  1. Slide 1: An Emerging High Grade, Multi-Commodity Mining Company

    For personal use only AN EMERGING HIGH GRADE, MULTI-COMMODITY MINING COMPANY MAY 2015 1

  2. Slide 2: Disclaimer

    DISCLAIMER • This presentation has been prepared by Aurelia Metals Limited (“AMI” or the “Company”). It should not be considered as an For personal use only offer or invitation to subscribe for or purchase any securities in the Company or as an inducement to make an offer or invitation with respect

  3. Slide 3: Compliance Statement - Listing Rules 5.16-5.18

    COMPLIANCE STATEMENT LISTING RULES 5.16-5.18 This investor presentation contains forecast rates for the production of gold, lead and zinc from the Hera For personal use only Project. These production targets were developed under a Definitive Feasibility Study (‘DFS’) as announced to the ASX on the 1

  4. Slide 4: Corporate Snapshot

    CORPORATE SNAPSHOT For personal use only CAPITAL STRUCTURE Shares on issue (ASX:AMI) 387.3 million Options & Performance Rights 4.2 million Market Capitalisation (at 24cps) $93 million Est. Cash – (March 15) $12.4million Drawn Funding Facilities1 $105 million Undrawn Funding facilities (Nymagee) 1 $

  5. Slide 5: Cobar Superbasin Deposits

    COBAR SUPERBASIN DEPOSITS SCHEMATIC For personal use only COBAR BASIN DEPOSITS – HIGH GRADE + LONG LIFE COBAR SUPERBASIN METAL INVENTORY 6.4Moz Au, 200Moz Ag, 2.2Mt Cu, 4Mt Zn, 3Mt Pb Australia NSW 5

  6. Slide 6: Hera and Nymagee Projects

    HERA AND NYMAGEE PROJECTS FULLY FUNDED HIGH-GRADE DEVELOPMENT WITH MAJOR EXPLORATION UPSIDE For personal use only STAGE 1: HERA DEPOSIT (AMI-100%) – IN PRODUCTION • High grade gold-lead-zinc-silver production in NSW • Commercial Production declared from 1st April 2015 • Scaling up to average product

  7. Slide 7: Aurelia's Achievements

    AURELIA’S ACHIEVEMENTS PURCHASE, DELIVERY, EXTENSION PROJECT PURCHASE – SEPTEMBER 2009 For personal use only NYMAGEE DISCOVERY – OCTOBER 2010 HERA DFS – SEPTEMBER 2011 HERA PERMITTING APPROVAL – JULY 2012 PROJECT FINANCING– NOVEMBER 2012 CONSTRUCTION COMMENCEMENT – JAN 2013 FIRST GOLD POUR– SEPT 201

  8. Slide 8: Hera DFS Key Metrics

    HERA DEVELOPMENT For personal use only HERA DFS KEY METRICS – STAGE 1 HERA DEVELOPMENT Resources (April 2015) 3.2Mt @ 3.75g/t Au, 3.5% Pb, 4.6% Zn and 33g/t Ag Reserves (September 2011) 1.8Mt @ 3.6g/t Au, 2.5% Pb, 3.5% Zn and 15g/t Ag Initial Mine Life 7.3 years from portal - + 2 years implied Estim

  9. Slide 9: Mine: Gold-Lead-Zinc

    HERA MINE GOLD-LEAD-ZINC For personal use only Gold-Silver DFS production pa: Gold: 39,000oz Silver: 154,800oz Lead-Zinc DFS production pa: Lead: 7,800t Zinc: 10,800t 9

  10. Slide 10: Improving Base Metals Market

    HERA MINE GOLD-LEAD-ZINC • Improving Base Metals Market For personal use only • Broad consensus on improving market – particularly for Zinc Zinc price vs Zinc Stocks Chinese Galvanised Sheet Production Source: Wood Mackenzie Source: Wood Mackenzie Aurelia share price ($AUD) v's Zinc price ($USD) $0.

  11. Slide 11: Volatile Gold Market

    HERA MINE GOLD-LEAD-ZINC • Volatile Gold Market For personal use only • Downside protected with A$1500/oz put options – 26,445oz • Prudent forward sales of 8,900oz Au at A$1591 Forward sales Put Options 11

  12. Slide 12: Mine Layout

    HERA MINE - LAYOUT For personal use only BOXCUT WASTE ROCK DUMP POWER STATION ROM PAD PROCESS PLANT PYBAR PROCESS WATER DAM ADMIN NORTH 12

  13. Slide 13: Village

    HERA VILLAGE For personal use only Hera Village – 80 permanent rooms 13

  14. Slide 14: Underground

    HERA UNDERGROUND For personal use only Hera Underground 14

  15. Slide 15: Process Plant

    HERA PROCESS PLANT For personal use only Hera Process Plant 15

  16. Slide 16: Process Facility

    HERA MINE PROCESS FACILITY CONCENTRATE LEACH TANKS GRINDING AND GRAVITY MODULE For personal use only 34% GOLD RECOVERY (TOTAL 94%) 60% GRAVITY GOLD RECOVERY 47% SILVER RECOVERY TERTIARY CRUSHING FLOTATION CIRCUIT 56% LEAD + ZINC BULK CONCENTRATE PRIMARY AND SECONDARY 91% LEAD RECOVERY CRUSHING - 120

  17. Slide 17: Process Facility - Ramp Up

    HERA MINE PROCESS FACILITY – RAMP UP Commercial Production declared from 1st April 2015 Throughput: For personal use only • Mill throughput for the March quarter was 84% of the design rate of 350,000 t per annum, • Reaching 100% of design throughput in early May. Further minor capital projects to im

  18. Slide 18: Exploration

    HERA EXPLORATION For personal use only Massive zinc sulphides – Hera North 18

  19. Slide 19: Gold-Lead-Zinc Deposit Exploration Potential

    HERA GOLD-LEAD-ZINC DEPOSIT EXPLORATION POTENTIAL PEAK GOLD MINES COBAR HERA DEPOSIT For personal use only SCHEMATIC LONG SECTION SCHEMATIC LONG SECTION Hera: 2.44Mt @ 4.1g/t Au, 6.6% Pb+Zn Western Lead Zinc 0.9Mt @ 6.8g/t Au, 2% Pb+Zn 500m Peak (pre-mining) 5.2Mt @ 9.1g/t Au, 0.8% Cu POTENTIAL? 100

  20. Slide 20: Mine and Resource: Resource Upgrade April 2015

    HERA MINE AND RESOURCE RESOURCE UPGRADE – APRIL 2015 Decline commenced January For personal use only 2013. Underground ahead of schedule with eight (8) production levels fully or partially developed New Resource Estimate April 2015 • 32% increase in tonnes • 27% increase in Pb grade • 19% increase i

  21. Slide 21: Regional Exploration

    HERA REGIONAL EXPLORATION For personal use only HERA DEPOSIT N 500m HEBE MAGNETIC ANOMALY Magnetic Image map showing the location of drill hole Drill core from HBRC001 approx 490m, showing intense HBRDC001. Existing drill traces shown in blue. chlorite alteration (khaki colour) with zinc sulphide (b

  22. Slide 22: Prospectivity: Hera-Nymagee Corridor

    PROSPECTIVITY HERA-NYMAGEE CORRIDOR For personal use only • Hera-Nymagee corridor remains highly prospective • The Hera & Nymagee deposits are both marked by prominent gravity highs • Numerous gravity targets now defined by detailed ground gravity along 20km of strike • Potential for Hera-Nymagee co

  23. Slide 23: Nymagee Copper Deposit

    NYMAGEE COPPER DEPOSIT 3D ISOMETRIC • Historical production ~ 420,000t @ 5.8% Cu For personal use only • AMI discovered high grade copper in Oct 2010 • Maiden JORC Nymagee Resource in Dec 2011 • 8.1Mt @ 1.2% Cu, 0.3% Pb, 0.7% Zn & 9g/t Ag • Open to the north and at depth • Represents an analogue to

  24. Slide 24: Nymagee Copper Deposit vs CSA

    NYMAGEE COPPER DEPOSIT vs CSA SCHEMATIC CROSS SECTION COMPARISON - LOOKING NORTH For personal use only • Nymagee evolving as MAIN SHAFT SHALLOW COPPER ZONE the upper part of a ‘CSA’ style Cobar CSA – Cross Section >1.5Mt Cu Production Pb-Zn-Ag Lens deposit >12mt @ 5% Cu Resource (off section) Nymage

  25. Slide 25: Nymagee Copper Deposit: Open to North and at Depth

    NYMAGEE COPPER DEPOSIT OPEN TO NORTH AND AT DEPTH – NYMAGEE LONG SECTION • Deep drilling at For personal use only Nymagee confirms continuity of copper mineralisation >700m • Nymagee North mineralisation increasing intensity with depth • Multiple untested DHEM conductor 2 targets at depth 1 3 25

  26. Slide 26: Building a Mid-Tier Mining Company

    For personal use only BUILDING A MID-TIER MINING COMPANY ASX:AMI 2 Corporation Place ORANGE NSW 2800 T: +61 2 6363 5200 E: office@aureliametals.com www.aureliametals.com 26

  27. Slide 27: Appendix 1: Resources and Reserves

    APPENDIX 1: RESOURCES AND RESERVES For personal use only MINERAL RESOURCE ESTIMATE - HERA APRIL 2015 Category Tonnes NSR ($/t) Au (g/t) Ag (g/t) Cu (%) Pb (%) Zn (%) Total Measured 840,000 310 5.58 15.9 0.24 3.12 3.64 Total Indicated 1,270,000 222 3.40 16.0 0.13 2.78 4.28 Total Inferred 1,122,000 23

  28. Slide 28: Appendix 2: Board of Directors

    APPENDIX 2: BOARD OF DIRECTORS For personal use only Partner of PricewaterhouseCoopers Australia (Coopers & Lybrand) for 19 years specialising in the Anthony Wehby provision of corporate finance advice. Anthony is based in Sydney and maintains a consulting practice Non-Executive Chairman providing a

  29. Slide 29: Appendix 3: Hera Development DFS

    APPENDIX 3: HERA DEVELOPMENT DFS – SEPTEMBER 2011 For personal use only HERA DFS 3D view of Hera Mine Design showing mine capital development, Diluted Reserve (tonnes) 1,875,918 final stope design and CRF fill. Diluted Reserve Grade  Net Smelter Return (NSR) $218 / tonne Mine Life (box cut to last

  30. Slide 30: Appendix 4: Cobar Superbasin Deposits

    APPENDIX 4: COBAR SUPERBASIN DEPOSITS For personal use only Pb-Zn-Ag rich COOLER HOTTER Cu rich 30

  31. Slide 31: Appendix 5: Glencore Funding Structure

    APPENDIX 5: GLENCORE FUNDING STRUCTURE For personal use only Facility A Limit: A$20 million Converting Note Facility Conversion: Convertible at AMI’s option at $0.251 Interest Rate: 3M AUD BBSW + 4% Use of Funds: Hera Development, Nymagee feasibility study and development, working capital Maturity D

  32. Slide 32: Appendix 6: Competent Persons Statements

    APPENDIX 6: COMPETENT PERSONS STATEMENTS Competent Persons Statement – Exploration Results For personal use only The information in this report that relates to Exploration Results is based on information compiled by Rimas Kairaitis, who is a Member of the Australasian Institute of Mining and Metallu