Paladin Energy Ltd · ASX:PDN

Paladin Energy — Macquarie Western Australia Forum 2021

32 slides from Paladin Energy's conference presentation, Dec 2, 2021

  1. Slide 1: Paladin - Ian Purdy, Chief Executive Officer

    PALADIN lan Purdy | Chief Executive Officer

  2. Slide 2: Disclaimer

    PALADIN Disclaimer This presentation contains summary information about the Company's activities current as at the date of this presentation. The information in this presentation is of a general background nature and does not purport to be complete or contain all the information investors would requ

  3. Slide 3: Paladin is Strategically Positioned

    Paladin is Strategically Positioned PALADIN Advanced Exploration Advanced Exploration Namibia Advanced — Exploration Mine on Care & Australia v Maintenance Strategic footprint in the Ready to fuel global Set to become a top 10 Over 365Mlb of U30g world’s most attractive uranium mining jurisdictions

  4. Slide 4: Paladin is a premium investment opportunity

    aladin is a premium investment opportunity PALADIN Ready for restart Upside pathways Commercial strength A sustainable future + Proven operational track record at Langer Heinrich Mine (LHM) with over 43Mlb of U3Og delivered to customers Fully permitted to resume mining, processing and uranium export

  5. Slide 5: Langer Heinrich Mine

    Langer Heinrich Mine 75% Paladin ownership

  6. Slide 6: Namibia location and jurisdiction

    LEGEND rani NAMIBIA REPUBLIC OF SOUTH AFRICA PALADIN Globally significant uranium province (Husab, Rossing and Langer Heinrich) and a major supplier of the world’s uranium when at full capacity Uranium has been produced in Namibia since 1976 under a stable mining and uranium regulation regime Mining

  7. Slide 7: Proven operational track record at Langer Heinrich Mine

    Proven operational track record at Langer Heinrich Mine with over 43Mlb of U3Og, delivered to customers Fully permitted to resume mining, processing and uranium exports Well defined Mine Restart Plan provides low risk path to production and competitive economics Located ina proven premier uranium mi

  8. Slide 8: Restart cost, life of mine cost and peak production

    PALADIN Cost to Restart Life of Mine C1 Peak Operations Cost of Production Production Restart Capital Intensity? | |

  9. Slide 9: Langer Heinrich Mine upside potential

    Langer Heinrich Mine upside potential Paladin will now focus attention on delivering further upside at LHM, through concept studies for potential value enhancement opportunities, including: Increased Mine life extension Resource Further cost production rate for through resource expansion optimisatio

  10. Slide 10: Exploration

  11. Slide 11: Globally significant high grade exploration portfolio

    PALADIN & Globally significant high grade exploration portfolio ) Extensive historical exploration activity has seen over US$140M spent on the portfolio — Wow Diverse portfolio of assets provides optionality on mining methods EN Langer Heinrich Mine operational infrastructure provides leverage Ci» a

  12. Slide 12: Large tenement holding securing the most prospective ground

    PALADIN + Large tenement holding securing the most prospective ground + Mineral Resource (M+l+1): 127.7Mlb at 860 ppm + USS75M of total historical in ground exploration + USS55M of historical in ground exploration + Emerging regional uranium ISR mining method province + Mineral Resource (M+l+1): 41.

  13. Slide 13: Exploration focus and strategic pathways

    Exploration focus and strategic pathways _* PALADIN Global portfolio Langer Heinrich Mine + Paladin’s current exploration focus includes: + Work plans are being established to extend + First principles review of proprietary mine life by: information comprising more than 30 years * Step-out drilling

  14. Slide 14: Uranium Market

  15. Slide 15: Structural supply deficit with growing demand

    Structural supply deficit with growing demand Structural Supply Shortage, TradeTech Mlb U2Og p.a. Returning Mine Production Secondary Supply mmm Existing Production —Reactor Requirements (Base Demand) 250 200 ee : Wi 2021 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 2035 101 S a

  16. Slide 16: Historic Term Contract Activity and Global Contracted Coverage

    PALADIN Historic Term Contract Activity Global Contracted Coverage Mlb pa % of base requirements =Non-U.S. Utilities mU.S. Utilities 300 250 200 15 100 one TLL a 2000 2002 2004 2006 2008 2010 2012 2014 2016 2018 2020 ry oe S&S ‘Source: UxC * Term contracting levels have been well below annual consum

  17. Slide 17: Recent uranium market activity

    Recent uranium market activity The Sprott Physical Uranium Trust has significantly changed the uranium Spot Market Dynamics + 22Mlb of physical uranium bought and sequestered + Impact of Sprott buying has tightened the spot uranium market and driven up the average spot price to ~US$46/lb in November

  18. Slide 18: Conclusion

  19. Slide 19: Nuclear and reducing carbon emissions

    PALADIN Uranium mining and processing are critical components of the nuclear fuel cycle as they provide the raw material for producing clean, sustainable base-load electricity. With the growing global demand for electricity, and the targets for CO, emissions, nuclear energy will continue to play a k

  20. Slide 20: About Paladin

  21. Slide 21: Meet the Board and CEO

    Meet the Board and CEO Cliff Lawrenson Non-Executive Chairman Mining executive with deep expertise in the minerals and energy sectors derived from global experience having worked extensively in project development and investment banking. A successful track record of leading strategic direction in co

  22. Slide 22: The Executive Team

    The Executive Team Anna Sudlow Chief Financial Officer Corporate finance professional with 25 years’ experience across the energy and resources sectors in senior management roles. Her experience includes funding execution, commercial management, accounting, finance and treasury in both the ASX liste

  23. Slide 23: Langer Heinrich Mine historical performance parameters

    Langer Heinrich Mine historical performance parameters FY2013 FY2014 FY2015 FY2016 FY2017 FY2018 Mining Rate (in-situ) Mt 27.8 21.6 20.2 24.6 7.6 0.0 Mill Throughput Mt 3.44 3.72 3.40 3.57 3.52 2.95 Mill Feed Grade ppm 812 783 768 699 610 475 Recovery % 86.0% 87.0% 87.6% 86.3% 87.7% 88.5% U30g Produ

  24. Slide 24: Life of mine production and C1 cost

    PALADIN Mining & Stockpile Re-handling!:2 10.8 7) 700 : Processing & Maintenance 14.4 6 600 G&A and Other 2.2 Ltt | { 00 i Ci Cost of Production 27.4 i a Freight & Logistics 1.0 : 00 Capex? 3.2 : 00 Government Royalties+ 3% 1 00 Export Levy® 0.25% Excludes stockpile inventory adjustments byt ¥2 Y3 Y

  25. Slide 25: LHM Ramp Up Phase

    PALADIN KO Ramp Up Phase - Targeted reliability improvements will ramp up to deliver 95% runtime ; Mining Rate (total material movement Mt pa)? 0 27.0 0 + Processing medium grade i stockpile at 508 ppm grade Mill throughput (Mt pa) 3.5 5.4 5.5 i (from stockpile) (from stockpile) Mining Phase i Mill

  26. Slide 26: Langer Heinrich processing plant

    CO OPNAAAwWNo Primary Cyclones Leach Feed Surge Tanks Steam Injectors Thickener Feed Wells Tailings Dewatering Tailings Line NamWater Supply Swakop River Supply Centralised Control Room . Product Thickener Sodium Diuranate Overflow Filter . FRP Drying & Packaging . ROM Bin & Chutes . Scrubbers & Fee

  27. Slide 27: Sustainability commitment

    ustainability commitment PALADIN Paladin is committed to the core principle of delivering value through sustainable development. Our Paladin Values support every decision we take. With these strong foundations, we can focus on achieving economic, social and environmental sustainability in balanced a

  28. Slide 28: Sustainability performance indicators

    PALADIN 1,507 Lost Time Injury | 0 Reportable incidents 100% Permits in place 100% Achievement of 100% of Paladin The proportion of Free Days! in 2021 for leases, mining and Lead Safety Indicators workforce is local to women in roles in the export operations Paladin Group is 30%

  29. Slide 29: Summary Updated Mineral Resources and Ore Reserves

    Summary Updated Mineral Resources1 Summary Updated Ore Reserves1

  30. Slide 30: Mineral Resources Table - Canadian Exploration portfolio

    Mineral Resources Table — Canadian Exploration portfolio “_..? PALADIN Mlb Us\ Mineral Resources rade ppm U3Os (100% bi Measured Michelin! 17.6 965 37.6 65 Rainbow" 0.2 920 0.4 65 Indicated Gear? 0.4 770 0.6 65 Inda? 1.2 690 1.8 65 Jacques Lake! 13.0 630 18.0 65 Michelin! 20.6 980 44.6 65 Nash? 0.7

  31. Slide 31: Mineral Resources Table - Australian Exploration portfolio

    PALADIN Measured Valhalla’ 28.9 100 Indicated Andersons” 14 1,450 4.6 100 Bikini? 5.8 495 6.3 100 Duke Batman? 0.5 1,370 1.6 100 Odin? 8.2 555 10.0 100 Skalé 14.3 640 20.2 100 Valhalla! 18.6 840 34.5 100 Carley Bore” 5.4 420 5.0 100 Manyingee® 8.4 850 15.7 100 Inferred Andersons” 04 1,640 0.4 100 Bi

  32. Slide 32: Contact details

    Level 8 191 St Georges Terrace WA 6000 +618 9423 8100 ‘PALADIN Clean energy. Clear future. paladinenergy.com.au

Paladin Energy — Macquarie Western Australia Forum 2021 on 6ix