Veolia Environnement Sa · EURONEXT:VIE
Veolia Environnement Sa — World Drug Manufacturing Summit 2009
11 slides from Veolia Environnement Sa's conference presentation, December 2009
Slide 1: Outsourcing: An Innovative Case Study
WORLD DRUG MANUFACTURING SUMMIT 2009 BERLIN, GERMANY, 2nd – 4th December Outsourcing An Innovative Case Study Wyeth, Grange Castle, Ireland by Reg Shaw, Ph.D. 1
Slide 2: Introduction
Introduction Wyeth designed and constructed the world’s largest investment in biotech manufacturing between 1999 and 2005. $2.2 billion was invested in a state of the art Greenfield Facility in Dublin, Ireland for key products such as Enbrel and Prevenar 2
Slide 3: Outsourcing
Outsourcing The scale of the investment required many innovative approaches. Amongst these was how to manage the scale and challenges involved in bringing large scale utilities to operational readiness. Outsourcing of utilities and engineering maintenance was selected for a variety of reasons: Î
Slide 4: Outsourcing: Extensive range of services
Outsourcing Extensive range of services available: Î Utilities – high purity water and steam (Purified water, WFI, Clean Steam, HVAC) Î Facility Services – Maintenance, Cleaning, Administration Î Solvent Recoveries Î Waste Water Operations Î CHP, Solar etc. 4
Slide 5: Benefits of Outsourcing
Benefits of Outsourcing Long-term partnerships and contracts Seamless services Cost Savings delivery Compliance in regulated environments Early outsourcing offers advantages in design, build, finance and operations. 5
Slide 6: Benefits of Outsourcing
Benefits of Outsourcing Build-on capabilities such as CHP can be subsequently undertaken with greater efficiencies Integration of outsourced company with client culture Headcount flexibility Technical expertise 6
Slide 7: Results of Outsourcing
Results of Outsourcing Overall major achievements in flexibility, expertise, cost savings, culture support: Î Typical performance examples: A) Critical systems availability: 99.7% B) System outages impacting manufacturing: 0 C) Work orders – utilities work orders completed on time (10, 000): 97.5%
Slide 8: Results of Outsourcing: Compliance, Health Safety and Environmental Performance
Results of Outsourcing Compliance Health Safety and Environmental Performance Global Multi Services 8
Slide 9: Results of Outsourcing: Global Multi Services
Results of Outsourcing Global Multi Services Î Synergies Î Organisation optimisation Î Single point contacts Î Seamless processes across businesses Î Enhanced cost reduction opportunities Î Global reach of outsource provider 9
Slide 10: Conclusions
Conclusions Outsourcing offers significant advantages: Î Experienced skill-sets in regulated environments Î Core business focus retained Î High service levels Î Cost advantages Î Long term partnerships Î Design, build, finance, operations capabilities 10
Slide 11: Thank you
WORLD DRUG MANUFACTURING SUMMIT 2009 BERLIN, GERMANY, 2nd – 4th December Thank you 11
Veolia Environnement — World Drug Manufacturing Summit 2009 on 6ix