Dynegy — Investor Presentation (June 2012)
69 slides from Dynegy's investor presentation, Jun 25, 2012
Slide 1: Dynegy: A Company Review
Dynegy: A Company Review Dynegy Management Team June 2012
Slide 2: Forward-Looking Statements
Forward-Looking Statements 2 Cautionary Statement Regarding Forward-Looking Statements This presentation contains statements reflecting assumptions, expectations, projections, intentions or beliefs about future events that are intended as “forward looking statements.” You can identify these statemen
Slide 3: Agenda
Agenda 3 Opening Remarks Bob Flexon, President and Chief Executive Officer Portfolio Overview Kevin Howell, Executive Vice President and Chief Operating Officer Operations CoalCo Dan Thompson, Vice President – CoalCo Operations GasCo Marty Daley, Vice President – GasCo Operations Commercial Kevin Ho
Slide 4: Our Management Team
Carolyn Burke EVP and Chief Administrative Officer Prior Experience: J.P. Morgan – Global Controller, Commodities NRG Energy – VP & Corporate Controller, Financial Planning & Analysis Catherine Callaway EVP, General Counsel and Chief Compliance Officer Prior Experience: NRG Energy – General Counsel,
Slide 5: Our Asset Portfolio
Gas Segment Coal Segment Portfolio Characteristics 6,771 mws of which 4,404 mws are natural gas-fired combined-cycle generation Modern, efficient fleet adaptable to baseload or intermediate operations 2,980 mws coal fired generation located in Illinois Over $1 billion invested in environmental contr
Slide 6: What Makes Dynegy's Portfolio Unique
What Makes Dynegy’s Portfolio Unique 6 Positioned to generate positive cash flow in both high and low gas price environments When natural gas prices fall: When natural gas prices rise: The combined-cycle fleet expected to benefit from higher dispatch rates, displacing eastern coal-fired generation b
Slide 7: Dynegy: A Well-Built Foundation for Future Growth
Dynegy Value Drivers 7 Dynegy's restructured balance sheet provides a strong foundation for success Commercial Fuel procurement and transportation expertise Commercial operations designed to protect and optimize cash flows Regulatory Regulatory effort advocating appropriate market design Involvement
Slide 8: Portfolio Overview
Portfolio Overview DYNEGY
Slide 9: Coal and Gas Segments - Safety Remains Primary Area of Focus
Coal and Gas Segments - Safety Remains Primary Area of Focus 9 Total Recordable Incident Rates (TRIR) Accountability, Communication, Execution (ACE) program launched company-wide Plant safety committees are raising their involvement LTIR and TRIR are below our goal and will continue receiving manage
Slide 10: Dynegy's Diversified Asset Portfolio
Dynegy’s Diversified Asset Portfolio 10 11,596 MW Dispatch Diversity Peaking 25% Intermediate 44% Baseload 31% Geographic Diversity Midwest 44% Northeast 22% West 34% Gas Segment Coal Segment DNE Note: Roseton and Danskammer assets not included in the graphs due to upcoming sales process Fuel Divers
Slide 11: Coal versus Combined Cycle – Dispatch Economics
11 Coal versus Combined Cycle – Dispatch Economics (1) Coal prices based on 2013 ICAP prices as of 5/31/2012 and internal estimates for rail costs. Delivered gas price based on $3.00 Henry Hub plus basis. VO&M based on Velocity Suite-Ventyx/internal estimates Hennepin Havana Wood River Baldwin Illin
Slide 12: Operations Overview - Coal Segment
Operations Overview- Coal Segment
Slide 13: Coal Segment Fleet Overview
Coal Segment Fleet Overview 13
Slide 14: Coal Plant Basics
Coal Segment Coal Plant Basics Coal Supply Conveyor Coal Bunker Coal Mill Boiler Steam Line Turbine Generator Cooling Water River/Reservoir Selective Catalytic Reduction Air Handler Electrostatic Precipitator Activated Carbon Injection Dry Scrubber Lime Slurry Injection Baghouse Forced Draft Fan Ind
Slide 15: Coal Segment Well-Positioned in MISO
Coal Segment Well-Positioned in MISO Position on dispatch curve provides leverage in rising gas markets 15 Dispatch curve gets steeper as natural gas prices increase Max 2011 load: 103,730 Average 2011 load: 64,702 Min 2011 load: 41,500 0 10 20 30 40 50 60 0 20,000 40,000 60,000 80,000 100,000 120,0
Slide 16: Coal Segment Strong In-Market Availability
Coal Segment Strong In-Market Availability (IMA) 16 YTD May 2012: 93% 2011: 92% 2012 Target 2012 Target: 90% IMA Margin Performance As of May 31, 2012 2012 YTD 2011
Slide 17: Coal Segment Cost Structure
Coal Segment Cost Structure Dynegy’s coal fleet burns 100% Powder River Basin Existing rail agreement expires 2013; negotiations underway PRIDE efforts target future cost improvements Dynegy completes its Consent Decree environmental requirements in 2012 Future environmental spend is for maintenance
Slide 18: Coal Segment Environmental Compliance Plan
18 Coal Segment Environmental Compliance Plan CSAPR HAPs/MACT CCR 316(b) Anticipate effective in 2013 Effective April 2015 Anticipate final rule - 2013 Anticipate final rule - 2012 Baldwin 1 Allowances exceed emissions Expected to meet limits Ash pond Under review Baldwin 2 Allowances exceed emissio
Slide 19: Coal Segment Environmental Equipment
Coal Segment Environmental Equipment 19 SO2 NOx Mercury Particulate Matter Dry Scrubber Low NOx burners Overfire Air SCR Injection/Oxidation Systems Electrostatic Precipitator High Efficiency Baghouse Baldwin 1 P P P P P P Baldwin 2 (1) P P P P P P Baldwin 3 P P P P P P Havana 6 P P P P P P P Hennep
Slide 20: Operations Overview – Gas Segment
Operations Overview – Gas Segment
Slide 21: Gas Segment Fleet Overview
Gas Segment Fleet Overview 21 Casco Bay Independence Ontelaunee Kendall Morro Bay Moss Landing/ Oakland CCGT ISO-NE 540 mws CCGT NYISO 1,064 mws CCGT PJM 580 mws CCGT PJM 1,200 mws Peaker CAISO 650 mws CCGT/Peaker CAISO 1,020/1,674 mws
Slide 22: Gas Segment Combined-Cycle Plant Basics
Gas Segment Combined-Cycle Plant Basics 22 2 6 1 4 5 3 8 11 9 7 13 12 10 14 Natural Gas Supply Air Intake Gas Turbine (2) Generator (2) Boiler Ammonia Injections to Selective Catalytic Reduction Stack Steam Line Steam Turbine Generator Cooling Towers Heat Exchanger (optional) Hot H2O to Industrial C
Slide 23: PJM: Lower Natural Gas Brings Coal-to-Gas Switching
Gas Segment PJM: Lower Natural Gas Brings Coal-to-Gas Switching 23 Combined-cycle units displace more expensive coal units Combined-cycle units have seen increased dispatch as natural gas prices have fallen Max 2011 load: 158,043 Average 2011 load: 84,442 Min 2011 load: 50,645 0 10 20 30 40 50 60 70
Slide 24: CCGTs: Strong In-Market Availability and Capacity Factors
Gas Segment CCGT’s: Strong In-Market Availability and Capacity Factors 24 YTD May 2012: 96% 2011: 94% Strong In-Market Availability (IMA) performance despite increased runtimes Coal-to-gas switching has led to increased runtimes in off-peak and shoulder hours Less cycling of units should improve rel
Slide 25: Gas Segment Cost Structure
Gas Segment Cost Structure O&M cost control initiatives at fleet and plant levels (PRIDE) Fuel cost control through plant operations projects, heat-rate improvements, start fuel savings project and minimum generation reductions at several plants Increasing efficiency in an already efficient fleet 25
Slide 26: Gas Segment Environmental Compliance Plan
Gas Segment Environmental Compliance Plan 26 CSAPR 316(b) NY NOx RACT Rule CA Water Intake Policy AB32 Anticipate effective in 2013 Anticipate final rule - 2012 Effective July 1, 2014 Effective 2013 Casco Bay N/A Facility has closed cycle cooling, but minor modifications may be required N/A N/A N/A
Slide 27: Commercial
Commercial DYNEGY
Slide 28: Commercial Fuel Procurement
Commercial Fuel Procurement 28 Coal Supply and Transport Hedged – Coal Segment (as of 6/18/12) Gas Supply Hedged – Gas Segment (as of 6/18/12) 2013 coal supply is contracted and hedged with a collar option Powder River Basin prices less volatile than other fuel commodities Current rail transportatio
Slide 29: Commercial Power Hedging Strategy
Coal Assets Sell Power Swaps Manages downside price risk Limits upside if power prices increase Options Strategies Manage downside price risk Retains upside in portfolio Power Basis Risk Hedge at closest liquid trading hub Indy Hub – closest to plants; expect liquidity improvement in future Also tra
Slide 30: 2013 Power and Spark Spread Pricing Trends
Commercial 2013 Power and Spark Spread Pricing Trends 30 2013 power prices have traded within a relatively narrow range along with natural gas 2013 gas prices have been impacted by coal-to-gas switching economics Gas to power price correlations have declined with expanding market implied heat rates
Slide 31: Regulatory
Regulatory DYNEGY
Slide 32: Overview of Regulatory Framework
Overview of Regulatory Framework 32 Key Policy Makers Federal State Regional Executive: White House Governors’ Offices Legislative: Congress State Legislatures Judicial: US District Court State Courts Regulatory: FERC PUCs ISOs EPA DEPs The Regulatory framework in which we operate is highly complex
Slide 33: EPA Regulatory Roadmap
EPA Regulatory Roadmap Develop MATS Compliance with MATS (new sources) Likely 4th year based on broad latitude given to states Compliance with MATS (existing sources) Develop CSAPR CSAPR stayed Potential compliance with CSAPR depending on outcome of litigation Interim CAIR (CSAPR to replace Interim
Slide 34: Dynegy's Priority Regulatory Issues
Dynegy’s Priority Regulatory Issues 34 Dynegy’s regulatory advocacy role focused on highest impact issues Revenue Drivers Cost Drivers Market Design Advance market designs that support competitive markets, particularly a capacity market design similar to PJM Generator Retirements Advocate retirement
Slide 35: MISO – Pursuing an Ideal Market Design
MISO – Pursuing an Ideal Market Design 35 Northern IL = PJM Exelon (ComEd) joined PJM Exelon’s companies operate in states (IL and PA) with deregulated, competitive industry structure PJM has attractive wholesale capacity market design: Capacity Market (RPM) Transparent retirement process PJM partic
Slide 36: Generator Retirements
Generator Retirements 36 Significant amount of generation expected to retire by 2015: Dynegy to proactively advocate for a level playing field MW and approximate percentage of total capacity(1) CAISO PJM NYISO ISO-NE MISO 1,000-2,300 (2-3%) 10,000-19,700 (5-10%) 1,000 – 2,000 (2-3%) 1,000-1,500 (2-3
Slide 37: Cost Drivers: Coal Ash and OTC
Federal EPA proposed rules could potentially designate coal ash as hazardous and limit use of wet ash ponds Final rules are expected by 2013/2014 with compliance by ~2018 Current IL EPA initiative focus on accelerating ash pond closings Two ash ponds at Vermilion (retired) to be closed between 2013
Slide 38: Financial Overview
Financial Overview DYNEGY
Slide 39: PRIDE - Driving EBITDA improvements and adding liquidity
39 Fixed Cash Cost Gross Margin Balance Sheet 2012 Target of $452M is $26M below 2011 Actual and $84M below 2010 Actual Approximately 25% in staffing reductions since 2010 Targeted Opex reductions related to CoalCo activated carbon usage, reduced franchise taxes, and continued procurement initiative
Slide 40: Impact of New Cost Structure – What If
Impact of New Cost Structure – What If 40 Go Forward Breakeven Natural Gas Price 2013 Adjusted EBITDA $1.60 - $1.70 Free Cash Flow $3.25 - $3.35 ~$154 million increase in Adjusted EBITDA and Cash Flow ~$312 million increase in Cash Flow... Cost structure improvement leads to Note: Forecasted numbers
Slide 41: Economic Drivers: Avenues to Achieving > $500mm Adjusted EBITDA
Economic Drivers: Avenues to Achieving > $500mm Adjusted EBITDA $320MM 2015 Adjusted EBITDA (Disclosure Statement) Natural Gas Prices (+/- $1 = ~$150MM) Coal Transport Contract Tolls Heat Rates (+/- .5HR = ~$35MM) 2015 Adjusted EBITDA (Potential) Adjusted EBITDA ($MMs) Multiple avenues for potential
Slide 42: Capital Structure at Emergence
Capital Structure at Emergence 42 Note: Above chart represents an abbreviated organizational structure; all cash estimates based on 5/4/2012 cash balances disclosed in Dynegy’s Q1 form 10-Q less $100 million in transaction costs and $200 million in payments to creditors. Restricted cash consists sol
Slide 43: Refinancing Options
OPTION 1 OPTION 2 OPTION 3 Leave Opco term loans in place; establish Opco-level revolvers Refinance term loans at Opco level; establish Opco-level revolvers Refinance at parent company level and establish corporate revolver ADVANTAGES Maintain parent-level financial flexibility Significant restricte
Slide 44: Financial Approach to Cyclical Natural Gas Price Environment
44 Positioning Dynegy for success throughout the commodity cycle Financial Approach to Cyclical Natural Gas Price Environment High natural gas... Low natural gas Financial discipline in low gas price environment to position for improvements in market prices:
Slide 45: Summary and Discussion
Summary and Discussion DYNEGY
Slide 46: Dynegy: The Value Proposition
Dynegy: The Value Proposition 46 Dynegy: A Uniquely Positioned Independent Power Producer Dynegy’s modern, adaptable gas fleet and environmentally compliant coal fleet distinctively position the Company to be successful in both low and high gas markets supported by: Post-restructuring balance sheet
Slide 47: Appendix
Appendix DYNEGY
Slide 48: Coal Segment Baldwin
Coal Segment Baldwin 48 PJM Service Area MISO Reliability Area Baldwin Performance Snapshot Year Capacity Factor In-Market Availability Equivalent Availability Factor 2009 78% 89% 85% 2010 81% 89% 83% 2011 85% 92% 88% Plant Characterics... Unit 1 Unit 2 Unit 3 Capacity (MW) 600 600 600 Fuel Type Coa
Slide 49: Coal Segment Wood River
Coal Segment Wood River 49 PJM Service Area MISO Reliability Area Wood River Performance Snapshot Year Capacity Factor In-Market Availability Equivalent Availability Factor 2009 67% 93% 92% 2010 90% 93% 94% 2011 85% 93% 92% Plant Characteristics... Unit 4 Unit 5 Capacity (MW) 90 356 Fuel Type Coal C
Slide 50: Coal Segment Havana
Coal Segment Havana 50 PJM Service Area MISO Reliability Area Havana Performance Snapshot Year Capacity Factor In-Market Availability Equivalent Availability Factor 2009 53% 91% 72% 2010 80% 90% 91% 2011 78% 88% 89% Plant Characteristics... Unit 6 Capacity (MW) 441 Fuel Type Coal Heat Rate (btu/kWh)
Slide 51: Coal Segment Hennepin
Coal Segment Hennepin 51 PJM Service Area MISO Reliability Area Hennepin Plant Characteristics... Unit 1 Unit 2 Capacity (MW) 70 223 Fuel Type Coal Coal Heat Rate (btu/kWh) 11,168 9,894 Commercial Operation 1953 1959 Scrubber No No SCR No No Carbon Injection Yes Yes Baghouse Yes Yes Performance Snap
Slide 52: Coal Segment Consent Decree
52 Coal Segment Consent Decree 2010 2011 2012 Baldwin 3 Baldwin 1 Baldwin 2 Projects complete Estimated total capital expenditures of ~$945 million Estimated remaining cash spend of ~$57 million as of 1Q12 ~$54 million cash spend in 2012; ~$3 million cash spend in 1Q2013 Estimated go forward cost co
Slide 53: Gas Segment Tolling, Capacity and Other
Gas Segment Tolling, Capacity and Other 53 Tolling Agreements Plant Contract Type Size (MW) Tenor Moss Landing 6&7 Tolling Agreement 1,509 Through 2013 Oakland RMR 165 Through Dec-2012 Independence Steam & Energy 44 Through Jan-2017 Kendall Tolling Agreement 50-85 Through Sep-2017 Capacity / Resourc
Slide 54: Gas Segment Casco Bay
54 Gas Segment Casco Bay Casco Bay Unit 1 Capacity (MW) 538 Heat Rate (MMBtu/KWH) 7,000 Commercial Operation 2000 Turbine Manufacturer GE Boiler Manufacturer ABB Transmission Voltage (KV) 345 ISO ISO-NE Fuel Gas Fuel Delivery Maritime/DRACUT Performance Snapshot Year Capacity Factor In-Market Availa
Slide 55: Gas Segment Independence
55 Gas Segment Independence Independence Unit 1 Unit 2 Capacity (MW) 532 532 Heat Rate (MMBtu/KWH) 7,200 7,200 Commercial Operation 1994 1994 Turbine Manufacturer GE GE Boiler Manufacturer Vogt Vogt Transmission Voltage (KV) 345 345 ISO NYISO - C NYISO - C Fuel Gas Gas Fuel Delivery TransCanada Tran
Slide 56: Gas Segment Kendall
Gas Segment Kendall 56 PJM Service Area MISO Reliability Area Kendall Performance Snapshot Year Capacity Factor In-Market Availability Equivalent Availability Factor 2009 19% * 95% 2010 17% 92% 90% 2011 22% 98% 93% Plant Characteristics... Unit 1 Unit 2 Unit 3 Unit 4 Capacity (MW) 300 300 300 300 Fu
Slide 57: Gas Segment Morro Bay
57 Gas Segment Morro Bay Performance Snapshot Year Capacity Factor In-Market Availability Equivalent Availability Factor 2009 5% * 98% 2010 2% * 93% 2011 2% * 97% UNIT 3 UNIT 4 Capacity (MW) 345 345 Heat Rate (MMBtu/kWh) 9,400 9,400 Commercial Operation 1962 1963 Turbine Manufacturer West West Boile
Slide 58: Gas Segment Moss Landing
58 Gas Segment Moss Landing Performance Snapshot Year Capacity Factor In-Market Availability Equivalent Availability Factor 2009 41% * 88% 2010 36% 93% 90% 2011 19% 89% 86% UNIT 1 UNIT 2 UNIT 6 UNIT 7 Capacity (MW) 510 510 754 755 Heat Rate (MMBtu/kWh) 7,092 7,092 9,800 9,800 Commercial Operation 20
Slide 59: Gas Segment Oakland
59 Gas Segment Oakland Performance Snapshot Year Capacity Factor In-Market Availability Equivalent Availability Factor 2009 1% * 96% 2010 1% * 98% 2011 0% * 99% UNIT 1 UNIT 2 UNIT 3 Capacity (MW) 55 55 55 Heat Rate (MMBtu/kWh) 14,155 14,155 14,155 Commercial Operation 1978 1978 1978 Turbine Manufact
Slide 60: Gas Segment Ontelaunee
Gas Segment Ontelaunee 60 PJM Service Area MISO Reliability Area Ontelaunee Performance Snapshot Year Capacity Factor In-Market Availability Equivalent Availability Factor 2009 44% * 88% 2010 47% 92% 86% 2011 56% 94% 84% Plant Characteristics... Unit 1 Capacity (MW) 580 Fuel Type NG Heat Rate (btu/k
Slide 61: Gas Segment – CAISO Generation Stack
Gas Segment – CAISO Generation Stack 61 Max 2011 load: 34,290 Average 2011 load: 24,697 Min 2011 load: 18,463 0 10 20 30 40 50 60 70 80 0 10,000 20,000 30,000 40,000 50,000 60,000 Total Variable Production Cost ($/MWh) Cumulative Capacity MW CAISO Genstack: $3.00 Gas COAL GAS PETRO OTHER NUC WATER R
Slide 62: Gas Segment – ISO-NE Generation Stack
Gas Segment – ISO-NE Generation Stack 62 Max 2011 load: 27,329 Average 2011 load: 14,485 Min 2011 load: 8,089 0 10 20 30 40 50 60 70 80 0 5,000 10,000 15,000 20,000 25,000 30,000 Total Variable Production Cost ($/MWh) Cumulative Capacity MW ISO - NE Genstack: $3.00 Gas COAL GAS PETRO OTHER NUC WATER
Slide 63: Gas Segment – NYISO Generation Stack
Gas Segment – NYISO Generation Stack 63 Max 2011 load: 33,865 Average 2011 load: 18,645 Min 2011 load: 12,147 0 10 20 30 40 50 60 70 80 90 100 0 5,000 10,000 15,000 20,000 25,000 30,000 35,000 Total Variable Production Cost ($/MWh) Cumulative Capacity MW NYISO Genstack: $3.00 Gas COAL GAS PETRO OTHE
Slide 64: Danskammer
64 Danskammer Danskammer Unit 1 Unit 2 Unit 3 Unit 4 Capacity (MW) 65 61 137 232 Heat Rate (MMBtu/KWH) 12,000 12,000 9,800 9,900 Commercial Operation 1951 1954 1959 1967 Turbine Manufacturer GE GE GE GE Boiler Manufacturer CE CE CE CE Transmission Voltage (KV) 115 115 115 115 ISO NYISO - G NYISO - G
Slide 65: Roseton
65 Roseton Roseton Unit 1 Unit 2 Capacity (MW) 605 605 Heat Rate (MMBtu/KWH) 10,500 10,500 Commercial Operation 1974 1974 Turbine Manufacturer GE GE Boiler Manufacturer CE CE Transmission Voltage (KV) 345 345 ISO NYISO -G NYISO -G Fuel Gas/Oil Gas/Oil Fuel Delivery Iroquois/CH Iroquois/CH
Slide 66: Guidance and Projections Notice
In light of the current restructuring efforts that may affect the company’s strategic plans, Dynegy does not intend to provide guidance estimates for 2012. Further, we have not updated nor do we intend to update, or otherwise revise, the financial projections (the “Projections”) provided in Dynegy’s
Slide 67: ProForma Capitalization
Capitalization as of 5/4/2012 Face Value At Market(1) ProForma Capitalization ($ in mm) Secured Debt $1,692 Secured Debt $1,692 Unsecured Debt 3,370 2,112 Unsecured Debt 0 Subordinated Debt 200 31 Subordinated Debt 0 Lease Settlement(2) 660 422 Lease Settlement 0 Total Debt $1,692 Market Cap 69 69 E
Slide 68: Adjustments to EBITDA
Adjustments to EBITDA through 12/31/2011 Mark-to-Market revenue/expense One-time expenses related to potential mergers, bankruptcy, reorganization, restructuring expenses and separation contracts Non-cash extraordinary items, including impairments Change in Adjusted EBITDA Methodology 68 Adjustments
Slide 69: Dynegy Generation Facilities
69 Dynegy Generation Facilities Portfolio/Facility(1) Location Net Capacity(2) Primary Fuel Dispatch Type Market Region Coal Baldwin Baldwin, IL 1,800 Coal Baseload MISO Havana(3) Havana, IL 441 Coal Baseload MISO Hennepin Hennepin, IL 293 Coal Baseload MISO Wood River Units 4-5 Alton, IL 446 Coal B