Phoenix Solar — Technical Presentation (November 2010)

20 slides from Phoenix Solar's technical presentation, Nov 3, 2010

  1. Slide 1: The True Value of Photovoltaics for Germany – Summary of study findings

    Slide 1: The True Value of Photovoltaics for Germany – Summary of study findings

    The True Value of Photovoltaics for Germany – Summary of study findings – Hand-out for the press conference 3 November 2010, 10.00 a.m. Berlin, Haus der Bundespressekonferenz Schiffbauerdamm 40, room 1 Translated and edited version, 21 November 2010 Dr. Andreas Hänel – CEO of Phoenix Solar AG Jochen

  2. Slide 2: Contents

    Slide 2: Contents

    Contents  Brief summary of study findings  Appendix: Basic assumptions and abbreviations used 10/09.2010/40429d 2

  3. Slide 3: The key objective of the study is to evaluate the true value of photovoltaics

    Slide 3: The key objective of the study is to evaluate the true value of photovoltaics

    The key objective of the study is to evaluate the true value of photovoltaics (PV) for Germany Current situation Study objectives  The surprisingly strong growth  Provide a pragmatic, holistic analysis as input for the of photovoltaics poses debate in response to two main questions: challenges for

  4. Slide 4: The true value of PV for Germany is significantly higher than the current debate indicates

    Slide 4: The true value of PV for Germany is significantly higher than the current debate indicates

    The true value of PV for Germany is significantly higher than the current debate indicates Summary of key findings The EPEX wholesale market price is not a suitable benchmark for valuing photovoltaic electricity The full cost of new gas and coal-fired power plants, on the other hand, is an adequate

  5. Slide 5: The true value of PV for Germany is significantly higher than the current debate indicates

    Slide 5: The true value of PV for Germany is significantly higher than the current debate indicates

    The true value of PV for Germany is significantly higher than the current debate indicates Summary of key findings If the true value of photovoltaics is taken into account, photovoltaics will be a competitive alternative to electricity provided by gas and coal-fired power plants Competitiveness in 5

  6. Slide 6: Adequate valuation of PV results in 18-24% lower levies for PV

    Slide 6: Adequate valuation of PV results in 18-24% lower levies for PV

    Adequate valuation of PV and our installed capacity assumptions result in 18-24% lower levies for PV Value of PV: Calculating the EEG levy on photovoltaics for end consumers Calculation under Calculation using adequate current EEG rules – differential cost based on  Due to major forecast variation

  7. Slide 7: Additional PV installed capacity in Germany will reach macroeconomic breakeven in 2010

    Slide 7: Additional PV installed capacity in Germany will reach macroeconomic breakeven in 2010

    Additional PV installed capacity in Germany will reach macroeconomic breakeven in 2010 Value of PV: Investment case for installed PV capacity in a single year Benefit of EEG tariff investment in photovoltaics Comments in a specific year in EUR m (annuity) 388  The PV capacities installed in 2010 ge

  8. Slide 8: The return on all PV installations built between 2000 and 2011e is slightly positive

    Slide 8: The return on all PV installations built between 2000 and 2011e is slightly positive

    The return on all PV installations built between 2000 and 2011e is slightly positive for Germany Value of PV: Investment case for capacities installed in 2000-2011e IEA: "higher" fuel prices Non-quantified benefits 4%  Reduced import dependency 33%  Contribution to structural change 62% 81% Key as

  9. Slide 9: PV becomes competitive in 5 to 8 years

    Slide 9: PV becomes competitive in 5 to 8 years

    Taking into account environmental costs and system effects, PV becomes competitive in 5 to 8 years Competitiveness: Conventional vs PV generation prices in Germany (real prices, in 2010 EURc/kWh) Conventional generation prices plus PV generation prices2 for LV and MV plus complete CO2 avoidance cost

  10. Slide 10: PV is a key enabler of the structural transition to an efficient and distributed energy world

    Slide 10: PV is a key enabler of the structural transition to an efficient and distributed energy world

    PV is a key enabler of the structural transition to an efficient and distributed energy world Structural change: PV's contribution to structural change Area of change PV's contribution to structural change Reduces degree of concentration in the National oligopolistic power generation market power Re

  11. Slide 11: There is need for action by all stakeholders to ensure further development of PV

    Slide 11: There is need for action by all stakeholders to ensure further development of PV

    There is need for action by all stakeholders to ensure further development of PV in Germany Summary of needed actions Political / legal Energy market PV framework industry Value of PV • Adjust marketing mechanism • Ensure flexibility of • Further develop PV to reflect adequate valuation in conventio

  12. Slide 12: Contents

    Slide 12: Contents

    Contents  Brief summary of study findings  Appendix: Basic assumptions and abbreviations used 10/09.2010/40429d 12

  13. Slide 13: Description of PV-value components

    Slide 13: Description of PV-value components

    Description of PV- value components BACK-UP Component Subcomponent Explanation  Includes all tariff payments for capacities installed between 2000 1 EEG tariff payments and 2011 Revenues from power sales at EPEX 2  Revenues from power sales at EPEX, including peak load (current EEG marketing) duri

  14. Slide 14: Assumptions (1/6)

    Slide 14: Assumptions (1/6)

    Assumptions (1/6) Assumptions on the price of generating power from conventional energy sources Model components Description Sources  International Energy Agency (World  Coal: Reference case (2010: USD/t 65.9, 2050: 119.0), Energy Outlook 2009) Fuel costs higher price sensitivity case (2010: USD/t

  15. Slide 15: Assumptions (2/6)

    Slide 15: Assumptions (2/6)

    Assumptions (2/6) Power plant mix and cost assumptions Model components Description Sources  Current power plant mix: hydro (3.5%), lignite (27.7%), nuclear  BNetzA 2009 monitoring report Development of (28.8%), hard coal (21.6%), gas (13.7%), pumped storage (1.2%) the conventional (data from 2008

  16. Slide 16: Assumptions (3/6)

    Slide 16: Assumptions (3/6)

    Assumptions (3/6) Assumptions on PV systems installed in Germany in 2000-2011e Model components Description Sources  900 kWh/kWp as an average figure  I-suppli 2010, ISET "Value of PV Revenue energy in Germany", 2008 • Average degradation of 0.5 % p.a. is assumed for the systems  Osterwald et al.

  17. Slide 17: Assumptions (4/6)

    Slide 17: Assumptions (4/6)

    Assumptions (4/6) PV value model assumption Model components Description Sources  A.T. Kearney analysis based on  Avoided grid losses, medium voltage (2.2%) destatis (German Federal Statistical Grid losses  Avoided grid losses, low voltage (4.4%) Office)   0.1 EURc/kWh until 2015, then 0.2 EURc

  18. Slide 18: Assumptions (5/6)

    Slide 18: Assumptions (5/6)

    Assumptions (5/6) Assumptions on PV cost development – new installations between 2010 and 2020 Model components Description Sources  EU PhotoVoltaic Technology  Continuous increase in solar conversion efficiency; rising to 18.4% Platform, 2010 Module efficiency for c-Si modules (multi-crystalline)

  19. Slide 19: Assumptions (6/6)

    Slide 19: Assumptions (6/6)

    Assumptions (6/6) Assumptions on PV cost development – new installations between 2010 and 2020 Model components Description Sources  The model incorporates financing costs by discounting future cash flows with a WACC  Based on cost model assumptions Financing costs &  The following WACC were assu

  20. Slide 20: Abbreviations used in the document

    Slide 20: Abbreviations used in the document

    Abbreviations used in the document Abbreviations used in the study AR = Anti-reflecting MV = Medium voltage BNetzA = Bundesnetzagentur, the German regulatory office O&M = Operation & maintenance BOS = Balance of systems PD&I = Project development & installation CAGR = Compound average growth rate PV