  1. Slide 1: Company Update January 2017

    Company Update January 2017

  2. Slide 2: Disclaimer

    Disclaimer Nature of this document: The purpose of this presentation is to provide general information about Antipa Minerals Limited (the ‘Company’). Unless otherwise stated herein, the information in this presentation is based on the Company’s own information and estimates. In attending this presen

  3. Slide 3: Corporate Snapshot

    Corporate Snapshot Capital Structure (20 January 2017) Board and Management Ordinary Shares 1,173.3 million Stephen Power Commercial lawyer with 30 years experience advising participants in the LLB resources industry in Australia and overseas including Africa and South Unlisted Options 96.1 million

  4. Slide 4: An Exploration Company with a Difference

    An Exploration Company with a Difference Large Scale World Class Asset • Three Large Projects – Citadel, North Telfer and Paterson • +4,400 km2 tenement holding in the underexplored but demonstrated World Class Paterson Province in Western Australia extending to within 3km of Telfer Medium and Long

  5. Slide 5: North Telfer Project – Focus on Minyari Dome

    North Telfer Project – Focus on Minyari Dome North Telfer Project 100% Owned by Antipa Development Opportunity Minyari Deposit provides immediate exploration and short term development opportunities: • Minyari and WACA deposits provide immediate 4.0m @ 6.61 g/t Au, 0.03% Cu exploration and short ter

  6. Slide 6: North Telfer Project – Minyari Deposit

    North Telfer Project – Minyari Deposit Minyari Deposit high-grade gold ± copper • + 300m strike length • Up to 160m in width • Up to 60m in thickness • Open down dip (from below 100 to 580 vertical metres) and potentially along strike 2016 Phase 1 RC Drilling programme Highlights • 69.0m at 4.07 g/t

  7. Slide 7: North Telfer Project – WACA Deposit

    North Telfer Project – WACA Deposit WACA Deposit high-grade gold ± copper • 700m southwest of the Minyari deposit • 550m strike length • 2 main lodes within a corridor up to 50m in width • High-grade gold zone +300m of vertical continuity • Open down dip (from below 90 to 340 vertical metres) Highli

  8. Slide 8: Minyari Deposit Development Opportunity

    North Telfer Project – Minyari Deposit Development Opportunity Oxide Mineralisation Minyari Deposit oxide gold-copper mineralisation commences from as little as 1 metre below the surface Surface Costean sample results were: • 8.0 tonnes at 3.57 g/t gold; and • 8.0 tonnes at 1.50 g/t gold Primary Min

  9. Slide 9: Minyari Dome Induced Polarisation (IP)

    North Telfer Project – Minyari Dome Induced Polarisation (IP) Minyari Dome IP Survey • Extensive IP survey coverage across 3.7km generates significant number of chargeability anomalies • Majority of IP anomalies are untested Judes Prospect • Drill testing of new IP mineralisation targets commenced w

  10. Slide 10: Citadel Project – Rio Tinto Farm-in

    Citadel Project – Rio Tinto Farm-in Citadel Project • 1,335km2 under-explored region • Hosts two large mineralised systems – Calibre and Magnum • Resources 1.2M oz gold, 139kt copper and 1.4Moz silver open in most Citadel directions Project • Recently discovered 4.8km copper mineralisation trend at

  11. Slide 11: Citadel Project – Rio Tinto Farm-in

    Citadel Project – Rio Tinto Farm-in Calibre Deposit Inferred Mineral Resource 47.8Mt at 0.56 g/t Au, 0.17% Cu and 0.60 g/t Ag for 867koz Au, 81kt Cu and 918koz Ag • Multi commodity - gold, copper, silver, tungsten • Large scale mineral system > 1.3km in strike Up to 480m across strike > 550m below s

  12. Slide 12: Citadel Project – 2016 Phase 1 Exploration Programme

    Citadel Project – 2016 Phase 1 Exploration Programme Citadel Induced Polarisation (IP) Survey Completed May 2016 Multiple high priority IP chargeability anomalies along a 20km corridor including the Calibre and Magnum deposits • Blue Steel = 500 to 1,000m long (and open) IP anomaly, stronger than Ma

  13. Slide 13: Citadel Project – 2016 Phase 2 Exploration Programme

    Citadel Project – 2016 Phase 2 Exploration Programme Drilling RC Programme tested various gold-copper geophysical targets • 34 RC holes (5,215m) and 1 diamond drill hole (661m) completed late December 2016 Rimfire • 4.8km long copper mineralised trend identified at Rimfire including: • 23.0m at 0.12

  14. Slide 14: Paterson Project – Additional Opportunities

    Paterson Project – Additional Opportunities Paterson Project • 1,711 km2 of highly prospective ground comes to within 3km of the Telfer Mine • Shallow cover to sub cropping • Limited to no exploration for 20 years • Predominantly shallow drilling ± surface geochemistry • Limited to no ground based g

  15. Slide 15: Antipa Unlocking the Paterson Province

    Antipa Unlocking the Paterson Province News Flow • Citadel and Minyari RC and Diamond drilling and IP results due by end of February 2017. • Announcement and commencement of 2017 Phase 1 Drilling programme at Minyari Dome - March/April. • Rio Tinto election on Citadel Farm- in and announcement of Ci

  16. Slide 16: Appendices

    Appendices Antipa Minerals – Company Update - January 2017 16

  17. Slide 17: WACA Deposit

    North Telfer Project – WACA Deposit WACA Deposit high-grade gold ± copper • 700m southwest of the Minyari deposit • 550m strike length • 2 main lodes within a corridor up to 50m in width • High-grade gold zone +300m of vertical continuity • Open down dip (from below 90 to 340 vertical metres) • Prio

  18. Slide 18: WACA Deposit

    North Telfer Project – WACA Deposit WACA Deposit Plan View WACA Deposit Cross Section View Antipa Minerals – Company Update - January 2017 18

  19. Slide 19: Minyari Deposit Plan View

    North Telfer Project – Minyari Deposit Plan View Minyari Deposit high-grade Au ± Cu: • + 300m strike length • Up to 160m in width • Up to 60m in thickness • Open down dip • Potentially open along strike 2016 Phase 1 RC Intersection Highlights include: • 69.0m at 4.07 g/t gold and 0.07% copper from 9

  20. Slide 20: Minyari Deposit Simplified Cross Sections

    North Telfer Project – Minyari Deposit Simplified Cross Sections Antipa Minerals – Company Update - January 2017 20

  21. Slide 21: Minyari Deposit Detailed Cross Sections

    North Telfer Project – Minyari Deposit Detailed Cross Sections Antipa Minerals – Company Update - January 2017 21

  22. Slide 22: Minyari Deposit 2016 Phase Exploration Targets

    North Telfer Project – Minyari Deposit 2016 Phase 2 Exploration Targets Minyari Deposit Phase 2 Drilling Targets • Extend and evaluate the Minyari deposit high-grade gold-copper mineralisation zones remain open along strike, down dip and/or down plunge via drilling LONG SECTION CROSS SECTION Antipa

  23. Slide 23: Telfer Gold-Copper Deposit - High-Grade Mineralisation

    Telfer Gold-Copper Deposit - High-Grade Mineralisation Telfer’s June 2000 U/G Mineral Resource was 3.5 Mt @ 13.8 g/t Au for 1.5Moz Very high-grade (e.g. 16.1m @ 52.2 g/t Au & 2.9% Cu) classic Telfer Reef Style stratabound (thrust related) mineralisation VSC dominated by low-grade high tonnage minera

  24. Slide 24: Tim's Dome South Deposit (Long Section)

    Paterson Project – Additional Opportunities – Tim’s Dome South Deposit (Long Section) Tim’s Dome South deposit - Significant gold mineralisation • Up to 200m wide gold vein bearing corridor over 4km in strike length • Shallow – gold mineralisation commences from as shallow as 1m below the surface wi

  25. Slide 25: Tim's Dome South Deposit Cross Section

    Paterson Project – Additional Opportunities – Tim’s Dome South Deposit Cross Section Antipa Minerals – Company Update - January 2017 25

  26. Slide 26: NOTES

    NOTES Competent Persons Statement – Exploration Results The information in this report that relates to the Exploration Results is extracted from the following: Reports entitled various relating to Citadel Project and North Telfer Project created between 7 September 2011 and 20 January 2017, includin

  27. Slide 27: NOTES

    NOTES Competent Persons Statement – Calibre Deposit and Magnum Deposit Mineral Resources The information in this report that relates to relates to the estimation and reporting of the Calibre deposit and Magnum deposit Mineral Resources is extracted from the report entitled “Calibre and Magnum Deposi