Mining Americas Inc. · TSX:MAI

Mining Americas — Minera Alamos — Metals Investor Forum – Virtual Conference (April 2020)

22 slides from Mining Americas's conference presentation, Apr 30, 2020

  1. Slide 1: Proven Mine Development Team

    Proven Mine Development Team Building The Next Mid-Tier Gold Mining Company Metals Investor Forum –Virtual Conference April 30th 2020 TSX-V: MAI

  2. Slide 2: Forward Looking Statements

    Forward Looking Statements This presentation contains certain “forward-looking statements”. All statements, other than statements of historical fact, that address activities, events or developments that Minera Alamos believes, expects or anticipates will or may occur in the future are forward-lookin

  3. Slide 3: Investment Thesis

    Investment Thesis Why invest in us? Multi-leveraged! We are We are at PROVEN BUILDERS DEVELOPMENT STAGE • 3 successful mines put into production in last 12 years • 100 % Owned Assets • Strong operational expertise in heap leach mining • 2 high-quality, open pit development-stage assets • Ability to

  4. Slide 4: Company snapshot

    Capital Structure Company snapshot Capital Structure Shareholder Distribution Ticker TSXV:MAI Osisko Gold Royalties 18.7% Share Price (as of April 29th, 2020) C$0.385 Retail & other 52.2% Donald Smith Value Basic Shares Outstanding 407.5M Fund 9.6% Options 25.9M Aegis Financial Warrants 2.8M 4.9% Fu

  5. Slide 5: Relative Performance

    Equity Performance Outperformance of Peer Group, Gold and GDXJ • Minera Alamos has outperformed each Minera Alamos Performance Versus Gold Price and Peers | Since June 1, 2019 of the GDXJ, gold price, and its peer group since June 1, 2019 300% • Minera Alamos saw ~81M warrants expire or be exercised

  6. Slide 6: Outperformance of Peer Group, Gold and GDXJ

    Equity Performance Outperformance of Peer Group, Gold and GDXJ Minera Alamos Performance Versus Gold Price and Peers | Since June 1, 2019 HRT -59% AUG -29% MAX 3% KOR 7% OSK 9% LUM 22% TML 30% MOZ 45% PGM 56% SBB 69% GOLD 91% OLA 215% LGD 255% MAI 267% -100% -50% 0% 50% 100% 150% 200% 250% 300% Sour

  7. Slide 7: Management & Board of Directors

    The Team Management & Board of Directors Darren Koningen • +20 years of engineering/metallurgical experience and led the development of Castle Gold’s El Castillo project prior to its sale to Argonaut CEO and Director • Designed, constructed, commissioned and operated two gold heap leach operations i

  8. Slide 8: High Quality Assets

    High Quality Assets Santana – 100% owned La Fortuna – 100% owned TSX-V: MAI

  9. Slide 9: Santana Project: Near-term production opportunity

    Santana Project Near-term production opportunity Low CAPEX (~C$10m) heap leach development project with bulk test mining completed and permits approved Location/Infrastructure • Sonora State, Mexico; 100% owned; 8,500 ha • Accessible by paved highway • 50 km SW of Alamos Gold’s 3M oz Mulatos Gold Mi

  10. Slide 10: Construction Funding Announced

    Economics Construction Funding Announced $14 Million Royalty/Equity Construction Announced December 2019 • $6 million equity financing with largest shareholder Osisko Gold Royalties increasing their stake in the Company from 12.5% to 18.7% (Completed) • Third consecutive straight share (no warrant)

  11. Slide 11: Construction Highlights

    Santana Project Construction Highlights Test Mining Completed • ~50,000 t mined • Recovered gold grade +0.67 g/t • Various crush sizes tested <1/2”-5/8” up to 3” resulting in consistent recoveries across test sizes • Excellent percolation eliminating the need for agglomeration Mine Construction • Co

  12. Slide 12: Construction Highlights

    Santana Project Construction Highlights Crushing, Screening & Agglomeration System Purchase • Design capacity of approximately 300 tph (5,000-6,000 tpd) taking run-of- mine (“ROM”) heap leach material and crushing/screening (three stage crushing) to a fine size passing 3/8” • The system will provide

  13. Slide 13: Phase 2 Exploration Results – Nicho Breccia Pipe

    Santana Project Phase 2 Exploration Results – Nicho Breccia Pipe Deepest and Longest Mineralized Intersection Drilled at Nicho – S20-134 Nicho Zone (Phase 2 Development Drilling) • Deepest test of Nicho pipe to date (vertical depth of Significant expansion of Nicho pipe on to the southwest and south

  14. Slide 14: Exploration potential

    Santana Project Exploration potential Potential to define a significant gold mineral district (>1-2MMoz potential) Divisadero Zone (2018 & 2019 Drilling Discovery) • Gold-silver discovery ~200m N of Nicho Norte ➢ 95.7 m @ 0.85 g/t Au, 9.8 g/t Ag Multiple targets; New discoveries; Actively being dril

  15. Slide 15: La Fortuna PEA – High Grade Open Pit

    La Fortuna Project PEA – High Grade Open Pit A high-grade, low-CAPEX open pit operation with significant resource expansion potential – Notice of Permit Approval received Location • Durango State, Mexico; 100% owned • ~6,200 ha Infrastructure • Easily accessible via a 100 km road from Culiacan, the

  16. Slide 16: PEA – Economic summary

    La Fortuna Project PEA – Economic summary Pre-Tax NPV (7.5%) US$103.8M Pre-Tax IRR After-Tax NPV (7.5%) 122% US$69.8M 93% After-Tax IRR 93% STRONG IRR After-Tax Pre-Tax Payback Period 9 months After-Tax Payback Period Ave. Annual Production 11 months 43k oz Au, 220K oz Ag 1,000 t Cu (50k oz AuEq) US

  17. Slide 17: Value Proposition

    Value Proposition TSX-V: MAI

  18. Slide 18: Path to a mid tier producer

    Growth Model Path to a mid tier producer >150,000K per annum Acquire 3rd Santana asset La Fortuna Expansion • Targeting +/- 700k quality ounces • Low Capex • Exploration driven expansion Santana • Large land package • Low Capex Build derived from ongoing drilling supported by royalty and • Significa

  19. Slide 19: Peer Gold Developer Comparables

    Equity Performance Peer Gold Developer Comparables Minera Alamos Peer Gold Developer Comparables • Minera Alamos currently trades at a discount to its peer group (0.52x to 1.20x 0.60x), indicating the strong re-rating potential and continued positive share price momentum, as it transitions from 1.00

  20. Slide 20: Execution – 2019 a springboard for this year's transition

    Real business in action Execution – 2019 a springboard for this year’s transition The secret to our success so far - Business “101” - When you say you are going to do something – do it! • Dealt with our legacy warrant overhang – no artificial warrant related cap moving forward • Permit Issuance – On

  21. Slide 21: Executing in 2020 – The Transition to Gold Producer

    Real business in action Executing in 2020 – The Transition to Gold Producer Santana Mine Construction Q1 – Q3 Santana- Start of Mining Operations Q4 Santana- Phase 2 Exploration Ongoing Q1 – Q4 La Fortuna - Permit Issuance / Finalize Debt Negotiations Q2 – Q3 Ongoing Evaluation of Near-Term Producti

  22. Slide 22: Thank you

    ~~ MINERA\ ALAMOS PS: ally TSX-V: MAI

Minera Alamos — Metals Investor Forum – Virtual Conference (April 2020) on 6ix