  1. Slide 1: Lake Erie Works Community Liaison Committee Meeting

    Lake Erie Works Community Liaison Committee Meeting Site-Specific Standard Q1 2020 13 May 2020

  2. Slide 2: Performance Review – During Rehabilitation Project (Leak Limits)

    Site-Specific Standard Order (Particulates): Performance Review – During Rehabilitation Project Date Doors Lids Off-takes (% Leaks) (% Leaks) (% Leaks) 2015 Limits 54% 2% NA (July 2 start) 2016 Limits 32% 2% NA 2017-2019 Limits 10% 2% 5% 2020 Limits 5% 1% 4% Jan 1 – Mar 31, 2020 0.0 – 12.50% 0.0 – 1

  3. Slide 3: Performance Review – 30 Day Rolling Averages

    Site-Specific Standard Order (Particulates): Performance Review – 30 Day Rolling Averages During Rehabilitation Project Date Doors Lids Off-takes Charging (% Leaks) (% Leaks) (% Leaks) (sec) (log avg) 2015 Limits 38% 0.8% 25% 12 sec (July 2 start) 2016 Limits 22.5% 0.8% 15% 12 s 2017-2019 Limits 7%

  4. Slide 4: Performance Review – Daily Observations

    Site-Specific Standard Order (Particulates): Performance Review – Daily Observations – During Rehabilitation Project Date Pushing Emission (opacity %) 2015 Limit (July 2 start) ≥ 50% 2016 – 2018 ≥ 50% 2019 ≥ 40% 2020 ≥ 30% Jan 1 – Mar 31, 2020 Range 0 – 73.33% (Average) (7.36%) January 1 – March 31,

  5. Slide 5: Additional Items

    Site-Specific Standard Order (Particulates): Performance Review – Additional Items • There were no community complaints for the period of Q1 2020 related to the Site-Specific Standard • Additional • 1 odour inquiry – root cause: utilization of temporary blast furnace slag granulator when permanent g

  6. Slide 6: LEW Coke Battery Rehabilitation Status Update

    LEW Coke Battery Rehabilitation Status Update • Original end-flue repair project scope • Idle one half of battery to conduct repairs while other half continues to operate; then repair other half • Since then, Company Management is evaluating various alternatives to completely overhaul the entire bat

  7. Slide 7: Blast Furnace Re-line

    Blast Furnace Re-line • We continue to prepare for a 75-day blast furnace outage for a full reline of the blast furnace, currently scheduled Q3 2020. • Company expects to increase annual hot metal capacity by up to 300 thousand net tons • Management is actively monitoring the COVID-19 pandemic to de

  8. Slide 8: Next CLC Meeting

    Next CLC Meeting The next CLC meeting is scheduled for Aug. 12.

  9. Slide 9: Thank You.

    | STELCO | . The Steel Company of Canada Thank You. stelco.com