Magnum Hunter Resources Corp

Magnum Hunter Resources — Investor Presentation (May 2012)

8 slides from Magnum Hunter Resources's investor presentation, May 7, 2012

  1. Slide 1: Key Investment Highlights

    Key Investment Highlights Large, Diversified Asset Base in Highest Return Resource Plays Large, contiguous operations in three of the highest return resource plays in the U.S. Diversification and acreage in each core area provides investment flexibility 59.3 MMBoe of proved reserves (59% oil / liqui

  2. Slide 2: Williston Basin Comparative Economics

    Bakken Results (*) Williston Basin Comparative Economics 25% 40% 37% 22% 25% 54% 27% 43% 44% 43% 37% $2.2 $8.0 $8.8 $9.6 $1.7 $ 7.0 $8.0 $6.9 $10.5 $3.4 $1.7 KOG MHR (North Dakota) MHR (Tableland) CLR DNR GEOI PXD CXO LPI MHR GEOI (1) (2) (3) (4) (7) (8) (9) (5) (10) (11) (6) Lower drilling and comp

  3. Slide 3: Economic Sensitivity of Eagle Ford – Gonzales County

    24 $0.0 $1.0 $2.0 $3.0 $4.0 $5.0 $6.0 $7.0 $8.0 $9.0 $10.0 $11.0 $85.00 $90.00 $95.00 $100.00 $105.00 $110.00 $115.00 Economic Sensitivity of Eagle Ford – Gonzales County IRR: 38% IRR: 51% IRR: 63% IRR: 44% IRR: 54% IRR: 85% IRR: 97% CAPEX: $8.5MM + $0.3MM (ESP) + $.02MM PU IP-24 Hour: 1,250 Bbl/D E

  4. Slide 4: Financial Strategy

    34 Financial Strategy Financial Strategy Capital spending driven by rates of return across all operating areas • Capital budget adjusted in Q2 2012 to focus on high return, oil / liquids areas • Margins and EBITDAX projected to increase by year-end 2012 based on capital plan • Limited overhead expan

  5. Slide 5: Operating and Credit Statistics

    36 Operating and Credit Statistics Operating and Credit Statistics 2011 Q1 2012 Q4 2012E ($ in millions, except per unit data) Actual Pro Forma Production: Average Daily Production (1) 5,510 13,700 ~17,000 % oil / liquids (1) 43% 40% 65% % change vs. PF Q1 2012 24% 2012E Exit Rate ~18,000 Illustrati

  6. Slide 6: Strong Pro Forma Collateral Coverage

    37 Strong Pro Forma Collateral Coverage $517 $517 $441 $797 $441 $299 $1,305 $991 3/31/12 1P PV-10% (NYMEX) Enterprise Value Total NAV (based on undeveloped acreage) $1,789 $958 $2,562 Coverage Proved Undeveloped Proved Developed 2.3x 6.1x 4.3x Residual Eureka Hunter Value (2) Total Undeveloped Acre

  7. Slide 7: Footnotes

    54 Page 2 • (1) Management guidance for 2012 exit production oil / liquids mix. Page 3 • (1) Based on approximately 35 million shares at 5/2/2012 closing price. Page 7 • (1) 184 Bbl/d is frac’d waiting on drill out and equipping, and approximately 177 Bbl/d is behind pipe or drilling. Page 9 • (1) I

  8. Slide 8: Footnotes

    55 Page 35 • (1) Excludes $0.786 million of cash held by and only available to Eureka Hunter. • (2) Includes unrestricted subsidiaries notes payable. • (3) Excludes Eureka Hunter’s $46.0 million second lien term loan. • (4) Excludes Eureka Hunter’s $58.1 million preferred stock. • (5) Adjustment for

Magnum Hunter Resources — Investor Presentation (May 2012) on 6ix