Slide 1: Alto Chicama Feasibility Update
BARRICK GOLD CORPORATION Denver Gold Forum – Alto Chicama Update September 2003 ALTO CHICAMA FEASIBILITY UPDATE Denver Gold Forum – September 24, 2003 INTRODUCTION Alto Chicama was discovered in the second half of 2001 through grassroots exploration by Barrick Since the discovery, 130,000 meters
Slide 2: Alto Chicama Update Agenda
BARRICK GOLD CORPORATION Denver Gold Forum – Alto Chicama Update September 2003 ALTO CHICAMA UPDATE AGENDA Project overview Administration Geology Capital Processing Environmental Mining Regional exploration ALTO CHICAMA FEASIBILITY UPDATE – SEPTEMBER 2003 Overview Geology Process Mi
Slide 3: Project Location
BARRICK GOLD CORPORATION Denver Gold Forum – Alto Chicama Update September 2003 Overview Geology Process Mining Admin. Capital Enviro. Explor. Project Location Cajamarca Huamachuco Trujillo Alto Chicama Cajamarca Pacific Ocean La Libertad Pierina Huaraz Huamachuco Otuzco Alto Chicama Trujillo LIMA
Slide 4: Highlights
BARRICK GOLD CORPORATION Denver Gold Forum – Alto Chicama Update September 2003 Overview Geology Process Mining Admin. Capital Enviro. Explor. HIGHLIGHTS Project status: feasibility completed 159 million tons grading 0.045 oz/ton Reserves (in situ): 7.2 million ounces Average annual producti
Slide 5: Section 3800 Lithology
BARRICK GOLD CORPORATION Denver Gold Forum – Alto Chicama Update September 2003 Overview Geology Process Mining Admin. Capital Enviro. Explor. ALTO CHICAMA – Section 3800 Lithology ALTO CHICAMA FEASIBILITY UPDATE – SEPTEMBER 2003 Overview Geology Process Mining Admin. Capital Enviro. Explor. ALTO CH
Slide 6: Section 4200 Lithology
BARRICK GOLD CORPORATION Denver Gold Forum – Alto Chicama Update September 2003 Overview Geology Process Mining Admin. Capital Enviro. Explor. ALTO CHICAMA – Section 4200 Lithology Section 3 ALTO CHICAMA FEASIBILITY UPDATE – SEPTEMBER 2003 Overview Geology Process Mining Admin. Capital Enviro. Explo
Slide 7: Project Layout
BARRICK GOLD CORPORATION Denver Gold Forum – Alto Chicama Update September 2003 Overview Geology Process Mining Admin. Capital Enviro. Explor. PROJECT LAYOUT N E E Dump Dump OPEN OPEN PIT PIT PLANT Sulfide Sulfide StockPile StockPile HEAP LEACH Crusher Crusher HEAP HEAP PLANT PLANT LEACH LEACH OPEN
Slide 8: Detailed Geological Data Base
BARRICK GOLD CORPORATION Denver Gold Forum – Alto Chicama Update September 2003 Overview Geology Process Mining Admin. Capital Enviro. Explor. DETAILED GEOLOGICAL DATA BASE 830 diamond drill holes 138 reverse circulation drill holes 2,581 meters of surface channel cuts 222,299 samples in tot
Slide 9: Buffer Zone Ore Processing
BARRICK GOLD CORPORATION Denver Gold Forum – Alto Chicama Update September 2003 Overview Geology Process Mining Admin. Capital Enviro. Explor. BUFFER ZONE ORE PROCESSING Current plan is to stockpile as mined No value currently assigned in project economics Potential to place on top of heap lea
Slide 10: Metallurgy
BARRICK GOLD CORPORATION Denver Gold Forum – Alto Chicama Update September 2003 Overview Geology Process Mining Admin. Capital Enviro. Explor. METALLURGY Four phases of studies have been undertaken to evaluate the metallurgical characteristics of the deposit Phase 1: Cyanide amenability bottle rol
Slide 11: Extraction Rate Kinetics
BARRICK GOLD CORPORATION Denver Gold Forum – Alto Chicama Update September 2003 Overview Geology Process Mining Admin. Capital Enviro. Explor. EXTRACTION RATE KINETICS 100 Alto Chicama Cycle Time - 45 days 80 Gold Extraction % 60 40 20 0 0 10 20 30 40 50 60 70 80 90 100 ALTO CHICAMA FEASIBILITY UPDA
Slide 12: Process Division
BARRICK GOLD CORPORATION Denver Gold Forum – Alto Chicama Update September 2003 Overview Geology Process Mining Admin. Capital Enviro. Explor. PROCESS DIVISION Manpower – supervision: 18 – maintenance: 25 – leach pad: 40 Processing rate – annually: 15.3 million tonnes – daily: 42,000 tonnes ALTO
Slide 13: Unit Processing Costs
BARRICK GOLD CORPORATION Denver Gold Forum – Alto Chicama Update September 2003 Overview Geology Process Mining Admin. Capital Enviro. Explor. UNIT PROCESSING COSTS US$ per tonne Life of mine Operating supplies $ 0.888 Labour 0.243 Power 0.311 Maintenance 0.065 Total $ 1.507 ALTO CHICAMA FEASIBILITY
Slide 14: Mine Division
BARRICK GOLD CORPORATION Denver Gold Forum – Alto Chicama Update September 2003 Overview Geology Process Mining Admin. Capital Enviro. Explor. MINE DIVISION Mining rate – annually: 30 million tonnes – daily: 80,000 tonnes – life - of- mine strip ratio: 1:1 – bench height: 5 m. in ore – 10 m. in wa
Slide 15: Administration
BARRICK GOLD CORPORATION Denver Gold Forum – Alto Chicama Update September 2003 Overview Geology Process Mining Admin. Capital Enviro. Explor. ADMINISTRATION Total annual cost: $14.7 million Cost per tonne processed: $0.96 Synergies with Pierina: – purchasing – human resources – maintenance sy
Slide 16: Construction Schedule
BARRICK GOLD CORPORATION Denver Gold Forum – Alto Chicama Update September 2003 Overview Geology Process Mining Admin. Capital Enviro. Explor. CONSTRUCTION SCHEDULE Commences Completed Access road Q3 ’03 Q2 ‘04 EIS review process Q3 ’03 Q2 ‘04 Primary crusher ordered Q3 ’03 Q4 ‘04 Pre- strip
Slide 17: Project Performance
BARRICK GOLD CORPORATION Denver Gold Forum – Alto Chicama Update September 2003 Overview Geology Process Mining Admin. Capital Enviro. Explor. PROJECT PERFORMANCE Spot price IRR Payback in years (3.0 peso) pre-finance from start-up $300/oz 27% 2.8 $325/oz 33% 2.5 $350/oz 39% 2.0 ALTO CHICAMA FEASIBI
Slide 18: Environmental – Water Management
BARRICK GOLD CORPORATION Denver Gold Forum – Alto Chicama Update September 2003 Overview Geology Process Mining Admin. Capital Enviro. Explor. ENVIRONMENTAL – Water Management To protect the road and to minimize Sedimentation basin sediment transport, culverts are installed and rock structures are
Slide 19: Reserves - South America
BARRICK GOLD CORPORATION Denver Gold Forum – Alto Chicama Update September 2003 Overview Geology Process Mining Admin. Capital Enviro. Explor. ALTO CHICAMA FEASIBILITY UPDATE – SEPTEMBER 2003 Overview Geology Process Mining Admin. Capital Enviro. Explor. RESERVES - South America areas enlarged Truji
Slide 20: Alto Chicama – Exploration Portfolio
BARRICK GOLD CORPORATION Denver Gold Forum – Alto Chicama Update September 2003 Overview Geology Process Mining Admin. Capital Enviro. Explor. C A J A M A R C A ALTO CHICAMA Huamachuco L A L I B E R T A D 185 sq. km Otuzco Lagunas Norte 8° Quiruvilca 0 10 20 kilometres ANCASH ALTO CHICAMA FEASIBILIT
Slide 21: Alto Chicama Regional Targets
BARRICK GOLD CORPORATION Denver Gold Forum – Alto Chicama Update September 2003 Overview Geology Process Mining Admin. Capital Enviro. Explor. C A J A M A R C A ALTO CHICAMA REGIONAL TARGETS GOITOS LAGUNAS Piedra Grande NW Huamachuco 1,350 sq. km L A L I B E R T A D Otuzco LAGUNAS Genusa Lagunas Nor
Slide 22: Forward Looking Statement
BARRICK GOLD CORPORATION Denver Gold Forum – Alto Chicama Update September 2003 FORWARD LOOKING STATEMENT Certain statements included herein, including those regarding production and costs and other statements that express management’s expectations or estimates of our future performance, constitute