Phoenix Solar — Technical Presentation (November 2010)
20 slides from Phoenix Solar's technical presentation, Nov 3, 2010

Slide 1: The True Value of Photovoltaics for Germany – Summary of study findings
The True Value of Photovoltaics for Germany – Summary of study findings – Hand-out for the press conference 3 November 2010, 10.00 a.m. Berlin, Haus der Bundespressekonferenz Schiffbauerdamm 40, room 1 Translated and edited version, 21 November 2010 Dr. Andreas Hänel – CEO of Phoenix Solar AG Jochen

Slide 2: Contents
Contents Brief summary of study findings Appendix: Basic assumptions and abbreviations used 10/09.2010/40429d 2

Slide 3: The key objective of the study is to evaluate the true value of photovoltaics
The key objective of the study is to evaluate the true value of photovoltaics (PV) for Germany Current situation Study objectives The surprisingly strong growth Provide a pragmatic, holistic analysis as input for the of photovoltaics poses debate in response to two main questions: challenges for

Slide 4: The true value of PV for Germany is significantly higher than the current debate indicates
The true value of PV for Germany is significantly higher than the current debate indicates Summary of key findings The EPEX wholesale market price is not a suitable benchmark for valuing photovoltaic electricity The full cost of new gas and coal-fired power plants, on the other hand, is an adequate

Slide 5: The true value of PV for Germany is significantly higher than the current debate indicates
The true value of PV for Germany is significantly higher than the current debate indicates Summary of key findings If the true value of photovoltaics is taken into account, photovoltaics will be a competitive alternative to electricity provided by gas and coal-fired power plants Competitiveness in 5

Slide 6: Adequate valuation of PV results in 18-24% lower levies for PV
Adequate valuation of PV and our installed capacity assumptions result in 18-24% lower levies for PV Value of PV: Calculating the EEG levy on photovoltaics for end consumers Calculation under Calculation using adequate current EEG rules – differential cost based on Due to major forecast variation

Slide 7: Additional PV installed capacity in Germany will reach macroeconomic breakeven in 2010
Additional PV installed capacity in Germany will reach macroeconomic breakeven in 2010 Value of PV: Investment case for installed PV capacity in a single year Benefit of EEG tariff investment in photovoltaics Comments in a specific year in EUR m (annuity) 388 The PV capacities installed in 2010 ge

Slide 8: The return on all PV installations built between 2000 and 2011e is slightly positive
The return on all PV installations built between 2000 and 2011e is slightly positive for Germany Value of PV: Investment case for capacities installed in 2000-2011e IEA: "higher" fuel prices Non-quantified benefits 4% Reduced import dependency 33% Contribution to structural change 62% 81% Key as

Slide 9: PV becomes competitive in 5 to 8 years
Taking into account environmental costs and system effects, PV becomes competitive in 5 to 8 years Competitiveness: Conventional vs PV generation prices in Germany (real prices, in 2010 EURc/kWh) Conventional generation prices plus PV generation prices2 for LV and MV plus complete CO2 avoidance cost

Slide 10: PV is a key enabler of the structural transition to an efficient and distributed energy world
PV is a key enabler of the structural transition to an efficient and distributed energy world Structural change: PV's contribution to structural change Area of change PV's contribution to structural change Reduces degree of concentration in the National oligopolistic power generation market power Re

Slide 11: There is need for action by all stakeholders to ensure further development of PV
There is need for action by all stakeholders to ensure further development of PV in Germany Summary of needed actions Political / legal Energy market PV framework industry Value of PV • Adjust marketing mechanism • Ensure flexibility of • Further develop PV to reflect adequate valuation in conventio

Slide 12: Contents
Contents Brief summary of study findings Appendix: Basic assumptions and abbreviations used 10/09.2010/40429d 12

Slide 13: Description of PV-value components
Description of PV- value components BACK-UP Component Subcomponent Explanation Includes all tariff payments for capacities installed between 2000 1 EEG tariff payments and 2011 Revenues from power sales at EPEX 2 Revenues from power sales at EPEX, including peak load (current EEG marketing) duri

Slide 14: Assumptions (1/6)
Assumptions (1/6) Assumptions on the price of generating power from conventional energy sources Model components Description Sources International Energy Agency (World Coal: Reference case (2010: USD/t 65.9, 2050: 119.0), Energy Outlook 2009) Fuel costs higher price sensitivity case (2010: USD/t

Slide 15: Assumptions (2/6)
Assumptions (2/6) Power plant mix and cost assumptions Model components Description Sources Current power plant mix: hydro (3.5%), lignite (27.7%), nuclear BNetzA 2009 monitoring report Development of (28.8%), hard coal (21.6%), gas (13.7%), pumped storage (1.2%) the conventional (data from 2008

Slide 16: Assumptions (3/6)
Assumptions (3/6) Assumptions on PV systems installed in Germany in 2000-2011e Model components Description Sources 900 kWh/kWp as an average figure I-suppli 2010, ISET "Value of PV Revenue energy in Germany", 2008 • Average degradation of 0.5 % p.a. is assumed for the systems Osterwald et al.

Slide 17: Assumptions (4/6)
Assumptions (4/6) PV value model assumption Model components Description Sources A.T. Kearney analysis based on Avoided grid losses, medium voltage (2.2%) destatis (German Federal Statistical Grid losses Avoided grid losses, low voltage (4.4%) Office) 0.1 EURc/kWh until 2015, then 0.2 EURc

Slide 18: Assumptions (5/6)
Assumptions (5/6) Assumptions on PV cost development – new installations between 2010 and 2020 Model components Description Sources EU PhotoVoltaic Technology Continuous increase in solar conversion efficiency; rising to 18.4% Platform, 2010 Module efficiency for c-Si modules (multi-crystalline)

Slide 19: Assumptions (6/6)
Assumptions (6/6) Assumptions on PV cost development – new installations between 2010 and 2020 Model components Description Sources The model incorporates financing costs by discounting future cash flows with a WACC Based on cost model assumptions Financing costs & The following WACC were assu

Slide 20: Abbreviations used in the document
Abbreviations used in the document Abbreviations used in the study AR = Anti-reflecting MV = Medium voltage BNetzA = Bundesnetzagentur, the German regulatory office O&M = Operation & maintenance BOS = Balance of systems PD&I = Project development & installation CAGR = Compound average growth rate PV
Source: Internet Archive copy of phoenixsolar-group.com
More decks from Phoenix Solar AG
Investor Presentation (November 2017)20 slides · November 2017
Investor Presentation (May 2017)32 slides · May 2017
Investor Presentation (March 2016)35 slides · March 2016
Investor Presentation (November 2015)40 slides · November 2015
Investor Presentation (September 2015)40 slides · September 2015
Investor Presentation (September 2015)35 slides · September 2015