Norsk Hydro Asa · OSL:NHY

Norsk Hydro Asa — Investor Day (2005)

33 slides from Norsk Hydro Asa's investor day presentation, 2005

  1. Slide 1: Oil & Energy

    Oil & Energy Tore Torvund Executive Vice President and Head of Oil & Energy

  2. Slide 2: Agenda

    Agenda z Status targets z Growing asset base z Beyond 2010 z Sources of production growth z Targets 2006 2

  3. Slide 3: Performance

    Performance CMD 2004 2005 estimate Production target 575 000 boed 565 000 boed Production cost NOK 21/boe* NOK 20/boe* CAPEX level NOK 16 billion NOK 13.5 billion** Exploration level NOK 2 billion NOK 2.1 billion** * Excluding costs for gas injection (CMD 2004 assumption: NOK 3, current realised est

  4. Slide 4: 2006 production target: 615 000 boed

    2006 production target: 615 000 boed 700 600 500 400 300 200 100 0 CMD 2004 Partner-operated PSA effects Spinnaker 4

  5. Slide 5: Oil and gas: Reserves and resources

    Oil and gas: Reserves and resources Million boe Hydro share 4 000 3 500 3 000 2 500 2 000 1 500 1 000 500 0 Proven reserves year- Additional expected Production 2005E Added expected Additional expected end 2004 (SEC) reserves year-end 2004 reserves 2005E* resources in portfolio ** * Including Spinna

  6. Slide 6: Additional expected resources in portfolio

    Additional expected resources in portfolio 1 000 Million boe Hydro share in fields and discoveries International 750 Murzuq NC190 – Block 17 Under Partner-operated NCS Snorre IOR – Lavrans – Eldfisk – Ekofisk evaluation Operated NCS Peon – Astero – Troll Brent – Osberg/Troll/Grane IOR International

  7. Slide 7: Hydro E&P activity

    Hydro E&P activity Russia Norway Denmark Canada Iran Libya US Gulf of Mexico Nigeria Brazil Angola Current E&P activity 7

  8. Slide 8: Exploration competence developed on NCS

    Exploration competence developed on NCS Discoveries on NCS 1985-2005 Million boe Hydro operator Other NCS operators Troll Oil Saga Petroleum 0 2 000 4 000 6 000 8 000 10 000 Reserves including 49 producing fields, 13 closed, 5 under development and 19 planned and discoveries in 1997-2005 Source: NPD

  9. Slide 9: Rig coverage provides flexibility

    Rig coverage provides flexibility z Rig capacity secured on Norwegian Continental Shelf through 2009 z Transocean Winner contracted for three years z Rig slots secured in Gulf of Mexico and West Africa 9

  10. Slide 10: Long-term commitment to Russia

    Long-term commitment to Russia z Shtokman short list z 15 years of cooperation z Preparing to drill Well 7 in 2006 10

  11. Slide 11: Pioneer in new technology

    Pioneer in new technology Planning ahead for Increased Oil Recovery Oseberg: Increased oil recovery - gas injection 11

  12. Slide 12: Pioneer in new technology

    Pioneer in new technology Planning ahead for Increased Oil Recovery Troll: Increased oil recovery - horizontal wells 12

  13. Slide 13: Pioneer in new technology

    Pioneer in new technology Planning ahead for Increased Oil Recovery Grane: Increased heavy oil recovery - gas injection and horizontal wells 13

  14. Slide 14: Pioneer in new technology

    Pioneer in new technology Planning ahead for Increased Oil Recovery Chinook: Increasing heavy oil recovery - horizontal wells 14

  15. Slide 15: On time and on cost

    On time and on cost Offshore projects last five years Average project size Total cost change NOK billion % Hydro Hydro Hydro operator Other operators 0 5 10 15 20 -10% 0% 10% 20% 30% 40% Offshore projects with budgets exceeding NOK 1 billion Source: MPE; St. prop. 1 2000- 2005 15

  16. Slide 16: Norwegian operations: Hydro's bread and butter

    Norwegian operations: Hydro’s bread and butter z Strong focus on safe, efficient and smart operations z Consistent top-quartile performer z Basis for future growth 16

  17. Slide 17: Drilling excellence drives value creation

    Drilling excellence drives value creation z Early mover in drilling technology z 47 multilateral wells drilled with 76 branches z 50% of the world’s advanced multilateral wells z 88% of the world’s advanced offshore multilateral wells z First six-branched well on NCS started Dec 2005 17

  18. Slide 18: Extending production growth through 2010

    Extending production growth through 2010 Oil and gas production 1 000 boe/day z Top-quartile growth continues 800 - In oil - In gas - On NCS 600 - Internationally z Robust growth 400 - 85% sanctioned projects - Low break-even prices 200 z Growing international share - Higher after-tax value per barr

  19. Slide 19: International breakthrough: Canada, Hebron

    International breakthrough Canada: Hebron moving toward development 19

  20. Slide 20: International breakthrough: Iran

    International breakthrough Iran: World-class oil discovery 20

  21. Slide 21: International breakthrough: Shtokman

    International breakthrough Штокмановского ГКМ: Shtokman short-listing 21

  22. Slide 22: International breakthrough: Angola, Gimboa

    International breakthrough Angola: Moving ahead with Gimboa (Block 4) 4 22

  23. Slide 23: International breakthrough: Libya

    International breakthrough Libya: Secured operatorship in NC146 23

  24. Slide 24: International breakthrough: Brazil, Chinook

    International breakthrough Brazil: Chinook heavy oil 24

  25. Slide 25: International breakthrough: GoM, Spinnaker

    International breakthrough GoM: Spinnaker Exploration Company 25

  26. Slide 26: Exploration acreage secured worldwide

    International breakthrough Exploration acreage secured worldwide NCS Barents Sea/ Russia Americas Middle East Africa Current E&P activity Frontier E&P activity 26

  27. Slide 27: Maximize NCS value

    Barents Sea Maximize NCS value z Large IOR potential z 15 new fields under development Norwegian Sea z Exploration success z About 40 exploration wells 2006-2007 North Sea 27

  28. Slide 28: Increased value of gas portfolio

    Increased value of gas portfolio NCS St.Fergus NBP Bacton Emden TTF ZB/hub PEG 28

  29. Slide 29: 2006 targets

    2006 targets z Production target 615 000 boe/day z Production costs NOK 23/boe* z CAPEX level NOK 20 billion z Exploration level NOK 5 billion ` Excluding costs for gas injection 29

  30. Slide 30: New fields on stream 2005 - 2008

    New fields on stream 2005 - 2008* Field Hydro peak production (boe/day) Peak year 2003 2004 2005 2006 2007 2008 International Lorien 9 000 2007  Dalia 24 000 2007  Rosa 13 000 2008    Oseberg South J 3 500 2006  Oseberg Vestflanken 15 500 2007  Oseberg Sør J Sentral 2 000 2009  Operator NCS

  31. Slide 31: Investor Relations in Hydro

    Investor Relations in Hydro

  32. Slide 32: Investor Relations in Hydro

    Investor Relations in Hydro t +47 22 53 32 73 Idar Eikrem Senior Vice President Idar.Eikrem@hydro.com m +47 950 28 363 t +47 22 53 24 55 Gudmund Isfeldt Investor Relations Officer Gudmund.Isfeldt@hydro.com m +47 480 01 180 t +47 22 53 35 39 Stefan Solberg Investor Relations Officer Stefan.Solberg@hy

  33. Slide 33: Hydro is a Fortune energy and aluminium supplier

    Hydro is a Fortune 500 energy and aluminium supplier founded in 1905, with 36,000 employees in nearly 40 countries. We are a leading offshore producer of oil and gas, the world's third-largest integrated aluminium supplier and a pioneer in renewable energy and energy- efficient solutions. As we look

Norsk Hydro — Investor Day (2005) on 6ix