Torex Gold Resources Inc. · TSX:TXG

Torex Gold Resources — Investor Presentation (June 2019)

33 slides from Torex Gold Resources's investor presentation, June 2019

  1. Slide 1: Asset – Team – Game Changing Technology

    TSX: TXG June 2019 Asset – Team – Game Changing Technology 1

  2. Slide 2: Safe Harbour Statement

    Safe Harbour Statement THE PRELIMINARY ECONOMIC ASSESSMENT (THE ‘MEDIA LUNA PEA” OR “PEA”) IS BASED ON THE TECHNICAL REPORT (DEFINED BELOW). THE PEA IS A CONCEPTUAL STUDY OF THE POTENTIAL VIABILITY OF MINERAL RESOURCES OF THE MEDIA LUNA PROJECT. THE PEA IS NOT A PREFEASIBILITY STUDY OR FEASIBILITY S

  3. Slide 3: Torex Has The Ingredients To Continue Growing A Profitable Business

    Torex Has The Ingredients To Continue Growing A Profitable Business We all look forward to delivering the potential of our assets… ...and producing significant added value via growth and innovation 3

  4. Slide 4: Multiple Areas Of Focus In 2019

    Multiple Areas Of Focus In 2019 Delivering strong cash flow from El Limón Guajes and advancing Media Luna… …while proving up Muckahi and expanding underground potential  Deliver on full year 2019(1) guidance  Gold sold: 430,000 oz +/- 7%  TCC/oz sold(2): $580/oz +/- 7%  AISC/oz sold(2): $790/oz

  5. Slide 5: El Limón Guajes Is Expected To Provide Significant Cash Flow To Advance Growth Opportunities

    El Limón Guajes Is Expected To Provide Significant Cash Flow To Advance Growth Opportunities The below chart is the anticipated year end cash position from ELG (1)… …Muckahi will provide options to invest the cash for greater returns US$M Debt Cash Balance (YE) Excl. Restricted cash of $26.8M 1) Fin

  6. Slide 6: Year End Cash Position During Build-Out Of Media Luna

    Year End Cash Position During Build-Out Of Media Luna(1) Two scenarios for Media Luna - Conventional mining and Muckahi… …conventional mining has an after tax IRR of 27%, with Muckahi it is 46% 1) Financial estimates as per September 4, 2018 Technical Report (see Addendum). 6

  7. Slide 7: The Property Has The Potential To Offer A Great Deal More Beyond El Limón Guajes And Media Luna

    The Property Has The Potential To Offer A Great Deal More Beyond El Limón Guajes And Media Luna ‘Purple’ has been a good place to look for gold and copper… …most of the ‘purple’ targets have not been drilled yet 1) For details of the mineral resource and reserve estimates (see Addendum). 7

  8. Slide 8: Sub-Sill & ELD Both Provide Future Growth Potential

    Sub-Sill & ELD Both Provide Future Growth Potential ELD is the down dip extension of the El Limón Pit, drilling it now… ...Sub-Sill is also being drilled down dip and down plunge • R Sub-Sill Deposit El Limón Final Pit Enlarged View Limits • T • A • X Sub-Sill Deposit ELD Deposit Interpreted As ‘Pod

  9. Slide 9: Near Term Growth & Replacement Of The Open Pit Cash Flow

    Near Term Growth & Replacement Of The Open Pit Cash Flow An elegant design for Media Luna has been further optimized... ...an updated PEA was announced in September 2018 Looking East  Current inferred resource of 7.4 million Au Eq. Oz. at a grade of 4.48 g/t(1)(2)  Potential to grow – Resource is

  10. Slide 10: Getting Out Of The Box To Create Value and Strategic Options

    Getting Out Of The Box To Create Value and Strategic Options We are developing what could be an industry changing technology… Top - Media Luna with current technology. Bottom - With Muckahi (1) Looking East Conventional Mine Design For The Media Luna Deposit Media Luna Designed With Torex’s Propriet

  11. Slide 11: Muckahi – Single Asset Diversification Is Of Interest

    Muckahi – Single Asset Diversification Is Of Interest Muckahi, which is expected to be proven in 2019, would give us… …a material advantage when competing for assets 1) See first paragraph of slide 2. 11

  12. Slide 12: Muckahi – The Elevator Ride Explanation

    Muckahi – The Elevator Ride Explanation The question that led to its development is “Why would anyone want to run a logistics business on single lane roads?” Muckahi is expected to achieve the following:  Continuous material handling of ore from the stope to the shaft or surface (Conveyors instead

  13. Slide 13: Muckahi – Development Of The Technology Is Progressing Rapidly, Testing Is Underway

    Muckahi – Development Of The Technology(1) Is Progressing Rapidly, Testing Is Underway - Expected Completion, End Of 2019 The ‘working bits’ of the equipment are ‘off-the-shelf’… ...the design work is in the carrier, testing of first-gen is underway Four test objectives for 2019  Monorail base deve

  14. Slide 14: Muckahi – Turning Intention Into Reality

    Muckahi – Turning Intention Into Reality The Muckahi Rock Drill (Jumbo) and this Service Platform are on-site. Two other Muckahi machines are being built. The Jumbo has been successfully operated, tunneling blasts were successfully completed in Q1, and the Service Platform is expected to be in servi

  15. Slide 15: The New Government Acknowledges The Importance Of Mining For The Development Of Rural Areas

    The New Government Acknowledges The Importance Of Mining For The Development Of Rural Areas Initial government plans for the industry… …seem well aligned with Torex values and protocols  Accelerate investment of royalty monies into ‘mining’ communities  Enforcement of environmental regulation  Gr

  16. Slide 16: Everyone Wants A Better Future For Their Children

    Everyone Wants A Better Future For Their Children The opportunities the mine provides are known and appreciated… …and there is always the hope that more can be provided Strong community relations are the foundation for a harmonious relation with the regulators  We are creating an external stakehold

  17. Slide 17: Broadly Owned By Skilled Institutional Investors

    Broadly Owned By Skilled Institutional Investors Institutional investors with deep understanding of the industry… …believe in the asset, the management team and the Board Institution(1) Shares (MM) % Corporate Data(2) Cash, including restricted Blackrock 10.6 12.4 cash (Q1/19) $118.5 million Debt, p

  18. Slide 18: A Board With Strong Strategic And Governance Experience

    A Board With Strong Strategic And Governance Experience Deep experience gained as industry professionals… …complemented by extensive Board level experience • TERRY MACGIBBON PGeo, ICD.D • DAVID FENNELL LLB Board Chair 30 years experience as a director and senior executive with 45 years of mining ind

  19. Slide 19: A Beautiful Asset And A Tested Management Team

    A Beautiful Asset And A Tested Management Team Proven ability to navigate the technical, commercial,… …& social complexities of challenging mining operations • FRED STANFORD PEng • ANNE STEPHEN CEO V.P. Human Resources 35 years of experience, primarily in operations at 30 years of experience as an H

  20. Slide 20: Mining In El Limón Pit, Trucking Ore To The RopeCon

    Mining In El Limón Pit, Trucking Ore To The RopeCon 20

  21. Slide 21: Panoramic View Of The Processing Plant And RopeCon From The El Limón Pit

    Panoramic View Of The Processing Plant And RopeCon From The El Limón Pit 21

  22. Slide 22: Filtered Tailings Storage Facility

    Filtered Tailings Storage Facility 22

  23. Slide 23: Health And Safety - Equipment, Training, Start Of Shift Safety Reviews, Security

    Health And Safety - Equipment, Training, Start Of Shift Safety Reviews, Security 23

  24. Slide 24: Community Outreach Programs

    Community Outreach Programs 24

  25. Slide 25: Addendum

    TSX: TXG Addendum 25

  26. Slide 26: El Limón Guajes Open Pit Mineral Resource Statement Effective As Of December 31, 2018

    El Limón Guajes Open Pit Mineral Resource Statement Effective As Of December 31, 2018 Tonnes Au Grade Ag Grade Contained Au Contained Ag Resource Class (Mt) (g/t) (g/t) (Moz) (Moz) El Limón (including El Limón Sur) Measured 4.80 3.29 4.68 0.51 0.72 Indicated 20.20 2.67 4.29 1.73 2.79 Measured & Indi

  27. Slide 27: El Limón Guajes Open Pit Mineral Reserve Statement Effective As Of December 31, 2018

    El Limón Guajes Open Pit Mineral Reserve Statement Effective As Of December 31, 2018 Tonnes Au Grade Ag Grade Contained Au Contained Ag Reserve Category (Mt) (g/t) (g/t) (Moz) (Moz) El Limón (including El Limón Sur) - Note 3 Proven 3.80 3.48 4.20 0.43 0.51 Probable 11.24 3.05 3.69 1.10 1.33 Sub-tota

  28. Slide 28: Sub-Sill Underground Mineral Resource Statement Effective As Of December 31, 2018

    Sub-Sill Underground Mineral Resource Statement Effective As Of December 31, 2018 Tonnes Au Grade Ag Grade Contained Au Contained Ag Resource Class (Mt) (g/t) (g/t) (Moz) (Moz) Sub-Sill Measured 0.06 10.14 10.35 0.02 0.02 Indicated 1.11 6.87 11.74 0.24 0.42 Measured & Indicated 1.17 7.04 11.67 0.26

  29. Slide 29: Sub-Sill Underground Mineral Reserve Statement Effective As Of December 31, 2018

    Sub-Sill Underground Mineral Reserve Statement Effective As Of December 31, 2018 Tonnes Au Grade Ag Grade Cu Grade Contained Au Contained Ag Reserve Category (Mt) (g/t) (g/t) (%) (Moz) (Moz) Sub-Sill Proven 0.04 7.48 8.18 0.29 0.01 0.01 Probable 0.62 6.91 11.42 0.61 0.14 0.23 Total Proven & Probable

  30. Slide 30: Media Luna Deposit Inferred Mineral Resource Estimate @ 2.0 g/t Au Eq. Cut-off Grade

    Media Luna Deposit Inferred Mineral Resource Estimate @ 2.0 g/t Au Eq. Cut-off Grade (Effective As Of June 23, 2015) Deposit Resource Tonnes Gold Eq. Contained Gold Contained Silver Contained Copper Contained Category (Mt) Grade Gold Eq. Grade Gold Grade Silver Grade Copper g/t (Moz) (g/t) (Moz) g/t

  31. Slide 31: ELG Complex Life Of Mine Plan (September 2018 Technical Report)

    ELG Complex Life Of Mine Plan (September 2018 Technical Report) 1) Cash Flow in 2018 includes Financing proceeds of $48m. Revenue adjusted to actual price for H1 2) Metal Prices used $1,200/oz Au, $17.00/oz Ag, $3.00/lb Cu, USD:MXN 1:18, Reserves as of March 31, 2018 3) Lowest quartile producer per

  32. Slide 32: Media Luna Conventional PEA (September 2018 Technical Report)

    Media Luna Conventional PEA (September 2018 Technical Report) 1) Metal Prices used $1,200/oz Au, $17.00/oz Ag, $3.00/lb Cu, USD:MXN 1:18 2) A preliminary economic assessment should not be considered a prefeasibility study or feasibility study, as the economics and technical viability of the Media Lu

  33. Slide 33: For further information: Dan Rollins, Vice President, Corporate Development & Investor Relations

    For further information: Dan Rollins, Vice President, Corporate Development & Investor Relations 33 Email: dan.rollins@torexgold.com Direct: (647) 260-1503 Website: www.torexgold.com

Torex Gold Resources — Investor Presentation (June 2019) on 6ix