Volt Resources Ltd · ASX:VRC

Volt Resources — Investor Presentation (August 2024)

31 slides from Volt Resources's investor presentation, August 2024

  1. Slide 1: An Integrated Battery Material Producer

    An Integrated Battery Material Producer Critical Minerals | Battery Materials August 2024 6 X C An ASX: VRC Carbon Anode

  2. Slide 2: Important Notices Disclaimer

    Important Notices Disclaimer The information contained in this document (“Presentation”) has been prepared by Volt Resources Limited (the “Company”). It has not been fully verified and is subject Neither this presentation nor any copy of it may be (a) taken or transmitted into the United Kingdom, Ca

  3. Slide 3: Corporate Overview

    Corporate Overview Capital Structure. Listed on ASX ASX Code VRC Major Shareholders Major Shareholders 14.33% Kabunga Holdings Pty Ltd (as of June 2024) 4,99% PR & E Notman 3.03% 10 BOLIVIANOS PTY LTD 2.67% D Virgara 1.80% Bosswhat Pty Ltd Key Executive Team Executive Chairman Asimwe Kabunga Managin

  4. Slide 4: The Volt Team

    The Volt Team Battery Materials, Mining, & Specialty Chemical Background Asimwe Kabunga Prashant Chintawar Roman Saramaga Chris Larder Executive Chairman MD & CEO Director, VP, Technology Asimwe is a Tanzanian born Prashant is an entrepreneurial Zavalievsky Graphite Chris is VP of Technology for Aus

  5. Slide 5: Volt Investment Rationale

    Volt Investment Rationale 1 Clear Strategy – focus on battery grade graphite due to large addressable market, unique value proposition, and market tailwinds. We have a patent pending & environmentally superior process for ultra high purity (99.95%) battery grade graphite production. 2 Proven Graphit

  6. Slide 6: The Key Minerals in an EV Battery

    THE KEY MINERALS IN AN EV BATTERY ELEMENTS |@

  7. Slide 7: Graphite Poised for Next Bull Market

    Graphite Poised for Next Graphite Demand Vs Supply Bull Market Synthetic Graphite Anode: Natural Graphite Anode: 2022–2030 2022–2030 • Expect flake graphite prices to steadily grow over the Supply Demand Supply Demand next several years Growth Growth Growth Growth • Benchmark Flake Graphite Price Ch

  8. Slide 8: Downstream Business and Upstream Business

    Downstream Business (Natural Graphite Anode) + Upstream Business (Mining) 8

  9. Slide 9: China Controls Graphite Refining

    China Controls Graphite Refining US and Europe looking to build ex-China supply chain 9

  10. Slide 10: Volt is a Proven Graphite Refiner

    Volt is a Proven Graphite Refiner 10

  11. Slide 11: Patent Pending Low-Cost Process for Ultra High Purity Graphite

    Patent Pending Low-Cost Process for Ultra High Purity (99.95%) Battery Grade Graphite Production Existing High Purity (99.5%) Graphite Production Line US Provisional Patent (63/581,171) “Low-Cost HF Free Purification to Produce Battery Grade Graphite”. Step 1: Starting with flake graphite concentrat

  12. Slide 12: Purification Can be Done Before or After Spheroidization

    Purification Can be Done Before or After Spheroidization Non-Conventional Process for CSPG (Coated Spherodized Purified Graphite) Production Ore Grinding, Flotation, Volt’s Two Step Graphite Mining Concentration, Graphite Purification Pitch Coating Filtration (Refining) Milling, Spherodization, Ore

  13. Slide 13: Non-Thermal and HF Free Refining Process

    Volt’s Non-Thermal and Hydrofluoric Acid Free Refining Process Produces Battery Grade Graphite Features Benefits HF free process • No need to store hydrofluoric acid (HF) on-site • Lower cost • Ease of permitting Non-thermal purification • Lower cost Simple flowsheet • Low cost Proven • 99.5% produc

  14. Slide 14: Volt's Graphite Refining Process

    Volt’s Graphite Refining Process Volt analysis Volt’s Thermal Hydrofluoric Acid Chemical Purification Purification Process Economic Low Initial Capital Cost √ XX X Comparison Low Sustaining Capital Cost √ X X Low Operating Cost √ X X Technical Suitability of √ √ √ Comparison Graphite for LIB – Impur

  15. Slide 15: Identified Site in Tuscaloosa, Alabama for Graphite Refinery

    Identified Site in Tuscaloosa, Alabama for 20 ktpa Graphite Refinery Planned SOP in 2027 (contingent on funding) 15

  16. Slide 16: New US Battery Manufacturing and Supply Chain Investments

    New US Battery Manufacturing and Supply Chain Investments 16

  17. Slide 17: High Purity Graphite Evaluation

    High Purity Graphite Evaluation • One customer has been sent the sample and we are in discussion with additional potential customers. • Contingent upon funding, to further advance the dialogue we will generate more technical data and samples. 17

  18. Slide 18: Downstream Business and Upstream Business

    Downstream Business (Natural Graphite Anode) + Upstream Business (Mining) 18

  19. Slide 19: Volt is a proven graphite producer with a mine in operation since 1934

    Volt is a proven graphite producer with a mine in operation since 1934 Significant portion of graphite is fine Resources: 22.9 million ton at a mesh suitable for lithium-ion batteries grade of 6.8% carbon – subset of Grinding + Flotation + Filtration + overall deposit based on south-east Purificatio

  20. Slide 20: Ukraine Status

    Ukraine Status • Ukraine Law Firm has completed the warranty claim and presented to the Sellers. The claim significantly exceeded the deferred consideration amount of US$3.8M. It is now up to the Sellers to either accept the warranty claim or dispute the warranty claim through arbitration in London.

  21. Slide 21: Tanzania Bunyu Graphite

    Tanzania Bunyu Graphite Enough to power 2.8 million EVs per year Highlights Indian Ocean One of the largest graphite deposits in the world. 100% owned; Greenfield project; Bunyu is the largest JORC Mineral resource in Tanzania Tanzania Lindi On1y 140 km from Mtwara port Sealed Roads Two stage develo

  22. Slide 22: Bunyu Stage 1 has Strong Project Economics

    Bunyu Stage 1 has Strong Project Economics Feasibility study completed in August 2023 Stage 1 Project Unit Financial Performance 2023 Project Period - from first ore years 13.7 Total Net Revenue US$ M, real 433.2 Total EBITDA US$ M, real 169.6 IRR - before tax %, real 31.5 IRR – after tax* %, real 2

  23. Slide 23: Bunyu Graphite Evaluation

    Bunyu Graphite Evaluation • About 113 tonnes of Bunyu ore was mined in 2023, a portion of this was processed into graphite concentrate, and delivered to a customer in early 2024. • Technical evaluation was positive. Due to softness in the flake graphite prices, the Company decided to steer the discu

  24. Slide 24: Stage 1 Bunyu Graphite Sold Under Offtakes

    Stage 1 Bunyu Graphite Sold Under Offtakes Graphex Group Limited Offtake agreement signed with global battery anode material producer Graphex Group Limited subsidiary, Graphex Michigan 1 LLC. Graphex Group is listed on Hong Kong Stock Exchange and the NYSE. 7,500-10,000 tpa fine flake graphite for f

  25. Slide 25: Graphite Projects & Inflation Reduction Act

    Graphite Projects & Inflation Reduction Act 1. From 2027, Critical Minerals can not be Inflation Reduction Act, US extracted, processed, or recycled in a Foreign Entity of Concern Consumer Tax Credit, $7,500 per EV Eligibility Requirements 2. Foreign Entity of Concern – China, Russia, N Korea, & Ira

  26. Slide 26: Asena Lithium Overview

    Asena Lithium Overview Exploring on the shoulders of giants. Licence applications amongst Europe’s leading lithium-borate exploration projects Three license applications of 291km² in area with similar prospective geology and physical proximity 1 JADAR NORTH (area comprising 98.75km2) • Asena has dir

  27. Slide 27: Asena Lithium Serbia Update

    Asena Lithium Serbia Update • At the session held on 11 July 2024, the Serbian Constitutional Court issued Decision IUo-39/2022. The court said in a ruling that Decree on the Termination of the Decree on Establishing the Spatial Plan of the Special Purpose Area for the Implementation of the Jadarite

  28. Slide 28: Gold Projects, Guinea

    Gold Projects, Guinea HIGHLIGHTS FACT SHEET Location Guinea • Volt acquired 100% interest in three gold projects (Kouroussa, Mandiana and Konsolon) in Project Stage Exploration the richly mineralised Birimian Greenstone Belt in Guinea, West Africa. Business Gold and base metals • Three projects comp

  29. Slide 29: Summary

    Summary • Board of Director changes • Dom Virgara to join the Board to provide execution oversight • Board to take Director Fees in equity. CEO to take 50% in equity • Fiscal Discipline • The Company has successfully reduced the cash outflows. The net cash outflow during FY 2024 was $4,610,000 vs $9

  30. Slide 30: Volt Transformation is Underway

    Volt Transformation is Underway From mining only to an integrated materials producer Integrated Materials Producer Mining 1. Producing high purity (99.5%) graphite at 1. Development ready & one of the world’s largest commercial scale. Patent pending process for graphite project in Tanzania with offt

  31. Slide 31: Contact

    Contact Volt Resources Limited Level 25 108 St. Georges Terrace Perth WA 6000 P: +61 (0)8 9486 7788 E:info@voltresources.com 31

Volt Resources — Investor Presentation (August 2024) on 6ix