Pacific Booker Minerals Inc. · TSXV:BKM
Pacific Booker Minerals — Fact Sheet (February 2015)
1 slide from Pacific Booker Minerals's fact sheet, Feb 22, 2015
Slide 1: Feasibility Study Results, Project Description and Corporate
Feasibility Study Results Project Location Ore production rate of 30,000 tonnes/day Mineable reserve (proven/probable) is 224.25 Mt with an Energy Efficient average grade of 0.330% Cu, 0.163 g/t Au and 0.004% Mo HPGR as a replacement for the Proven: 115.12 Mt with an average grade of 0.3