Terramin Australia Limited · ASX:TZN
Terramin Australia — Investor Presentation (September 2009)
28 slides from Terramin Australia's investor presentation, Sep 3, 2009
Slide 1: Leveraged to zinc – Australian Roadshow September 2009
TERRAMIN AUSTRALIA LIMITED For personal use only Leveraged to zinc Australian Roadshow September 2009
Slide 2: Important information
Important information For personal use only The information in this presentation is designed as an aid to a spoken explanation. It is not to be considered without that explanation. It is not intended to guide any investment decisions in Terramin Australia Ltd. The information is intended as a guide
Slide 3: Terramin strategy
Terramin strategy For personal use only Finding and developing base metal mines in close proximity to infrastructure and with low capital and operating costs To grow the company by building on existing portfolio through focused exploration aggressively seeking to acquire base metal proje
Slide 4: Leveraged to zinc – asset positioning
Leveraged to zinc – asset positioning For personal use only The Company is a low cost producer and has and a world class project in final feasibility; Angas Zinc Mine - South Australia (100%) In production – C1 cash cost US34 cents expansion to accelerate cash flow Oued Amizour Project – Alg
Slide 5: Why zinc?
Why zinc? For personal use only Mine closures and production cuts 1.1 Mt zinc metal reduction in 2009 (10% of world supply) [ILZSG] Many proposed projects unlikely to proceed high capital and operating cost, difficult locations Lack of investment in exploration and development delays any
Slide 6: Why zinc? China demand
Why zinc? For personal use only China China's share of global demand - monthly to -galvanising 50% M arch 2009 demand is 45% Base metals (average) growing by 40% Steel 15–20% % of total world use 35% 30% -galvanised steel 25% is 50% of new zinc 20% consumption in China 15% 10% -steel nearly 50% 5% 2
Slide 7: 2009 Zn Cost Curve, C1
2009 Zn Cost Curve, C1 Section Header (used to create Tab Pages and Table of Contents) For personal use only 2009 ZINC INDUSTRY COST DATA: FLEXED DATA 90 Tala Hamza 80 70 Angas C1 Cash Cost (c/lb Zn) 60 50 40 30 20 10 0 0 2000 4000 6000 8000 10000 12000 14000 16000 Cumulative Production (Paid Mlbs Z
Slide 8: Company fast facts
Company fast facts For personal use only Public company - ASX listed No of Shareholders 4,200 Shares on issue 139 million Convertible/redeemable Notes USD30.5 M and AUD5.0 M [ USD notes 5 year term convertible at market ] Market Capitalisation (at share price of $0.71) ~AUD100M Turnover (daily avera
Slide 9: Building on a year of progress
Building on a year of progress For personal use only Angas mine completes first year of production production on forecast debt restructured optimisation initiatives implemented EBITDA forecast $54m over next two years the next step? - production expansion to accelerate cash flow Tala Ham
Slide 10: Angas Mine
Angas Mine For personal use only 60 km from Adelaide Australia’s first mining belt (c1845) Company tenements total 1,160km2 Angas: new discovery 1991 Mining Lease grant August 2006 MARP approved March 2007 construction from June 2007 Production from August 2008 Fast effective path
Slide 11: Angas – low operating cost attributes
Angas – low operating cost attributes For personal use only shallow virgin ore body grid power- low fixed price coarse grind no fly-in fly-out precious metals credit local equipment support services TERRAMIN AUSTRALIA LIMITED SLIDE No. 11
Slide 12: Angas C1 cash cost
Angas C1 cash cost For personal use only 80 June 2009 quarter C1 Cash Cost before bi-product credits US71 c/lb Basis 70 zinc treatment charge US 60 21 50 cents/lb and lead 37 credit at US83 cents/lb US cents/lb 50 9 Current prices 40 5 zinc US 84 cents/lb 30 lead US 95 cents/lb 15 C1 Cash Cost a
Slide 13: Throughput expansion option
Throughput expansion option For personal use only Expand process plant to 500,000 tonnes pa -$3.6M - SAG mill VS drive, additional cyclones, upgrade pumps, flotation capacity, two extra lead filter leafs - crushing/conveying/thickening/tailings storage/concentrate out loading – no expenditure Un
Slide 14: Resource upside
Resource upside For personal use only Go od po te Good potential for nt new shoots ial fo r ne w sh oo ts TERRAMIN AUSTRALIA LIMITED SLIDE No. 14
Slide 15: Angas regional potential
Angas regional potential For personal use only Focus currently around Angas 20 identified regional targets Process plant design not capacity constrained Targeting incremental feed Gold potential being reviewed TERRAMIN AUSTRALIA LIMITED SLIDE No. 15
Slide 16: Oued Amizour Project
Oued Amizour Project For personal use only Located near Bejaia in northern Algeria - 250 km east of Algiers Positioned at the doorstep of Europe’s smelters Perfect location and infrastructure Algeria is major energy supplier to Europe TERRAMIN AUSTRALIA LIMITED SLIDE No. 16
Slide 17: Oued Amizour Project - Ownership
Oued Amizour Project - Ownership For personal use only Exploration Permit 5225PE 100% owned by Western Mediterranean Zinc (WMZ) incorporated private Algerian company WMZ Ownership: 65.0% Terramin Australia Limited (TZN) 32.5% ENOF (Algerian Govt. company) 2.5% ORGM (Algerian Govt. company) Alg
Slide 18: Project summary so far
Project summary so far For personal use only Terramin interest acquired in 2006 ORGM non-JORC “reserve” 30Mt @ 6.9% Pb+Zn WMZ major infill and feasibility drilling programme through 2007 to December 2008 additional 58 diamond drill holes (up to four rigs) Scoping study completed in Februar
Slide 19: For personal use only
For personal use only TERRAMIN AUSTRALIA LIMITED SLIDE No. 19
Slide 20: Oued Amizour - project merits
Oued Amizour - mérites de projet ? “Pas de problème!” For personal use only wide mineralised intersections diesel – 18c / litre with large high grade intervals water – mine lease bores process power – reliable low cost 3-4c/kWhr major port and international airport (10kms) TERRAMIN AUSTRAL
Slide 21: Pre-feasibility study
Pre-feasibility study For personal use only Bateman Engineers/Golder Associates/Terramin Most elements at feasibility standard (±15%) Study assumes conventional crush-SAG mill-flotation bulk mining using low cost SLC or Block caving access via twin declines for production and ventilation
Slide 22: Pre-feasibility outcomes
Pre-feasibility outcomes For personal use only Capital cost USD 266 million: 2 Mtpa throughput Production per annum average 210kt zinc concentrate (54% Zn grade at 90% recovery) 40kt lead in concentrate (60% Pb grade at 72% recovery) Highly marketable product (low Fe and Si) Life of Mine
Slide 23: Going forward
Going forward For personal use only Proceeding to Feasibility further geotechnical and hydrogeological drilling finalisation of portal and decline design optimisation of mine plan and 4-5 Mtpa production options continuing assessment of block cave option finalisation of EIS application
Slide 24: Value add propositions
Value add propositions For personal use only Block cave opportunity for higher tonnage/lower unit cost look at increasing production to 3-4Mtpa Underground crushing and conveying increased production reduced ventilation requirements Early start to declines bring forward mine commence
Slide 25: Additional Reserves?
Additional Reserves? For personal use only Resources Indicated Potential for 24.8Mt at 1.8% Pb additional reserves and 6.5% Zn Inferred 33.8Mt at 0.9% Pb and 4.3% Zn Potential for additional at 2.5% ZnEq cut-off resources TH044 68m @ 10.5% PbZn TERRAMIN AUSTRALIA LIMITED SLIDE No. 25
Slide 26: And the bigger picture
And the bigger picture For personal use only 4,064,000 mN TALA HAMZA 5225PE TERAMIENuusR AUSTRLI MTEDinTcl 4,062,000 mN +5% 2.5 to 5.0% 1.0 to 2.5% 0.0 to 1.0% Target not reached 4,060,000 mN 0 250 500 1,000 metres TERRAMIN AUSTRALIA LIMITED SLIDE No. 26 674,00
Slide 27: Summary and in perspective
Summary and in perspective For personal use only Low cost mine at Angas for expanding near term cash flow Develop Tala Hamza as a major low-cost Pb-Zn producer Management team with proven capability Board with major project oversight and delivery experience Growing a large global producer wi
Slide 28: Company contacts
Company contacts For personal use only Kevin Moriarty +61 8 8213 1415 Executive Chairman Colin Jackson +61 8 8213 1405 Corporate + 61 400 892 612 Level 22, Westpac House 91 King William Street Adelaide, South Australia 5000 (t) +61 8 8213 1415 (f) +61 8 8213 1416 TERRAMIN AUSTRALIA LIMITED SLIDE No.
Terramin Australia — Investor Presentation (September 2009) on 6ix