    O) SALIENT FEATURES BUILT 25 a | ENVIRONS ™oolmans’

  4. Slide 4: Results Summary

    Results Summary Significant losses on two large projects awarded prior to COVID. Project portfolio post risk mitigants performing well. Revenue A$2.6 billion Operating loss (A$60.4 million) (R31.0 billion) before capital (R693 million) 30 June 2024 | A$3.1 billion (R37.5 billion) 30 June 2024 | A$34

  5. Slide 5: Executive summary

    Executive summary CEO’s report for the year ended 30 June 2025 Infrastructure ‒ Australia and Southeast Asia underperformance associated with 2 projects. J108 and Kidston suffered a combined loss of A$98.5 million. ‒ New Zealand continuing consistent operational excellence exceeding performance targ

  6. Slide 6: Specific projects overview

    Specific projects overview Kidston Pumped Storage Hydro Operational performance ‒ Progress impacted by a persistent tropical low-pressure system resulting in severe regional flooding. Full demobilisation from the site required. Returned to full operating capacity 10 weeks later. ‒ Productivity sever

  7. Slide 7: Award recognition

    Award recognition Three projects shortlisted as finalists for prestigious Australian Construction Achievement Award (ACAA) Winner: New Bridgewater Bridge in Tasmania (top). ‒ Third McConnell Dowell win in the last nine-year period: ‒ Webb Dock (2017) ‒ Chith Export Facility (2019) ‒ Highlights the c

  8. Slide 8: Segment overview – Infrastructure

    Segment overview – Infrastructure Portfolio excluding J108 and Kidston operating at improved margin A$m 2025 2024 72% Revenue 1 900.4 2 417.1 of Group Revenue Operating (loss) / earnings (45.7)1 57.4 Australia Operating margin (2.5%)2 2.4% ‒ Non-margin contributing projects awarded pre-COVID progres

  9. Slide 9: Segment overview – Building

    Segment overview – Building 100% of projects profitable with 91% of projects above tender margin A$m 2025 2024 19% Revenue 491.1 419.1 of Group Revenue Operating earnings 17.0 8.6 Overall Operating margin 3.5% 2.1% ‒ 21 active projects contributing increased revenue on prior year. ‒ Operating earnin

  10. Slide 10: Segment overview – Mining

    Segment overview – Mining Gamsberg performing well. Problematic issues to resolve on Tshipi. A$m 2025 2024 9% Revenue 252.6 268.8 of Group Revenue Operating earnings 0.2 2.0 Gamsberg Operating margin 0.1% 0.7% ‒ Production, profitability and cashflow in line with expectations. ‒ Steadily increasing

  11. Slide 11: Financial Results

    coy oe FINANCIAL RESULTS

  12. Slide 12: New Bridgewater Bridge

    NEW BRIDGEWATER BRIDGE MCCONNELL DOWELL TASMANIA, AUSTRALIA

  13. Slide 13: New Bridgewater Bridge

    NEW BRIDGEWATER BRIDGE

  14. Slide 14: 2025 Salient results

    2025 Salient results A$m 2025 2024 Revenue 2 629.9 3 055.3 ‒ Revenue lower than prior period following decreased activities in Infrastructure segment in line with expectations. Change1 (13.9%) ‒ Operating loss before capital items2 (EBIT) significantly lower than prior year due to losses reported on

  15. Slide 15: Financial performance

    Financial performance 2025 2024 Change 1 Commentary A$m Continuing Operations Continuing Operations Revenue 2,629.9 3,055.4 (13.9%) Revenue decreased across all segments, except Building segment, by a combined 13.9% to A$2.6 billion. Under performing projects represent a Gross earnings 79.3 175.5 (5

  16. Slide 16: Segmental results

    Segmental results Segmental report for the year ended 30 June 2025 Aveng Aveng Corporate Infrastructure Building Mining Total Legacy and eliminations A$m Revenue 1,900.4 491.1 252.6 0.3 (14.4) 2,629.9 Gross earnings 41.8 30.0 13.0 (5.6) - 79.3 Gross margin % 2.2% 6.1% 5.1% (>100%) - 3.0% Operating (

  17. Slide 17: Financial position

    Financial position Statement of financial position as at 2025 2024 Change A$m Non-current assets 385.4 445.4 (60.0) Current assets 653.6 817.3 (163.7) Total assets 1,038.9 1,262.7 (223.8) Foreign currency translation reserve (950.7) (951.5) 0.8 Retained earnings 593.8 686.3 (92.5) Other 553.4 547.2

  18. Slide 18: Financial position

    Financial position Movements in Property, plant & equipment and Right-of-use Assets (A$m) 53.4 294.2 10.0 272.7 (63.2) (9.8) ‒ Additions represent investment in replacement mining equipment in (10.9) Mining segment and replacement PPE & ROU equipment in Infrastructure segment. ‒ Effective annualised

  19. Slide 19: Financial position

    Financial position Movements in working capital (100.9) (3.5) (8.5) 123.6 (202.0) (183.9) (28.8) Balance Inventories Trade & other Contract Contract Trade & Balance 30 June receivables assets liabilities other 30 June 2024 payables 2025 ‒ Minimal net movement in inventories and trade & other receiva

  20. Slide 20: Liquidity

    Liquidity Movement in cash (A$m) 6.7 8.1 49.2 98.5 (9.0) (9.5) 267.3 (28.1) 227.7 (27.9) (46.2) (0.2) (2.0) Cash balance Cash from Working capital Net finance Taxation Proceeds from Proceeds from Capital Net repayment Net payment of New external Other Cash balance 30 June 2024 operations change char

  21. Slide 21: Market Outlook

    OS MARKET OUTLOOK paeCONN EL moolmans””

  22. Slide 22: Punt Road Oval Redevelopment

    PUNT ROAD OVAL REDEVELOPMENT BUILT ENVIRONS VICTORIA, AUSTRALIA ae ry a tn Ms ii) ML

  23. Slide 23: Market outlook

    Market outlook Segment strategies aligned with market trends Infrastructure Building Mining ‒ Australia – Ongoing re-prioritisation of public ‒ Australia - Markets remain strong with ‒ Mining environment continues to be impacted sector investment away from major transport, and government spend in he

  24. Slide 24: Strategic Review

    O4 STRATEGIC REVIEW

  25. Slide 25: The Queen Elizabeth Hospital Stage 3 Redevelopment

    & . 9 1 pals THE QUEEN ELIZABETH HOSPITAL STAGE 3 REDEVELOPMENT BUILT ENVIRONS SOUTH AUSTRALIA

  26. Slide 26: Strategy update

    Strategy update Enhancing stakeholder value and maximising value to shareholders Intention ‒ Improved operational performance and the creation of two separate entities. Moolmans ‒ Continue excellent delivery and operational performance on Gamsberg. ‒ Resolve problematic issues (work environment and

  27. Slide 27: Key Messages

    O's KEY MESSAGES SENWECONETROTTON? — CREATUECSTIVETION

  28. Slide 28: Key messages

    Key messages Focus areas Infrastructure ‒ Complete the J108 and Kidston projects in accordance with current plan and finalise commercial matters with the respective clients. ‒ Continue to improve performance on the remainder portfolio of projects and secure new work. Building ‒ Maintain positive tra

  29. Slide 29: Appendices

    OO APPENDICES

  30. Slide 30: Appendices | Comprehensive earnings

    Appendices | Comprehensive earnings 2025 2024 Change1 Continuing operations Revenue 30 987 37 450 (17.2%) Gross earnings 951 2 151 (52.5%) Gross margin % 3.0% 5.7% (2.7%) EBITDA 50 1 281 (>100%) Depreciation & amortisation (744) (857) (13.2%) Operating (loss) / earnings before capital items (693) 42

  31. Slide 31: Appendices | Financial position

    Appendices | Financial position Statement of financial position as at 2025 2024 Change Rm Non-current assets 4 499 5 427 (928) Current assets 7 615 9 954 (2 269) Total assets 12 114 15 381 (3 267) Share capital 4 818 4 801 17 Accumulated losses (4 055) (2 989) (1 066) Other 1 531 1 627 (96) Total eq

  32. Slide 32: Questions & Thank You

    QUESTION Sey & THANK YOU f

  33. Slide 33: Disclaimer

    Disclaimer Aveng Limited or Aveng Group does not make any representation or warranty, express or implied, as to the accuracy, completeness, adequacy or reliability of any statements, opinions, estimates or other information contained in this document (any of which may change without notice). To the