth WA 6005 PO Box 184, West Perth WA 6872 +61 (0)458 007 713 admin@bc8.com.au ABN 63620 896 282 www.blackcatsyndicate.com.au

  24. Slide 24: Appendices

    APPENDICES Pathway to production 24

  25. Slide 25: Comparative chart data and sourcing

    Comparative chart data and sourcing Market Capitalisation (9-Jun- Company Status Enterprise Value Resource (total oz) EV/Resource Resource disclosure 22) Black Cat Syndicate Developer (PFS) $81,091,199 $43,762,199 2,000,000 $21.88 25-May-22 Westgold Resources Producer $568,195,399 $388,195,399 7,900

  26. Slide 26: Comparative chart data and sourcing

    Comparative chart data and sourcing Company Units Black Cat Westgold St Barbara Dacian Gold De Grey Mining Regis Resources Syndicate Resources Measured Moz 0.07 1,08 2.04 0.30 0.26 1.21 Grade g/t Au 5.6 3.4 1.7 1.0 1.7 0.9 Indicated Moz 0.88 4.22 11.60 0.97 6.59 6.77 Grade g/t Au 2.5 2.0 2.0 1.9 1.3

  27. Slide 27: Mineral Resources

    Mineral Resources Measured Resource Indicated Resource Inferred Resource Total Resource Operation/ Project Grade Metal Tonnes Grade Metal Tonnes Grade Metal Tonnes Grade Metal Tonnes (‘000s) (g/t Au) (‘000oz) (‘000s) (g/t Au) (‘000oz) (‘000s) (g/t Au) (‘000oz) (‘000s) (g/t Au) (‘000oz) Open Pit - -

  28. Slide 28: Ore Reserves

    Ore Reserves Probable Total Deposit Tonnes (‘000s) Grade (g/t Au) Ounces Tonnes (‘000s) Grade (g/t Au) Ounces Myhree 584,500 2.4 45,600 584,500 2.4 45,600 Boundary 119,500 1.5 5,700 119,500 1.5 5,700 Open Pit Ore Reserves Jones Find 349,500 1.5 16,500 349,500 1.5 16,500 Fingals Fortune 2,038,700 1.7

  29. Slide 29: JORC 2012 Resource table – 100% owned

    JORC 2012 Resource table – 100% owned Notes on Resources: Measured Resource Indicated Resource Inferred Resource Total Resource 1. The preceding statements of Mineral Resources conforms to the ‘Australasian Code for Reporting of Exploration Results Mining Centre Mineral Resources and Ore Reserves (J

  30. Slide 30: JORC 2012 Resource table – Coyote and Paulsens

    JORC 2012 Resource table – Coyote and Paulsens Measured Resource Indicated Resource Inferred Resource Total Resource Notes on Resources: Metal Metal Metal Metal 1. The preceding statements of Mineral Resources conforms to the ‘Australasian Code for Deposit Tonnes Grade Tonnes Grade Tonnes Grade Tonn

Black Cat Syndicate — Australian Gold Conference 2022 on 6ix