Roxgold — Investor Presentation (August 2017)
32 slides from Roxgold's investor presentation, August 2017
Slide 1: Mining High Grade Gold in Burkina Faso
Mining High Grade Gold in Burkina Faso TSX: ROXG Investor Presentation | August 2017 TSX: ROXG 1
Slide 2: Cautionary Statement
Cautionary Statement This presentation contains forward-looking information. Forward looking information contained in this presentation includes, but is not limited to, statements with respect to: (i) the estimation of measured, inferred and indicated mineral resources and probable mineral reserves
Slide 3: Roxgold Snapshot
Roxgold Snapshot Canadian Based Gold Producer ▪ Experienced Management Team and Board Mauritania Mali ▪ Proven Track Record of Meeting or Exceeding Expectations Niger ▪ May 16, 2016: Poured First Gold at Senegal Yaramoko Project in Burkina Faso Yaramoko Gambia Burkina o Low cost, high grade undergro
Slide 4: Yaramoko – Continuing to Rapidly Evolve
Yaramoko – Continuing to Rapidly Evolve Production ▪ 105,000 – 115,000 ounces production in 2017 ▪ Well on track with YTD results February 2011 ▪ 27,970 ounces produced in Q2 Initial Discovery ▪ AISC guidance of $740 - $790 per ounce ▪ Development well ahead of budget to underpin balance of August 2
Slide 5: Yaramoko: From 1st Pour to ~141,000 ounces
Yaramoko From 1st Pour to ~141,000 ounces May 2016 Jun 2016 July 2016 Aug 2016 Sep 2016 Oct 2016 December Nov 20162015 ▪ First gold pour ▪ Completed ▪ Received $9M ▪ Achieved ▪ First double level ▪ Declared ▪ Intersected construction $4M from IFC early 1,000,000 hours stope successfully Commercial 2
Slide 6: 2017 First & Second Quarter Operational Highlights
2017 First & Second Quarter Operational Highlights Ore Development (m) Waste Development (m) 1,200 1,200 Q1 Q2 YTD 1,000 1,000 800 800 Waste Development (metres) 912 939 1,851 600 600 Ore Mined (tonnes) 69,237 66,044 135,281 400 400 200 200 Milled (tonnes) 63,955 65,159 129,114 - - 16/Q3 16/Q4 17/Q1
Slide 7: Financial information 2017 First Half
Financial information 2017 First Half All dollar amounts in 000s except per share amounts and where otherwise noted 2017 2017 Q1 Q2 Cash operating cost1 Cash balance Gold Poured (ounces) 35,594 27,970 $445/oz produced (unaudited) at All-In Sustaining Cost1 June 30, 2017 Revenue1 $42,977 $36,166 $789
Slide 8: Tracking to 2017 Production Guidance
Tracking to 2017 Production Guidance….. (oz Au) 115,000 Upper end of guidance 105,000 Lower end of guidance 63,564 35,594 27,970 TSX: ROXG 8
Slide 9: And Cost Estimates
….And Cost Estimates 2017 Cost Estimates ▪ Guidance maintained for full year for Cash Operating Cost1 and AISC1 ▪ Significant investment in underground development Cash Operating Cost All-in Sustaining Cost guidance range guidance range $445 $490 $740 $790 $445 actual at Q2 $789 actual at Q2 $790 1.
Slide 10: 55 Zone Developed Reserves
55 Zone Developed Reserves1 $44 $740 $790 $445 $490 $740 $790 Block Remain % Devt Developed 2017 H2 2018 2019 Total 1 53,000 100% 53,000 29,200 22,100 1,700 53,000 2 74,000 100% 74,000 20,500 28,500 25,000 74,000 3 72,700 71% 51,600 6,900 17,700 27,000 51,600 4 69,000 2% 1,400 1,400 1,400 180,000 56
Slide 11: Bagassi South – Project Summary
Bagassi South – Project Summary1 Yaramoko ▪ Roxgold’s first growth project WSF ▪ 1.8km south of Zone 55 and plant TSF ▪ Indicated resource of 188,000 oz at 16.6 g/t Au Plant Camp ▪ Inferred resource of 69,000 oz at 16.6 g/t Au Zone 55 ▪ Nominal production of 350 tpd with a 5-year mine life. Deliveri
Slide 12: Bagassi South
Bagassi South Pre-production Capital 2017 Q2: Infill Drilling Program Complete $ Millions Hydrology & Geotechnical Studies Commence Permitting in Burkina Faso Mine Development 8.1 Commence Camp Expansion Mine Equipment 0.5 2017 Q3 Resource Update Plant Expansion 7.4 2017 Mine Planning/Optimization &
Slide 13: Yaramoko – QV1 Drilling 2017
Yaramoko – QV1 Drilling 20171 East West ▪ Considerable growth 254 252 potential at Bagassi 228 239 233 245 243 246 YRM-17-DD-BGS-233 South 255 230 231 160 71.7 g/t over 3.4 m 241 208 158 161 136 248 166 163 ▪ New targets recently 206 124 123 126 205 249 139 251 identified currently 172 226 being dri
Slide 14: Potential Production Outlook
Potential Production Outlook1 Zone 55 Reserves 150 100 50 0 2017 2018 2019 2020 2021 2022 2023 Zone 55 Potential Plant Feed 100 50 0 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 Bagassi South Potential Plant Feed 75 50 25 0 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 TSX: ROXG 1
Slide 15: Zone 55 Planned Drilling Q2/Q3 2017
Zone 55 Planned Drilling Q2/Q3 20171 17-P1 DD-242 5,200RL 17-P2 DD-250 DD-426 5,000RL 17-P3 DD-428 17-P9 YRM-16-DD-426 20.1 g/t over 23.8 m 17-P8 4,800RL 17-P4 17-P6 YRM-12-DD-242 22.7 g/t over 4.1 m 17-P7 YRM-12-DD-250 17-P5 4,600RL 24.3 g/t over 4.4 m YRM-12-DD-428 6.0 g/t over 2.1 m Drill Hole 4,
Slide 16: Regional Geological Overview
Regional Geological Overview Siou 10 Km ▪ Large regional land package of approximately 230 km2, located on the Hounde Belt Niankongo ▪ Majority of known anomalies Boni Shear North and deposits are located along Yaramoko the Boni Shear regional break Boni Shear Central and the second order Yaramoko S
Slide 17: Yaramoko – Ground Geophysical Surveys 2017
Yaramoko – Ground Geophysical Surveys 2017 55 Zone ▪ Production of approximately 141k ounces at 55 Zone *From May 2016 to June 30th, 2017 Boni Haho QV1 Extension ▪ Zone 55 Resource: Ridge Line M&I: 738k ounces at 17.1 g/t Inf: 347k ounces at 16.1 g/t *As of December 31st, 2016 (See press Bagassi rel
Slide 18: Yaramoko – Ground Geophysical Surveys 2017
Yaramoko – Ground Geophysical Surveys 2017 Niankongo Boni Shear Central Niankongo East ▪ Larger tonnage shear hosted targets ▪ More traditional deposit Boni targets in West African Haho greenstones Boni Shear Contact ▪ Phase 1 drilling program of 10,000m on the Boni Bagassi Houko Shear IP grid sched
Slide 19: Upcoming Catalysts
Upcoming Catalysts Q3 2017 ▪ Results of Zone 55 deep drilling program. Follow up drilling program of 10,000 meter below drill holes YRM-16DD-426 & 428 commenced in Q2 ▪ Initial drill testing of QV1 Extension 2017 ▪ Regional Targets including Ridgeline and Boni Shear Central and Contact Zones Q4 2017
Slide 20: Thank You
Thank You John Dorward President & CEO 360 Bay Street, Suite 500 Toronto, ON M5H 2V6 jdorward@roxgold.com www.roxgold.com 416 203 6401 20
Slide 21: Management Team
Management Team John Dorward Paul Criddle Natacha Garoute COO CFO President & CEO 18+ years 20 years 20 years operating & project mining finance development & operating development experience experience mines experience Former Roles: Former Roles: Former Roles: ▪ COO Azimuth ▪ Corporate Controller ▪
Slide 22: Finance Summary
Finance Summary Insiders Yaramoko Debt Facility & Mgmt Retail 5.1% 6.2% 18.1% ▪ Debt Facility of $60 Million ▪ Interest rate of LIBOR plus 3.75% 6.5% ▪ Hedging component of 65,000 ounces of gold over the 5 year life of the loan @US$ 1,052/oz ▪ Project remains unencumbered by third party 7.9% streams
Slide 23: Corporate Information
Corporate Information Covering Sell-Side Firm Analyst Capital Structure (as at June 30, 2017) BMO Andrew Breichmanas Listings TSX:ROXG Canaccord Rahul Paul NASDAQ INT:ROGFF Cormark Tyron Breytenbach Cash US$50 million Echelon Wealth Partners Ryan Walker Common Shares Outstanding 371.4M GMP Oliver Tu
Slide 24: 2017 Mineral Resource Statement 55 Zone
2017 Mineral Resource Statement 55 Zone1 55 Zone Mineral Resource Statement - Yaramoko Mine - December 31st, 2016 31-Dec-16 31-Dec-16 31-Dec-16 31-Dec-15 Measured and Indicated Mineral Measured and Indicated Mineral Measured Mineral Resources Indicated Mineral Resources Resources Resources tonnes gr
Slide 25: 2017 Mineral Resource Statement Bagassi South
2017 Mineral Resource Statement Bagassi South1 Bagassi South Mineral Resource Statement - Yaramoko Mine - July 19th, 2017 19-Jul-17 19-Jul-17 19-Jul-17 31-Dec-16 Measured and Indicated Mineral Measured and Indicated Mineral Measured Mineral Resources Indicated Mineral Resources Resources Resources t
Slide 26: 2016 Proven and Probable Reserves
2016 Proven and Probable Reserves1 As of December 31, 2016 As of December 31, 2016 As of December 31, 2016 Estimated as of 2014 Proven Probable Proven and Probable Proven and Probable Mineral Mineral Reserves Mineral Reserves Mineral Reserves Reserves tonnes grade ounces tonnes grade ounces tonnes g
Slide 27: Zone 55 Life of Mine Design
Zone 55 Life of Mine Design LOM Plan April 2017 Mined Out 2016 ▪ Resource model Mar 2017 5168 L ▪ Proven & Probable 5066 DD Drive reserve updated to DD Drives & 4556L (760m) Inferred material to DD Drives & Vent Intakes Vent Intakes ▪ 4267L (1050m) Single Decline, ▪ Prod. Rate 750 tpd SingleExhaust
Slide 28: 2016 Financial Performance
2016 Financial Performance Pre-commercial Commercial production Four production Three TOTAL months ended months ended seven months September 30, December 31, ended December 20161 2016 31, 2016 Operating Data Ore mined (tonnes) 61,040 72,561 133,601 Ore processed (tonnes) 82,590 61,265 143,855 Head g
Slide 29: Mineral Resource, Reserve and Potential Plant Feed Notes
Mineral Resource Notes: (1) Mineral Resources are reported compliance with National Instrument 43-101 (“NI 43-101”) with an effective date of December 31st, 2016. (2) Underground Mineral Resources are reported at gold grade cut-off of 5.0 g/t Au, based on a gold price of US$1,250/ounce. (3) The iden
Slide 30: Bagassi South Mineral Resource Estimate Notes
Bagassi South Mineral Resource Estimate Notes: Notes: (1) Bagassi South Mineral Resources are reported in compliance with National Instrument 43-101 (“NI 43-101”) with an effective date of July 19th, 2017. (2) Underground Mineral Resources are reported at gold grade cut-off of 5.0 g/t Au, based on a
Slide 31: Notes
Notes: 1. Cash operating cost per ounce produced, total cash cost per ounce sold and all-in sustaining cost per ounce sold are non-IFRS measures with no standard definition under IFRS. See Note 16 the “Non-IFRS financial performance measures” of the Company’s Management Discussion and Analysis (“MD&
Slide 32: Kelley Stamm, Investor Relations
Kelley Stamm Investor Relations & Communications Manager 360 Bay Street, Suite 500 Toronto, ON M5H 2V6 kstamm@roxgold.com www.roxgold.com 416 203 6401 32