Slide 1: Sanbrado Gold Project Feasibility Study
For personal use only Sanbrado Gold Project Feasibility Study We s t A f r i c a ’s n e x t t i e r 1 g o l d a s s e t 22 June 2018 Richard Hyde – Managing Director & CEO
Slide 2: Important Notice
IMPORTANT NOTICE For personal use only IMPORTANT NOTICE AND DISCLAIMER except as required by law. For the reasons set forth above, investors should not place undue reliance on forward- This presentation contains “forward-looking information” within the meaning of securities legislation, including lo
Slide 3: Feasibility Study Highlights
SANBRADO GOLD PROJECT J U N E 2 0 1 8 - F E A S I B I LT Y S T U D Y H I G H L I G H T S For personal use only HIGH-GRADE Sanbrado Gold Project: 1.6Moz Probable Mineral Reserve +200,000 oz pa 211,000 oz average gold production per annum for the first 5 years PRODUCTION +4g/t average head grade
Slide 4: Sanbrado Gold Project location and infrastructure
SANBRADO GOLD PROJECT For personal use only Located in central Burkina Faso 110km, 1.5 hrs southeast of Ouagadougou Excellent infrastructure ‒ 20km from sealed highway ‒ Excellent mobile phone coverage ‒ LV grid power on site ‒ 15km from HV grid power ‒ 18km from stable water source Low popu
Slide 5: Key Project Metrics
SANBRADO GOLD PROJECT F E A S I B I LT Y S T U D Y H I G H L I G H T S For personal use only KEY PROJECT METRICS Project High-grade underground and open-pit operation with 2Mtpa SABC CIL plant Resource MRE of 2.35Moz Au (Indicated) & 0.55Moz Au (Inferred) Production Average 211koz per year for
Slide 6: M1 South Deposit
SANBRADO GOLD PROJECT M1 SOUTH DEPOSIT For personal use only June 2018 MRE OP 0-120m - 170koz at 6.6 g/t gold (Ind), 10koz at 4.8 g/t gold (Inf) UG 120-530m - 620koz at 25.5 g/t gold (Ind), 70koz at 7.6 g/t gold (Inf) June 2018 Probable Reserves OP 0-120m - 156koz at 6.9 g/t gold UG 120-500m
Slide 7: M5 Deposit
SANBRADO GOLD PROJECT M5 DEPOSIT For personal use only June 2018 MRE 37.2Mt at 1.3 g/t Au for 1.5Moz (Ind) 12.8Mt at 1.1 g/t Au for 0.45Moz (Inf) June 2018 Probable Reserves 0.8Moz at 1.5 g/t gold (16.4Mt) Main pit 2km long, up to 400m wide and 290m deep in southwest Ore from surface Ove
Slide 8: Ore Mined by Source and Annual Production
SANBRADO GOLD PROJECT ORE MINED BY SOURCE AND ANNUAL PRODUCTION For personal use only 300,000 M1 South OP 2 years 250,000 M5 OP 11 years M1 South UG 4.5 years TAN18-DD189: 11m at 10.5g/t Au and 6m at 24.4g/t Au 200,000 70m below current reserves M1 South UG reserve Further drilling to exte
Slide 9: Processing & Metallurgy
SANBRADO GOLD PROJECT P R O C E S S I N G & M E TA L L U R G Y For personal use only Standard 2Mtpa CIL plant design Primary crushing & SABC grinding, gravity recovery 75-90 micron grind CWi 4-11kWh/t (Oxide-Fresh) BWi 8-22kWh/t (Oxide-Fresh) 15-40% gravity gold LOM Processing costs: $
Slide 10: Capital Expenditure Summary
SANBRADO GOLD PROJECT C A P I TA L E X P E N D I T U R E S U M M A RY For personal use only DEVELOPMENT CAPEX BREAKDOWN1 US$185m development CAPEX inclusive 32.2 of open-pit and underground pre- production mining & development costs, contingencies, duties & taxes 65.4 Capital cost estimate prepa
Slide 11: Near Term Milestones
NEAR TERM MILESTONES For personal use only CURRENT DEVELOPMENT PLAN FOR 2018 AND BEYOND 2018 2019 2020 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Resource upgrades M5 Scoping Further resource / reserve and definition drilling Updated environmental and mining permits Updated feasibility study Form
Slide 12: Additional Information
For personal use only Additional Information 12
Slide 13: Regional Development Potential
SANBRADO PROJECT For personal use only PLACEHOLDER FOR REGIONAL DEVELOPMENT POTENTIAL MAP Region hosts 14Moz FROM SHANE undeveloped resources Potential for regional consolidation and infrastructure synergies Sanbrado has the highest grade of all deposits in the vicinty and is key to unlocking
Slide 14: Exploration Potential & Upside Areas
EXPLORATION POTENTIAL & UPSIDE AREAS For personal use only 1 NEAR MINE EXPLORATION 2 SURROUNDING EXPLORATION <5km from Sanbrado <30km from Sanbrado Continue to chase M1 South below 500m depth, deposit 10km geochem Moktedu Trend – 28m at 9.2g/t Au from surface Goudré rock chips +60 g/t Au has m
Slide 15: 2017 Open Pit FS v 2018 Updated FS
SANBRADO GOLD PROJECT 2017 OPEN PIT FS V 2018 UPDATED FS For personal use only Feb 2017 June 2018 Feasibility Updated Metric Study Feasibility Study Description Mining OP OP & UG Following continued drilling success at depth on M1 South, a new study determined that concurrent OP & UG mining of M1 So
Slide 16: Financial Model Overview
SANBRADO GOLD PROJECT F I N A N C I A L M O D E L O V E RV I E W For personal use only PRODUCTION AND FINANCIAL SUMMARY (BASE CASE) Base case is stated on a 100% basis Production LOM LOM average of 133kozpa, average of 211kozpa year 1 – 5 of full production Average Cash Costs of US$581/oz / A$775/oz
Slide 17: Corporate Overview
CORPORATE OVERVIEW For personal use only INVESTORS BY TYPE ASX & TSX-V: WAF 1832 Asset Mgt Total Ordinary Shares on Issue 690.8m (Dynamic Funds) VanEck Global Options on issue 16.0m 7% 6% Top 20 Shareholders 51% Retail Insiders & Cash (31 May 2018) A$44m Management 35% Market Capitalisation (at A$21
Slide 18: Project Timeline
PROJECT TIMELINE For personal use only Jan: WAF acquires Channel Jan: Drilling at M1 North Jan: WAF awarded Jan: High-grade • Detailed design and Resources and commences intersects 16m at 5.3g/t mining permit intersections commencement of $1600 work at Mankarga 5 Feb: M1 South high-grade Feb: Sanbra
Slide 19: Growth of Resource, Reserves and Grade 2014-2018
SANBRADO GOLD PROJECT G R O W T H O F R E S O U R C E , R E S E RV E S A N D G R A D E 2 0 1 4 - 2 0 1 8 For personal use only 2,500 2.50 2.40 2,000 2.00 grams per tonne 1.70 1.70 1,500 1.50 koz Au 1,000 1.20 1.20 1.00 0.90 500 0.50 437 278 736 440 980 440 1,332 894 2,022 894 2,350 1,557 0 0.00 Jul
Slide 20: Mineral Resources and Ore Reserves
MINERAL RESOURCES AND ORE RESERVES For personal use only SANBRADO GOLD PROJECT MINERAL RESOURCES | June 2018 INDICATED RESOURCES INFERRED RESOURCES Cutoff Deposit Grade Grade (Au g/t) Tonnes Au Oz Tonnes Au Oz (Au g/t) (Au g/t) O/P <120m 0.5 800,000 6.6 170,000 50,000 4.8 10,000 M1 South U/G >120m 3
Slide 21: West African Resources Ltd
West African Resources Ltd – ASX / TSXV: WAF For personal use only www.westafricanresources.com