Cloud Peak Energy Inc

Cloud Peak Energy — Morgan Stanley Global Basic Materials Conference 2010

20 slides from Cloud Peak Energy's conference presentation, Feb 25, 2010

  1. Slide 1: Morgan Stanley Global Basic Materials Conference

    February 25, 2010 Morgan Stanley Global Basic Materials Conference

  2. Slide 2: Cautionary Note Regarding Forward-Looking Statements

    1 Cautionary Note Regarding Forward-Looking Statements This presentation contains “forward-looking statements” within the meaning of the safe harbor provisions of Section 27A of the Securities Act of 1933 and Section 21E of the Securities Exchange Act of 1934. Forward-looking statements are not stat

  3. Slide 3: Cloud Peak Energy Highlights

    2 Cloud Peak Energy Highlights Significant growth opportunity Strong Powder River Basin (“PRB”) market dynamics, pricing upside, production growth and lease acquisitions Market outlook Demand strengthening Pure-play Powder River Basin Third-largest U.S. coal producer, operating three large surface m

  4. Slide 4: Company Background

    3 Cloud Peak Energy Inc. – IPO November 2009 Rio Tinto Energy America formed through acquisitions 1993 – 1998 2008 Rio Tinto decided to divest to reduce Alcan purchase debt 2008 Colowyo mine retained by Rio Tinto, 2009 Jacobs Ranch Mine sold to Arch Coal Traded NYSE – ticker symbol “CLD” Cloud Peak

  5. Slide 5: Highlights

    4 Significant growth opportunity Market outlook Pure-play Powder River Basin Third largest U.S. coal producer Three large surface mines Operating in the U.S. coal basin with the greatest growth potential Cloud Peak Energy Highlights

  6. Slide 6: Mines Have Favorable Rail Access

    5 Mines Have Favorable Rail Access 0 100 mi Legend

  7. Slide 7: Operations

    6 Operations (1) Cloud Peak Energy Management. (2) J.T. Boyd as of 12/31/2008. Key Operating Statistics 2009 Production(1) 34.0m tons 2008 Total Proven & Probable Reserves2326m tons Reserve Coal Quality(2) 8,850 Btu/lb Antelope Mine Cordero Rojo Mine Key Operating Statistics 2009 Production(1) 39.3m

  8. Slide 8: Operations (cont'd)

    7 Operations (cont’d) Spring Creek Mine Decker Mine (50% non-operating interest) Key Operating Statistics 2009 Production(1) 17.7m tons 2008 Total Proven & Probable Reserves2 317m tons Reserve Coal Quality(2) 9,350 Btu/lb Key Operating Statistics (50%) 2009 Production(1) 2.3m tons 2008 Total Proven

  9. Slide 9: Strong Safety Record Indicates Well Run Operations

    8 0.49 0.61 0.96 1.90 1.92 1.92 2.17 2.85 2.87 3.17 3.18 3.22 3.79 3.90 4.19 4.31 4.50 4.52 5.17 5.72 6.51 7.55 9.21 12.25 Kiewit Cloud Peak Energy NACCO Arch Coal Energy Future TXU Peabody Westmoreland CONSOL Magnum Coal Pacific Minerals Chevron Alpha Natural BHP Billiton Foundation Coal James Rive

  10. Slide 10: Market outlook

    9 Market outlook Significant growth opportunity Strong PRB market dynamics Pricing upside Production growth Coal lease acquisitions Cloud Peak Energy Highlights Pure-play Powder River Basin

  11. Slide 11: Declining Coal Production in Central Appalachia

    10 Declining Coal Production in the East Central Appalachian Coal Production in Secular Decline 128 141 186 235 250 270 1995 2000 2005 2010E 2015E 2020E High cost operations - Underground mining - Degrading reserve quality - High legacy liabilities (black lung, pensions, and reclamation) Headwinds o

  12. Slide 12: Increasing Long-Term International Demand Supports Pricing

    11 Increasing Long-Term International Demand Supports Powder River Basin Pricing Australia Japan China Europe USA South America South Africa Asia Source: Cloud Peak Energy Management. Increasing Trend Decreasing Trend PRB Impact

  13. Slide 13: Economic Reach of PRB Coal is Growing

    12 Source: Ventyx, Velocity Suite Economic Reach of PRB Coal is Growing Consumption of PRB Coal

  14. Slide 14: Future U.S. Coal Demand Met by Low-cost coal supply

    13 Future U.S. Coal Demand Met by Powder River Basin Low-cost coal supply Surface mining Less restrictive permitting process Low sulfur content Substantial unleased tonnage Surplus rail capacity

  15. Slide 15: Forward Coal Prices

    15 $8.70 $8.95 $11.30 $12.95 $9.05 $11.15 $11.70 $14.90 $14.10 $13.10 $12.10 $6.00 $7.00 $8.00 $9.00 $10.00 $11.00 $12.00 $13.00 $14.00 $15.00 $16.00 Q2 10 Q3 10 Q4 10 CY 11 CY 12 CY 13 8800 Btu at 10/30/09 8800 Btu at 02/19/10 Powder River Basin Forward Coal Prices U.S. PRB Coal Price Source: ICAP.

  16. Slide 16: Production Growth Opportunity

    16 Production Growth Opportunity 91 million ton 2010E production Disciplined production increases, if market conditions are favorable 8 million tons additional capacity by 2013 with minimal capital expenditure to satisfy: - Incremental domestic demand - Incremental demand from export markets Product

  17. Slide 17: Lease Acquisition Strategy

    17 Cloud Peak Energy Lease Acquisition Strategy Source: Cloud Peak Energy management. Note: Acquired tonnage is not classified as reserve until verified with sufficient technical and economic analysis. Maps not to scale. Tonnage applied for in million tons (1) Allows access to additional 81 million

  18. Slide 18: Highlights

    18 Significant growth opportunity Cloud Peak Energy Highlights Market outlook Demand strengthening Pure-play Powder River Basin

  19. Slide 19: External environment improving

    19 External environment improving Electricity demand recovering EIA is forecasting electric generation will grow by 1.9% for 2010 - (compared to a 3% decline in 2009) Cooler weather across much of the US to start the year. Coal production Estimated coal production for 2009 down approximately 95 m/to

  20. Slide 20: Questions?

    ‘AY CLOUD PEAK ENERGY™ Questions?

Cloud Peak Energy — Morgan Stanley Global Basic Materials Conference 2010 on 6ix