  1. Slide 1: Gas to Power in Botswana

    “Gas to Power in Botswana” ASX ticker: TOU AIM ticker: TLOU December 2015

  2. Slide 2: Disclaimer

    Disclaimer Disclaimer This presentation (Presentation) has been prepared by Tlou Energy Limited (Tlou). The Presentation and information contained in it is being provided to shareholders and investors for information purposes only. The information contained in this disclaimer does not constitute an

  3. Slide 3: Disclaimer continued

    Disclaimer continued Future performance This Presentation contains certain “forward-looking statements”. Forward looking words such as, “expect”, “should”, “could”, “may”, “plan”, “will”, “forecast”, “estimate”, “target” and other similar expressions are intended to identify forward-looking statemen

  4. Slide 4: Company Snapshot

    Company Snapshot  ASX Listed (Ticker: TOU); ASX Trading – last 6 months AIM Listed (Ticker: TLOU)  8,300km² CBM permits in Botswana  Energy deficit in Botswana and wider Southern Africa region  Focused on commercialising gas in 2016  CEO (8.66%) and Chairman (8.11%) are the largest shareholders

  5. Slide 5: Botswana CBM Project

    Botswana CBM Project ~ Letihakane . LEGEND =—1 Proposed Gas Pipeline CNG Route Substation Power Plant Gas Plant Pilot Pod Camp & Laydown Yard Transmission Network oe 33 KV oe BB KV ae 132 KV 220 kV ~~ 400 KV CNG Road Transport _Lesedi CBM Project Permit {il Mamba Project Permit {7 Administration Bor

  6. Slide 6: Board of Directors

    Board of Directors Anthony (Tony) Gilby – MD & CEO • Geologist with >30 years industry experience • Co-founder of a number of CBM companies including Sunshine Gas • Previous technical roles for ESSO & Exxon • Took Sunshine Gas from small CBM explorer to certified 3P gas reserves >1,000PJ’s • Led tak

  7. Slide 7: Strong Track Record

    Strong Track Record  The founders of Tlou were pioneers of the CBM industry in Queensland  Tony Gilby developed ASX-listed Sunshine Gas from a small exploration company to its eventual takeover by QGC (BG) in 2008  Nathan Mitchell, CEO of Mitchell Drilling, pioneered Surface to In-Seam drilling a

  8. Slide 8: Listed Peer Group

    Listed Peer Group 2P + 2C EV to Company Country Type Stage EV resources 2P+2C US$m Bcf US$/Bcf Green Dragon Gas China CBM Production 699.7 446.8 1.57 Wentworth Resources Tanzania Conventional Development 90.7 95.5 0.95 Aminex Tanzania Conventional Development 53.1 68.9 0.77 Victoria Oil & Gas Camero

  9. Slide 9: Key Steps to Unlock Value

    Key Steps to Unlock Value LOW Gas Production H2 2016 to power Reserve H1 2016 certification Development Risk Sustained gas Q1 2016 production Dewater multi-well pilots Multi-well pilot pod expansion Flowed gas from single pilot pod HIGH 9

  10. Slide 10: Market & Commercialisation

    Market & Commercialisation 10

  11. Slide 11: Electricity Supply & Demand

    Electricity Supply & Demand Source: Norconsult Market Report, 2013  Botswana is looking to increase the supply of power from the Morupule B power station commissioned in 2013  Morupule B consists of 4x132 MW units of net capacity at a cost of P11 billion (>US1 billion); only 2 units are currently

  12. Slide 12: Investment Proposition

    Investment Proposition  Tlou provides the entry point into the most advanced gas project in Botswana  Botswana has a severe energy shortage and is relying on non-firm imports and diesel generation  Tlou has an immediate and long term opportunity to provide domestic gas/power and displace the expe

  13. Slide 13: Proposed Sales Routes

    Proposed Sales Routes Phase Market Opportunity Strategy 1 Compressed • Off-grid power solution for  Production testing Selemo multi-well pilot pods Natural Gas (CNG) mining companies (~1- 5  Install 1MW compressed natural gas (CNG) MW’s) equipment  Convert Selemo wells and field operations to gas

  14. Slide 14: Investor Highlights

    Investor Highlights Most advanced Highly A$43m project CBM gas project experienced investment (as in Botswana team at June 2015) Key milestones Premium gas to deliver Multiple routes price shareholder to monetise gas environment value 14

  15. Slide 15: Company Summary

    a TLOU ENERGY Company Summary 15

  16. Slide 16: History

    History  Listed on ASX in April 2013; Listed on AIM November 2015  A$43m project investment as at June 2015 Vertical Pilot Contingent Tlou farm-in: Wells: Lateral Pilot Wells: Resource Upgrade: 1,321 desorption Pre-feasibility pilot 2 lateral pilot pods at Certified by SRK – samples from wells (2

  17. Slide 17: Botswana CBM Project

    Botswana CBM Project TLOU ENERGY Power Station ANGOLA Diamond Mine 6 BOTSWANA ZIMBABWE ‘ fitz . LN NAMIBIA y \ \ Morupule Power } \ Selemo Pilot Pod Station \ | supp \ Lesedi Pilot Pod t 3S - Pat = Ser Cc = \ re S08 cy coin urvien ‘© ™ \ ff Pay ® \ \ t ‘GABORONE veceno ‘ Tlou Base Camp \ 1 Main road

  18. Slide 18: Reserves and Contingent Resources

    Reserves and Contingent Resources Certified Resource Statement Unrisked Gross Unrisked Net OGIP(1) (100 Percent) (100 Percent) Certified Contingent Resource Category (BCF) (BCF) (BCF) Contingent Resources (SRK, 2015)  4.9 BCF (1C) Low Estimate (1C) 7.6 4.9 4.9  239 BCF (2C) Best Estimate (2C) 367.

  19. Slide 19: Lesedi CBM Project Technical Fundamentals

    Lesedi CBM Project Technical Fundamentals Coal depth ~260-764m Cumulative net coal thickness 24m (Average) Gas contents 4-6 m3/t (DAF) (Average) Unstimulated reservoir ~2-5mD permeability per DST Gas compositions 80-95% methane 19

  20. Slide 20: Lesedi Operations

    Lesedi Operations Aerial view of Operations Selemo Pod Gas flare - Selemo Pod December 2014 20

  21. Slide 21: Lesedi Project

    Lesedi Project TLOU ENERGY y Sh ‘\ € 25% Bela TIN 328 ~1000m ~150m 2015 Selemo. Expansion D3-3X -<O- Selemo 1P Dec’ 10km ra Approximate z= C1-2X Lesedi 1P Agen’ Gas gathering Tine (proposed) Mopani 1P Pre-existing 5 spot @ Fomy Tlou Energy Field Camp @ ’ LEGEND ” Gas flow recorded Potential gas prod

  22. Slide 22: Thank You

    Thank You 210 Alice St Brisbane QLD 4000 Australia Tel: +61 7 3012 9793 Ground Floor, Victoria House 132 Independence Avenue Gaborone Botswana Tel: +267 316 0857 www.tlouenery.com info@tlouenergy.com ASX: TOU AIM: TLOU

  23. Slide 23: Appendix

    ee |h6hlUet TLOU ENERGY Appendix 23

  24. Slide 24: Coal Bed Methane (CBM)

    Coal Bed Methane (CBM)  CBM is chemically identical to other sources of gas but is produced by non-conventional methods  CBM is extracted from coal seams rather than from sandstone reservoirs  The main component of natural gas is methane  CBM is produced by drilling into and then along coal seam

  25. Slide 25: The Global CBM Industry

    The Global CBM Industry China  First CBM project in 1995  By end of 2015 2850 MW will supply 3.2 Million households with CBM/CMM fuels Australia  CBM contributed 87% USA of Queensland gas  Pioneered CBM production in 2014 industry in 1970-80’s  CBM expected to  Approx. 7% of all gas contribute

  26. Slide 26: Horizontal Pilot Design

    Horizontal Pilot Design • Horizontal wells (~750m in-seam) with vertical pumping well • Lesedi pod completed as a dual lateral • Selemo pod completed as a single lateral • Target Reservoir: Basal Morupule coal seam (~6m) 26

  27. Slide 27: Botswana

    Botswana  Stable jurisdiction  Extensive coal resources  Gassy coal  Attractive operating and regulatory regime  Major energy shortfall in the Botswana and the South Africa region  High energy prices  Large mining industry to power 27