Capricorn Metals Ltd · ASX:CMM

Capricorn Metals — 2026 Macquarie Australia Conference

32 slides from Capricorn Metals's conference presentation, May 7, 2026

  1. Slide 1: High Margin, Long Mine Life Gold Business with Compelling Growth

    HIGH MARGIN, For personal use only LONG MINE LIFE GOLD BUSINESS WITH COMPELLING GROWTH 2026 Macquarie Presenter Australia Conference Mark Clark – Executive Chairman capmetals.com.au

  2. Slide 2: Disclaimer & Competent Persons Statement

    Disclaimer & Competent Persons Statement Such risks include, but are not limited to resource risk, metals price volatility, currency fluctuations, increased production costs and variances in ore grade or recovery rates from those assumed in mining plans, as well as governmental regulation and GENERA

  3. Slide 3: Who is Capricorn Metals?

    Who is Capricorn Metals? High Margin Production + Compelling Growth For personal use only Karlawinda – 1.3Moz1 reserve Built on time & budget, in <18 months for A$180m 4yrs production inc. FY25: 468koz @ AISC A$1,311/oz for $622M cash build Expansion underway to 150,000 ounces/pa production2 1.3Moz

  4. Slide 4: Capricorn Metals - Corporate Summary

    Capricorn Metals - Corporate Summary Capital Structure Shareholders For personal use only Shares on issue (ASX:CMM) 456.8 million Institutional - 49% Retail - 14% Board & Management - 8% Performance rights 1.6 million BlackRock - 7% Van Eck - 6% Share price (1 May 2026) $11.77 State Street - 6% Para

  5. Slide 5: KGP - Engineered to Maximise Margin

    KGP - Engineered to Maximise Margin 7000 AUD Spot Gold Price1 For personal use only (Monthly Average) 6000 5000 4000 Δ$5,417 AUD Gold Price 3000 for ORE3 2000 Δ$1,492 1000 Quarterly AISC2 0 Jun-21 Sep-21 Dec-21 Mar-22 Jun-22 Sep-22 Dec-22 Mar-23 Jun-23 Sep-23 Dec-23 Mar-24 Jun-24 Sep-24 Dec-24 Mar-2

  6. Slide 6: Karlawinda Gold Project

    For personal use only Karlawinda Gold Project Capricorn’s cornerstone asset & template for development of Mt Gibson

  7. Slide 7: KGP - Capricorn's cornerstone asset and strong cash generator

    KGP - Capricorn’s cornerstone asset and strong cash generator Key Metrics(1) FY26 FY25 H1 Q3 Record gold production, project delivery & maiden dividend For personal use only Gold production 115-125 117 62.8 30.4 (kozs) AISC (A$/oz) 1530-1630 1,468 1,626 1,617 Ore mined (‘000 BCM) 2,415 884 482 Waste

  8. Slide 8: KGP Reserve - Maintaining +10 years ahead

    KGP Reserve - Maintaining +10 years ahead Tonnes Grade Ounces (M) (g/t) For personal use only Probable Reserves (ORE)1 53.6 0.8 1,295,000 M & I Resources 80.9 0.7 1,833,000 Inferred Resources 13.6 0.7 287,000 Total Resources1 98.6 0.7 2,120,000 Reserves1 1.3 million ounces • Mine life 9 years (6.5mt

  9. Slide 9: Karlawinda Mine Expansion

    Karlawinda Mine Expansion Project Status CIL From 4mtpa to 6.5mtpa (150kozpa) Transfer For personal use only ROM 2 Crushing Milling Expansion Construction Well Advanced Sizing Surge Bin Additional : Crushing & Milling Circuits Leaching Capacity ROM & Tailings Dam Delivering a 2.5Mtpa increased Capac

  10. Slide 10: Mt Gibson Gold Project

    For personal use only Mt Gibson Gold Project Robust & executable project of genuine scale

  11. Slide 11: Ore Reserve Estimate 2.73Moz - Update this quarter

    Ore Reserve Estimate 2.73Moz1- Update this quarter Probable & Total Highway Cut-off Tonnes Grade Ounces (<1% of drilling) For personal use only (g/t) (Mt) (g/t) (koz) (5km NW) 0.05Moz Laterite 0.4 0.9 0.5 15 Ave Drill Depth 48m Oxide 0.4 10.3 0.9 84 Transitional 0.4 11.6 0.8 311 Fresh 0.4 68.9 0.9 2

  12. Slide 12: Project Status PFS Highlights

    Project Status PFS Highlights1 ORE 2.59Moz Mt Gibson Gold Project Plant Infrastructure A$260 million (Capital Cost) For personal use only Pre-Production Mining A$86 million (Capital Cost) Project Payback 2.3 Years (A$3,300/oz gold price) Free Cash Flow & NPV5 A$3.20bn & (A$3,300/oz gold price) A$1.9

  13. Slide 13: Mount Gibson Underground - Drilling

    Mount Gibson Underground - Drilling Image - six drill rigs on MGGP Underground For personal use only capmetals.com.au 13

  14. Slide 14: Underground Potential Emerging, Orion Resource

    Underground Potential Emerging, Orion Resource1 Orion South Underground Highlights • Impressive results point to width For personal use only and tenor at ~70-degree dip • Just 1.2km of 8km strike • 6 drill rigs on site 2 Conceptual Mine Study – Key Highlights Cut Off 1.75g/t ($2500 GP) MSO + Develop

  15. Slide 15: Mount Gibson Underground – Land of Opportunity

    Mount Gibson Underground – Land of Opportunity Opportunity to meaningfully grow the inventory and production profile • Drilling not geology or economics constrained – where we drill, we find mineralization For personal use only • Orion South Underground has continued to be expedited, PFS underway wi

  16. Slide 16: Underground Potential Emerging, Lexington – Project Next?

    Underground Potential Emerging, Lexington – Project Next? Lexington Highlights For personal use only • Impressive results point to width and tenor at ~80-degree dip • Distinct intrusion-related orogenic system with higher grade tenor • Only 600m north of Orion South underground MRE and open in all d

  17. Slide 17: Warriedar Acquisition – Adding Strategic Options to MGGP

    Warriedar Acquisition – Adding Strategic Options to MGGP South Murchison gold consolidation delivers enhanced scale and optionality Significant Gold Resources Gives Capricorn Belt Scale Strategic Infrastructure For personal use only - Grow, Optimise, Mine Exploration Opportunity - Potential MGGP Sca

  18. Slide 18: Investment Highlights

    Investment Highlights Capricorn is a high margin, long mine life gold business with compelling growth Why Capricorn? For personal use only • Proven team that delivers for shareholders • Two regionally significant projects 4.0Moz ORE1 +10 Years Life • Long life/low cost with organic expansion Growth

  19. Slide 19: Appendix A: Resource, Reserve & Peer Comparison Data

    For personal use only Appendix A Resource, Reserve & Peer Comparison Data

  20. Slide 20: Mineral Resources

    Mineral Resources For personal use only TABLE 1: MGGP & KGP MINERAL RESOURCE4 Indicated Inferred Total Mineral Resources Type Deposit Cut-Off Tonnes Grade Ounces Tonnes Grade Ounces Tonnes Grade Ounces Mineral Resource Estimate Source Document (Mt) (g/tAu) (000's) (Mt) (g/tAu) (000's) (Mt) (g/tAu) (

  21. Slide 21: Ore Reserves

    Ore Reserves For personal use only TABLE 2: GROUP OPEN PIT ORE RESERVE STATEMENT5 Proved Probable Total Type Deposit Tonnes Grade Ounces Tonnes Grade Ounces Tonnes Grade Ounces Ore Reserve Estimate Source Document (000's) (g/tAu) (000's) (000's) (g/tAu) (000's) (000's) (g/tAu) (000's) Open Pit MGGP

  22. Slide 22: Appendix A – Peer Comparison Data

    Appendix A – Peer Comparison Data1 Proved Probable Total ASX Code Project Tonnes Grade Ounces Tonnes Grade Ounces Tonnes Grade Ounces Ore Reserve Estimate1 Source Document For personal use only (000's) (g/tAu) (000's) (000's) (g/tAu) (000's) (000's) (g/tAu) (000's) NST KCGM 143,975 0.6 2,937 219,998

  23. Slide 23: Appendix B: Warriedar Mineral Resource Estimate

    For personal use only Appendix B Warriedar Mineral Resource Estimate

  24. Slide 24: Appendix B | Warriedar Mineral Resource Estimate

    Appendix B | Warriedar Mineral Resource Estimate Golden Range Mineral Resources (JORC 2012) - May 2025 Measured Indicated Inferred Total Resources kOz kOz kOz Au / Deposit kt g/t Au kOz Au kt g/t Au kt g/t Au kt g/t Au Au Au AuEq For personal use only Austin - - - 222 1.3 9.1 212 1.5 10.1 434 1.4 19

  25. Slide 25: Appendix B | Warriedar Mineral Resource Estimate

    Appendix B | Warriedar Mineral Resource Estimate • Competent Person Statements | Golden Range • Competent Person Statements | Big Springs For personal use only • The information in this report that relates to estimation, depletion and reporting of the • The information in this report related to Expl

  26. Slide 26: Appendix B | Warriedar Gold Equivalent Calculation Methodologies

    Appendix B | Warriedar Gold Equivalent Calculation Methodologies • RICCIARDO Sb MRE – Resource (refer ASX:WA8 Release 5 May 2025) • RICCIARDO Sb Exploration results (refer ASX:WA8 Release 21 June 2025) For personal use only • Warriedar considers that both gold and antimony included in the gold equiv

  27. Slide 27: Appendix C: Karlawinda Expansion Progress Photos

    For personal use only Appendix C Karlawinda Expansion Progress Photos

  28. Slide 28: Karlawinda Expansion Project – Primary/Secondary Crusher

    Karlawinda Expansion Project – Primary/Secondary Crusher Building to +150koz of high margin production For personal use only capmetals.com.au 28

  29. Slide 29: Karlawinda Expansion Project – Mill

    Karlawinda Expansion Project – Mill Building to +150koz of high margin production For personal use only capmetals.com.au 29

  30. Slide 30: Karlawinda Expansion Project – TSF

    Karlawinda Expansion Project – TSF 2 Building to +150koz of high margin production For personal use only capmetals.com.au 30

  31. Slide 31: Karlawinda Expansion Project – Berwick

    Karlawinda Expansion Project – Berwick Building to +150koz of high margin production For personal use only TSF 2 capmetals.com.au 31

  32. Slide 32: Not for release or distribution in the United States

    NOT FOR RELEASE OR DISTRIBUTION IN THE UNITED STATES For personal use only Capricorn Metals Ltd (ASX: CMM) Level 3, 40 Kings Park Road West Perth, WA enquiries@capmet.com.au +61 8 9212 4600 www.capmetals.com.au ABN: 84 121 700 105

Capricorn Metals — 2026 Macquarie Australia Conference on 6ix