Kinross Gold Corporation · TSX:K

Kinross Gold — 24th Annual CIBC Western Institutional Investor Conference (January 2021)

97 slides from Kinross Gold's conference presentation, Jan 20, 2021

  1. Slide 1: Delivering Value.

    January 2021 Delivering Value. Kinross Gold Corporation

  2. Slide 2: Cautionary Statement on Forward-Looking Information

    January 2021 Cautionary Statement on Forward-Looking Information All statements, other than statements of historical fact, contained or incorporated by reference in or made in giving this presentation and responses to questions, including but not limited to any information as to the future performan

  3. Slide 3: Cautionary Statement on Forward-Looking Information

    January 2021 Cautionary Statement on Forward-Looking Information (17) potential direct or indirect operational impacts resulting from infectious diseases or pandemics such as the ongoing COVID-19 pandemic; (18) the effectiveness of preventative actions and contingency plans put in place by the Compa

  4. Slide 4: Supportive Backdrop Attracts New Investors

    Gold Price Outlook January 2021 Supportive Backdrop Attracts New Investors Low and increasingly negative real rates are supportive for gold prices • Gold is highly correlated to real interest U.S. 10-Year Real Rate rates vs. Gold Price • Real rates remain low and downward -2.0 $2,500 trending due to

  5. Slide 5: Ongoing Fiscal Stimulus Supportive

    Gold Price Outlook January 2021 Ongoing Fiscal Stimulus Supportive Gold increasing as U.S. Federal Reserve balance sheet continues to expand; Significant increases in money supply also driving gold prices higher U.S. Federal Reserve - Total Assets Gold Price vs. U.S. Money Supply vs. Gold Price (M2)

  6. Slide 6: Superior Leverage to Gold

    Gold Price Exposure January 2021 Superior Leverage to Gold Kinross offers among the purest exposure to gold of the peer group Revenue by Commodity 2020-22E (% of Total) 100% 90% 80% Kirkland Lake Yamana Kinross Gold Fields Newmont AngloGold Agnico Eagle Barrick Gold Silver Copper Other Source: RBC E

  7. Slide 7: Kinross Gold Corporation

    Kinross Gold Corporation

  8. Slide 8: Why Kinross?

    Kinross Gold Corporation January 2021 Why Kinross? GLOBAL 2.4Moz. PORTFOLIO Portfolio PRODUCER (1) 8 mines GROWING TO 3 regions 2.9Moz. (ii) FINANCIALLY LARGE GOLD GEOGRAPHICALLY EXCELLENT COMMITTED TO STRONG WITH PRODUCER, DIVERSIFIED OPERATING TRACK RESPONSIBLE ATTRACTIVE HIGHLY LIQUID PRODUCER RE

  9. Slide 9: Diversified Portfolio of Assets

    Kinross Gold Corporation January 2021 Diversified Portfolio of Assets Portfolio of mines and development projects located in three core regions Dvoinoye, Fort Knox, U.S.A. Russia Kupol, Peak, U.S.A. Russia Udinsk, Russia Bald Mountain, U.S.A. Round Mountain, U.S.A. 2019 Gold Equivalent Production(1)

  10. Slide 10: On Track to Meet Guidance

    Kinross Gold Corporation January 2021 On Track to Meet Guidance 2020 would mark the 9th consecutive year of meeting or exceeding guidance targets for production, costs and capital expenditures 2012 2013 2014 2015 2016 2017 2018 2019 2020 Met or exceeded annual On production guidance        

  11. Slide 11: 2020 Guidance

    Kinross Gold Corporation January 2021 2020 Guidance On track to meet targets for production, costs and capital expenditures 2020 Guidance(2) First Nine Months (+/- 5%) 2020 Results Gold equivalent production (ounces)(1,3) 2.4 million 1.7 million Production cost of sales ($ per gold equivalent ounce)

  12. Slide 12: Exciting Future for Kinross

    Kinross Gold Corporation January 2021 (2) Exciting Future for Kinross Strong production growth over the next three years, driving a 20% increase by 2023 Three drivers of growth: Growing Production Profile • Recent three-year capital reinvestment phase established a timely platform for growth that le

  13. Slide 13: 2021 – 2023 Production

    Kinross Gold Corporation January 2021 The Strengths of a Global Portfolio Production expected to increase by 500,000 gold equivalent ounces(1)(i), with declining costs, from 2021-2023 Expected 2021-2023 production growth Production Increases by Mine primarily driven by: 8.0 • Anticipated mine life e

  14. Slide 14: Growth Drivers Support Long-Term Outlook

    Kinross Gold Corporation January 2021 Growth Drivers Support Long-Term Outlook Expecting average annual production of ~2.5 million gold equivalent ounces(1), with additional opportunities that could drive it higher (i)(ii) (i) 2024-2029 is an illustrative trend (1) Refer to endnote #1 (ii) Gold equi

  15. Slide 15: Production Plans and Project Pipeline

    Kinross Gold Corporation January 2021 Production Plans and Project Pipeline Base Case Expected Growth Additional Pipeline Production Projects Opportunities Kupol: regional exploration, Kupol-Dvoinoye Chulbatkan: Udinsk mine life extensions Tasiast: satellites, West Tasiast 24k Branch depth extension

  16. Slide 16: Advancing Project Pipeline

    Kinross Gold Corporation January 2021 Advancing Project Pipeline Expected project milestones at growth projects that span all three operating regions H1 2021 >> H2 2021 >> 2022 >> 2023+ La Coipa Restart  Q4 Round Mountain: Mid-2023 Tasiast 24k Commence Chulbatkan: Udinsk Phase S Phase 7 pre-strippi

  17. Slide 17: Prioritizing Resource Conversion

    Kinross Gold Corporation January 2021 Prioritizing Resource Conversion (6) Significant potential for mine life extension at existing assets 25 20 15 Years 10 5 - Expected Reserve Life Expected Resource Life (i) Excludes Kettle River and Maricunga (ii) Incorporates internal assumptions for recovery r

  18. Slide 18: Strong Liquidity and Financial Flexibility

    Kinross Gold Corporation January 2021 Strong Liquidity and Financial Flexibility Q3 2020 was another quarter of strong results and free cash flow that further strengthened our financial position Liquidity Position Financial Flexibility ($ billion) • Available liquidity of ~$2.5 billion, including $9

  19. Slide 19: Leading Free Cash Flow Profile

    Kinross Gold Corporation January 2021 Leading Free Cash Flow Profile Portfolio of mines expected to generate exceptional free cash flow • Attractive free cash flow yield Analysts Forecast Growing relative to peers attributed to: Free Cash Flow Yield vs. Peers(i) o past investments in 21% organic gro

  20. Slide 20: Disciplined Capital Allocation Strategy

    Kinross Gold Corporation January 2021 Disciplined Capital Allocation Strategy Defined by our three pillars: Reinvesting in our Business • Sustaining capex - maintaining our existing operations safely and to world-class environmental standards • Expansion projects – pursuing attractive returns by lev

  21. Slide 21: Measured Acquisition Track Record

    Kinross Gold Corporation January 2021 Measured Acquisition Track Record Disciplined approach to M&A over the past 8 years, focused on assets that leverage operating expertise in existing regions Bald Mountain & 50% Hydroelectric Chulbatkan Peak Project(ii) of Round Mountain(i) Power Plants Nevada, U

  22. Slide 22: Manageable Debt Profile

    Kinross Gold Corporation January 2021 Manageable Debt Profile Kinross’ senior notes are rated investment grade with the next repayment planned for September 2021 Debt Ratings Debt Schedule Agency Rating S&P BBB- (Stable) $72 Moody’s Baa3 (Stable) $32 Fitch BBB- (Stable) $500 $500 $500 Debt Breakdown

  23. Slide 23: Global Mining Leader in ESG

    Kinross Gold Corporation January 2021 Global Mining Leader in ESG Prioritizing the effective management of ESG risks through our principled approach to sustainability and strong on-the-ground performance at our operations • ESG performance consistently RobecoSAM ranks in top quartile of peer group,

  24. Slide 24: Global Mining Leader in ESG

    Kinross Gold Corporation January 2021 Global Mining Leader in ESG Environment Social Governance 98.5% 630,000 TAILINGS MANAGEMENT of workforce hired from beneficiaries of INDEPENDENT BOARD • Kinross has no upstream facilities within host country community investments • 9 of 10 Board members are • Ma

  25. Slide 25: Award-Winning ESG Record

    Kinross Gold Corporation January 2021 Award-Winning ESG Record Kinross received strong recognition for its ESG performance • Health and Safety: • Sentinels of Safety award at Fort Knox from the U.S. National Mining Association • Chirano named the ‘Safest Mine in Ghana’ by the Minerals Commission and

  26. Slide 26: COVID-19 Update

    Kinross Gold Corporation January 2021 COVID-19 Update Prioritizing the health and safety of employees and host communities Managing the Pandemic and Minimizing Impacts • Portfolio of mines continues to manage well; all remain in operation year-to-date • No material negative impacts to the business •

  27. Slide 27: Competitive Production and AISC Profile

    Kinross Gold Corporation January 2021 Competitive Production and AISC Profile 2020E Production 2020E All-In Sustaining Cost (million ounces) ($ per ounce) 7.0 $1,100 6.0 $1,000 5.0 4.0 $900 3.0 2.0 $800 1.0 - $700 Barrick Kirkland Lake Barrick Kirkland Lake Newmont AngloGold Gold Fields Agnico Eagle

  28. Slide 28: Attractive Value Opportunity

    Kinross Gold Corporation January 2021 Attractive Value Opportunity Relative to peers, considering Kinross’ annual production growth, cost structure and track record P / 2021E Operating CF EV / 2021E EBITDA 8.9 8.6 7.0 8.0 6.7 6.6 6.4 6.9 6.8 4.8 4.3 4.9 4.8 4.6 3.7 3.7 4.2 3.5 Kirkland Lake Agnico E

  29. Slide 29: Discounted Valuation Not Justified by Quality of Assets

    Kinross Gold Corporation January 2021 Discounted Valuation Not Justified by Quality of Assets Kinross has two of the world’s thirteen Tier One assets, with the target of re-establishing Kinross Russia as a third Global Tier One Assets by Total Cash Costs $ 800 $ 600 $ 400 $ 200 - Percent of 2019 Pro

  30. Slide 30: Analyst Consensus P/NAV

    Kinross Gold Corporation January 2021 Discounted Valuation Not Justified by Quality of Assets Attractive value opportunity relative to peers considering Kinross’ in-line geopolitical score P/NAV vs. Fraser Institute Ranking (Weighted by NAV) 1.5x Agnico Eagle Analyst Consensus P/NAV 1.3x Barrick New

  31. Slide 31: Kinross Investment Case

    Kinross Investment Case Operational Excellence Financial Strength & Flexibility Diverse portfolio of mines consistently meeting Maintaining a strong balance sheet continues to or outperforming operational targets be a priority objective 8 Available liquidity of ~$2.5 billion On track to meet $2.5 At

  32. Slide 32: Detailed Overview of Operations and Development Projects

    Detailed Overview of Operations and Development Projects

  33. Slide 33: Americas

    Americas 2019 Gold Equivalent Production(1) Paracatu, Country Highlights Brazil Our largest mine, Paracatu, 21% 25% boasts an attractive cost Brazil structure supported by favourable foreign exchange 2.5M ounces Fort Knox, Alaska Nearly 1/3rd of our production 8% comes from Nevada and 23% U.S.A. Ala

  34. Slide 34: Paracatu, Brazil (100%)

    Americas January 2021 Paracatu, Brazil (100%) Tier 1 gold mine with a long mine life that extends to 2031 • Paracatu is among the world’s largest gold operations, with annual throughput of Operating Results(3) First 9 ~60Mt Months 2018 2019 2020 • Continued outperformance driven by: Production o imp

  35. Slide 35: Paracatu – Northwest Extension

    Americas January 2021 Paracatu – Northwest Extension Mineralization extends to the west of the existing reserve pit, with the potential to extend mine life by approximately 4 years NW Ph1B Multiple NW Ph2 pushbacks being evaluated to the west of Au (g/t) NW Ph1A A – A’ existing reserve pit A’ A Rese

  36. Slide 36: Round Mountain, U.S.A. (100%)

    Americas January 2021 Round Mountain, U.S.A. (100%) Strong cash flow generator with Phase W expected to extend mine life to 2027 • Estimated mine life: 2024 (mining); Operating Results(3) First 9 2027 (stockpile milling / residual Months leaching) 2018 2019 2020 Production • Studying potential for f

  37. Slide 37: Round Mountain – Phase S

    Americas January 2021 Round Mountain – Phase S Potential next pushback on the south side of the Round Mountain pit Plan view of Round Mountain • May extend open pit operations until Phase X 2029 and mill life to early 2030s 1.4 Moz I 0.7 Moz Inf. • Pit optimization scoping study suggests potential i

  38. Slide 38: Round Mountain – Phase X

    Americas January 2021 Round Mountain – Phase X Assessing mineability of potential resource beyond Phase W • Studying potential for incremental mine • Encountering ounces in Phase W upper deposit life extensions at $1,400/oz. or higher - potential to add ounces in upper Phase X in gold prices future

  39. Slide 39: Fort Knox, U.S.A. (100%)

    Americas January 2021 Fort Knox, U.S.A. (100%) The Gilmore project is expected to extend mine life to 2030 • Successfully operating one of the Operating Results(3) world’s few cold weather heap leaches First 9 Months • Future production growth driven by 2018 2019 2020 enhancements to the mine plan,

  40. Slide 40: Fort Knox Gilmore

    Americas January 2021 Fort Knox Gilmore Expected to extend mine life to 2030 and strengthen long-term U.S. production profile Base case mine plan + Gilmore estimates Incremental Gilmore estimates Average annual production 245,000 Au oz. Total ounces recovered 1.5Moz. (2018-2027) Production cost of s

  41. Slide 41: Fort Knox – Gil Satellite Pits

    Americas January 2021 Fort Knox – Gil Satellite Pits Expected to provide near-term, higher grade ore to Fort Knox operation • Permitting is underway, and feasibility study results are expected in early 2021; anticipated first ore to the mill in Q4 2021 N Sourdough • Located 13 km east of Fort Knox N

  42. Slide 42: Fort Knox – Peak Project (70%)

    Americas January 2021 Fort Knox – Peak Project (70%) High grade, open pit project that is expected to extend Fort Knox’s mill operations • Development plan contemplates crushing ore at the project and Peak Resources (100% Basis)(ii) trucking material to the Fort Knox Au Au Ag Ag mill for processing

  43. Slide 43: Fort Knox – Northwest Bulge

    Americas January 2021 Fort Knox – Northwest Bulge Exploring opportunities to further extend and leverage our long operating history in Alaska • Potential expansion of the pit to the $1,400/oz. resource shell could add over 600koz. of M&I and over 350koz. inferred (contained) to the mine plan(i) • Co

  44. Slide 44: Bald Mountain, U.S.A. (100%)

    Americas January 2021 Bald Mountain, U.S.A. (100%) Forecasting strong near-term cash flow with significant upside potential • Large mineral resource base with Operating Results(3) multiple sources of potential mineral First 9 Months reserve additions that could extend mine 2018 2019 2020 life beyond

  45. Slide 45: Bald Mountain

    Americas January 2021 Bald Mountain Numerous targets within the large land package • 1.3 million ounces of reserves expected to Resource Pits – Expected Mine support a four-year mine life at $1,200/oz. Plan to 2024 Potential Extensions • At higher gold prices (beyond $1,200/oz.) the N. Duke Royale m

  46. Slide 46: A Return to Production in Chile

    Americas January 2021 A Return to Production in Chile Construction is underway at the La Coipa Restart project and studies are progressing at Lobo-Marte, which could enable production in a favourable mining jurisdiction beyond 2040 • La Coipa and Lobo-Marte are located in Chile’s Atacama N (Region I

  47. Slide 47: La Coipa Restart Project

    Americas January 2021 La Coipa Restart Project Pre-stripping expected in early 2021; first production expected in mid-2022 • Leverages existing infrastructure, including plant and Maricunga mine fleet • Potential to extend mine life through satellite deposits • Project is on schedule: o An access ro

  48. Slide 48: La Coipa Restart Feasibility Study Results

    Americas January 2021 La Coipa Restart Feasibility Study Results Project expected to generate a 28% IRR at an assumed gold price of $1,200/oz. Feasibility Study Estimates Life of mine production (2022 to 2024) 690,000 gold equivalent ounces Average production cost of sales(3) $575 per gold equivalen

  49. Slide 49: Lobo-Marte

    Americas January 2021 Lobo-Marte Project adds 6.4 million higher-grade gold ounces to estimated probable mineral reserves(i) • Mine has the potential to support Kinross’ long-term production profile with attractive Gold Reserves (Au eq. Moz) all-in sustaining costs +6.4 • Recently completed PFS cont

  50. Slide 50: Lobo-Marte Pre-Feasibility Study Results

    Americas January 2021 Lobo-Marte Pre-Feasibility Study Results Proceeding to feasibility study, expected to be complete in Q4 2021 Pre-Feasibility Study Estimates Initial Capital Costs ($M) Life of mine production (million Au oz.) 4.5 Mine equipment $100 Life of mine ore processed (million tonnes) 1

  51. Slide 51: West Africa

    West Africa 2019 Gold Equivalent Production(1) Tasiast, 21% Country Highlights Mauritania Tier 1 mine with a large gold 2.5M ounces 56% Mauritania resource located in a prospective district; 24k 16% project progressing well Expected mine life extension 7% Ghana and increased production due to explor

  52. Slide 52: Positive Momentum in Mauritania

    West Africa January 2021 Positive Momentum in Mauritania Successfully operated for over 10 years Cumulative production of over 2 million gold equivalent ounces  Established $300M political risk insurance policy with MIGA A member of the World Bank  Constructed Phase One Project successfully commis

  53. Slide 53: Tasiast, Mauritania (100%)

    West Africa January 2021 Tasiast, Mauritania (100%) Low-cost mine with a large gold resource located in a prospective district • Estimated mine life: 2033 Operating Results(3) First 9 • New records set in Q3 2020: Months 2018 2019 2020 o Record monthly production of Production 250,965 391,097 295,48

  54. Slide 54: Tasiast Project Financing

    West Africa January 2021 Tasiast Project Financing Reflects comprehensive process of due diligence with lenders • Signed $300 million IFC-led project financing agreement in December 2019 o Non-recourse to Kinross o Four new, important partners in project underscore confidence in Tasiast Project Fina

  55. Slide 55: Advancing the Tasiast 24k Project

    West Africa January 2021 Advancing the Tasiast 24k Project Well-positioned to execute the 24k project Low relative execution risk • Project plan leverages Kinross’ experience successfully building and operating Phase One • Less infrastructure requirements • Permits in place Project advancing on sche

  56. Slide 56: Tasiast 24k Project Feasibility Study Results

    West Africa January 2021 Tasiast 24k Project Feasibility Study Results The value-enhancing Tasiast 24k project offers attractive estimated returns, increased production and lower costs Operating Estimates Throughput capacity 24,000 t/d Average annual production (2022 – 2028) 563,000 gold ounces Prod

  57. Slide 57: Low-Capital Continuous Improvement Approach to 24k

    West Africa January 2021 Low-Capital Continuous Improvement Approach to 24k Increasing throughput with debottlenecking initiatives, plant upgrades and optimization of the mine plan and processing circuit Building off success of Phase One and Project Overview continued outperformance of the SAG mill

  58. Slide 58: Tasiast

    West Africa January 2021 Tasiast World-class orebody and highly prospective district Northern satellites • Multiple low strip(i) oxide deposits located 5 - 12 km north of the Tasiast operation • Fennec, C67, and C68 are prospective targets for further drilling o High grade satellite ore could be mil

  59. Slide 59: Chirano, Ghana (90%)

    West Africa January 2021 Chirano, Ghana (90%) Expected mine life extension and increased production due to exploration success • Chirano is an underground and open pit Operating Results(1,3) First 9 operation located in southwestern Ghana Months • Mine life expected to extend to at least 2025 2018 2

  60. Slide 60: Chirano – Obra

    West Africa January 2021 Chirano – Obra Substantial contributor to Chirano mine life extension • Expect to extend mining to 2025 through exploration success: o H1 2020 drilling yielded significant intercepts and extended the depth of high-grade mineralization o Exploration drifting to drill from und

  61. Slide 61: Chirano – Exploration

    West Africa January 2021 Chirano – Exploration Numerous targets at depth and on surface along shear • Potential exists for continuation at depth of existing underground mines and parallel splays at Akwaaba and Tano • Exploration upside being investigated at newer underground zones: Obra and Suraw •

  62. Slide 62: Russia

    Russia 2019 Gold Equivalent Production(1) Kupol-Dvoinoye 21% Country Highlights Recently acquired Chulbatkan development project expected 2.5Mounces 56% to extend our long history of production in Russia beyond 23% Russia 2030 Long track record of mine life extensions expected to continue at Kupol A

  63. Slide 63: Deep Experience In-Country

    Russia January 2021 Deep Experience In-Country Kinross has a long and successful 25-year track record investing in Russia Significant operating experience 2019 Statistics: • Operated four mines, including the high-grade, low Kinross Investments in Russia cost Kupol and Dvoinoye mines 98.2% of employ

  64. Slide 64: Foreign Investment in Russia

    Russia January 2021 Foreign Investment in Russia The world’s leading companies are Foreign Investment Advisory Council invested in Russia • Chaired by the Russian Prime Minister, includes CEOs from over 50 international companies 64

  65. Slide 65: Strong Platform in Russia

    Russia January 2021 Strong Platform in Russia Track record of adding reserves through exploration to offset depletion at Kupol supports a potential bridge to production at Chulbatkan 12.0 2025 Gold Equivalent Ounces 10.0 End of Mine Life 8.0 (Millions) 6.0 2020 4.0 2.0 - 2015 2008 2009 2010 2011 201

  66. Slide 66: Kupol-Dvoinoye (100%)

    Russia January 2021 Kupol-Dvoinoye (100%) Our Russian mines are a model for successfully operating in a remote location • High-grade, low-cost underground mines supported by one mill Operating Results(3) First 9 Months • Mine life expected to extend to at least 2025 2018 2019 2020 • Q3 2020 was anot

  67. Slide 67: Kupol

    Russia January 2021 Kupol Significant resources remaining at high grades • Successful transition to narrower mining expected to allow for reserve additions through engineering changes • Drill program is underway with the goal of converting resources to reserves Base Case & Growth Minex Targets 67

  68. Slide 68: Kupol

    Russia January 2021 Kupol Numerous opportunities for continued reserve growth Big Central South North North South Extension Karman Bend Zone Zone Zone Zone Upper North Extension 42 Kupol Deeps S. Hanging N. Hanging Providence Moroshka Vtoriy Wall Wall Base Case Additional Pipeline Opportunities Depl

  69. Slide 69: Kupol – Prospective Regional Exploration

    Russia January 2021 Kupol – Prospective Regional Exploration Numerous prospective tenements near the Kupol mill • Kinross owns significant prospective exploration ground within trucking distance of the Kupol mill • Kayenmyvaam offers excellent near-term resource definition and advanced exploration o

  70. Slide 70: Chulbatkan: Favourable Location

    Russia January 2021 Chulbatkan: Favourable Location Khabarovsk is industrialized and has a well-established mining and exploration sector Mining-friendly jurisdiction Kupol • Several gold producers active in the region Magadan o Ten operating mines Khabarovsk o Fourth largest gold producing region i

  71. Slide 71: Udinsk: Inaugural Project in the Chulbatkan Region

    Russia January 2021 Udinsk: Inaugural Project in the Chulbatkan Region Expected to be a substantial open pit gold mine with a low all-in sustaining cost(3) • Preliminary estimates; scope of project may change following planned extensive drill program and technical studies and trade-offs Excellent fi

  72. Slide 72: Encouraging Results at Udinsk

    Russia January 2021 Encouraging Results at Udinsk ~50,000m of infill and metallurgical drilling completed by the end of Q3 2020 • Exploration results support thesis for the project: o Large estimated resource with highly continuous mineralization • The 2020 drill program has ramped back up after cha

  73. Slide 73: Chulbatkan – Growth Through Exploration

    Russia January 2021 Chulbatkan – Growth Through Exploration Numerous untested targets within the expanded exploration license Potential for additional discoveries is enhanced • Summer license-wide exploration geochemistry and geophysics program exceeded expectations • New anomalies have been identif

  74. Slide 74: Corporate Responsibility

    Corporate Responsibility 74

  75. Slide 75: Our Approach

    Corporate Responsibility January 2021 Our Approach At the heart of our success is our people and our four Core Values Our Values and Guiding Principles unite our global workforce Our approach to Corporate Responsibility can be distilled into four main areas: • Do no harm – We work to protect our wor

  76. Slide 76: Strong Safety Performance

    Corporate Responsibility January 2021 Strong Safety Performance Maintained Total Reportable Injury Frequency Rate on par with, or better than, low-risk, non-industrial sectors • Implemented risk controls, training, and provided leadership to ensure a culture of safe work at all Benchmarking TRIFR 20

  77. Slide 77: Climate Change and Energy Efficiency

    Corporate Responsibility January 2021 Climate Change and Energy Efficiency GHG intensity one of lowest in the industry – Paracatu down by 38% since 2017 • Completed independent evaluation of disclosure and performance on climate Gold Peers 5-Year GHG Intensity change in 2020 (kg CO2e / tonne of ore

  78. Slide 78: Managing our Environmental Footprint

    Corporate Responsibility January 2021 Managing our Environmental Footprint We are a responsible steward of land and water during all stages of the mine’s life cycle 2019 Highlights Performance Highlights • Received a top ranking for the fourth • Sustained one of the consecutive year from World Wildl

  79. Slide 79: Responsible & Safe Tailings Management

    Corporate Responsibility January 2021 Responsible & Safe Tailings Management All of our tailings facilities are designed and constructed to the highest engineering standards and meet or exceed regulatory and international requirements and standards of best practice • Tailings management programs inc

  80. Slide 80: Governance Highlights

    Corporate Responsibility January 2021 Governance Highlights Kinross is committed to the highest standards of corporate governance and accountability • All directors are independent except for • 8 of 9 Board members are the Chief Executive Officer independent • All of our Board committees are • Board

  81. Slide 81: Appendix

    IX Append KINROSS

  82. Slide 82: Third Quarter 2020 Financial Highlights

    Third Quarter 2020 Financial Highlights

  83. Slide 83: Operational and Financial Highlights

    Third Quarter 2020 Financial Highlights January 2021 Operational and Financial Highlights Significant growth in margins, earnings and free cash flow • Paracatu, Kupol-Dvoinoye and Tasiast accounted for over 60% of production and delivered among the Q3 First Nine Months lowest costs 2020 Results 2020

  84. Slide 84: Third Quarter Financial Highlights

    Third Quarter 2020 Financial Highlights January 2021 Third Quarter Financial Highlights Produced approximately 603,000 oz.(1) at an average cost of sales of $737/oz.(1,3) and an all-in sustaining cost of $958/oz.(1,3) Year-over-year improvements Quarter-over-quarter improvements 213% Adjusted net ea

  85. Slide 85: COVID-19 Response

    COVID-19 Response

  86. Slide 86: Essential Service Status

    COVID-19 Response January 2021 Essential Service Status(i) Operation Location Status Government Decree Mining considered essential as part of State of Nevada regulations issued on Round Mountain Nevada, U.S.A. Operating March 20, 2020. Mining considered essential as part of State of Nevada regulatio

  87. Slide 87: Community Impact

    COVID-19 Response January 2021 Community Impact Community health and safety is a key priority. Kinross has committed $5.8 million to help local communities and health authorities deal with the impacts of COVID-19. • Donated medical supplies and equipment to health authorities in many of our jurisdic

  88. Slide 88: Terms Reached with the Government of Mauritania

    Terms Reached with the Government of Mauritania

  89. Slide 89: Enhanced Partnership with Government of Mauritania

    Terms Reached with Government of Mauritania January 2021 Enhanced Partnership with Government of Mauritania “Tasiast is an important contributor to Mauritania and we believe our new agreement will be a positive model for other foreign mining investors.” - Mauritanian Ministry of Petroleum, Mines and

  90. Slide 90: Updated Royalty Structure

    Terms Reached with Government of Mauritania January 2021 Updated Royalty Structure Voluntarily updating royalty structure to bring it in line with current law and comparable levels in the region • Strengthens the foundation for long-term stability and further aligns interests by ensuring Mauritania

  91. Slide 91: Tasiast Sud: 30-year Exploitation License to be Granted

    Terms Reached with Government of Mauritania January 2021 (i) Tasiast Sud: 30-year Exploitation License to be Granted Large, prospective property located ~10km south of the Tasiast mine area • Initial mining expected to take place at the Tamaya deposit; mill grade ore to be processed at the existing

  92. Slide 92: Mauritania Highlights

    Terms Reached with Government of Mauritania January 2021 Mauritania Highlights Kinross has successfully operated in Mauritania since 2010 • Peaceful and democratic transition of power in 2019 Country Statistics(i) (2019 estimates, unless otherwise noted) o President Ghazouani elected with a pro- bus

  93. Slide 93: Significant Contributions In-Country

    Terms Reached with Government of Mauritania January 2021 Significant Contributions In-Country From 2010 - 2019, Kinross has contributed over $3 billion to Mauritania’s economy through taxes, procurement, community programs and wages • Invested over $30M in training and capacity building from 2013 -

  94. Slide 94: Endnotes

    Appendix January 2021 Endnotes 1) Unless otherwise noted, gold equivalent production, gold equivalent ounces sold, production cost of sales, all-in sustaining cost figures and attributable margin in this presentation are based on Kinross’ 90% share of Chirano and 70% share of Peak production and sal

  95. Slide 95: 2019 Gold Reserve & Resource Estimates

    Appendix January 2021 2019 Gold Reserve & Resource Estimates Fort Knox (Inclusive of NW Bulge & Gil) Fort Knox – NW Bulge Tonnes Grade Ounces Tonnes Grade Ounces (thousands) (g/t) (thousands) (thousands) (g/t) (thousands) Proven Reserves 43,982 0.4 541 Proven Reserves - - - Probable Reserves 211,828

  96. Slide 96: Notes – 2019 Kinross Mineral Reserve & Resource Statements

    Notes – 2019 Kinross Mineral Reserve & Resource Statements January 2021 (1) Unless otherwise noted, the Company’s mineral reserves are estimated using appropriate cut-off grades based on an assumed gold price of $1,200 per ounce. Mineral reserves are estimated using appropriate process recoveries, o