Red Mountain Mining Ltd · ASX:RMX
Red Mountain Mining — Investor Presentation (August 2015)
21 slides from Red Mountain Mining's investor presentation, Aug 3, 2015
Slide 1: Luncheon Briefings Corporate Presentation
For personal use only RED MOUNTAIN MINING LTD (ASX:RMX) LUNCHEON BRIEFINGS CORPORATE PRESENTATION Sydney, 4 August and Melbourne 5 August – 2015 Dual Strategy for Low Cost Gold Development and High-Grade Discovery at the Batangas Gold Project in the Philippines 122g/t Au 2.6m @ 28.6 g/t Au
Slide 2: Disclaimer
DISCLAIMER The release, publication or distribution of this presentation in certain jurisdictions may be restricted by law and therefore persons in such jurisdictions into which this presentation is For personal use only released, published or distributed should inform themselves about and observe s
Slide 3: The Philippines: A Golden Opportunity
THE PHILIPPINES: A GOLDEN OPPORTUNITY For personal use only Far SE Cu-Au Didipio Cu-Au (Gold Fields) (Oceana) Runruno Au-Mo (Metals Ex) Manila Philippines Batangas Red Mountain’s Masbate (B2Gold) 200koz pa Batangas Gold Project Sianna (Red 5) Co-O (Medusa), 80koz pa • Outstanding prospectivity for g
Slide 4: Red Mountain's Dual Strategy: Low Cost Production & Grow with Discovery
RED MOUNTAIN’S DUAL STRATEGY: TO ESTABLISH LOW COST PRODUCTION & GROW WITH DISCOVERY For personal use only 1. Established resources: 444,000 ounces* of gold, including 221,000 t @ 6.3 g/t Au high grade Indicated Resource at South West Breccia, Lobo. With upside exploration potential for additional h
Slide 5: Key Milestones and Objectives
KEY MILESTONES AND OBJECTIVES: TO ESTABLISH LOW COST PRODUCTION THEN GROW WITH DISCOVERY For personal use only 1. Deliver Feasibility Study (DFS) – main inputs close to complete, targeting Q3/4 2. Complete the Permitting Process: • Environmental compliance Certificate (ECC) - final responses to Envi
Slide 6: Batangas Gold Project: Mineral Resources and Planned Project Infrastructure
BATANGAS GOLD PROJECT: MINERAL RESOURCES AND PLANNED PROJECT INFRASTRUCTURE For personal use only 120km to Manila 20km to Batangas *JORC 2012 Indicated and Inferred resource 6.19 mt at 2.2 g/t Au, 444,000oz Au released on ASX 30 June 2014 5
Slide 7: Batangas Gold Project, Robust Potential Returns
BATANGAS GOLD PROJECT, ROBUST POTENTIAL RETURNS: ¹DFS PRELIMINARY RESULTS JANUARY 2015, LOW COST, HIGH IRR For personal use only • DFS is on initial production of >100,000oz gold over 5 years from only high-grade, open-pit, Indicated Resources • Low operating costs (pre taxes, charges and capital co
Slide 8: South West Breccia Planned Mine
SOUTH WEST BRECCIA PLANNED MINE HIGH GRADE RESOURCES, PIT DESIGNS (YEARS 1 – 2) AND TARGETS For personal use only South West Breccia resource – ¹221,000t @ 6.3 g/t Au, Incl. 174,000t @ 6.8 g/t Au in pit mining inventory Trench 13: ²2.6m @ 28.6 g/t Au, 33.5m @ 25.9 g/t Au then limestone cover Footwal
Slide 9: Stage 1: Open Pit Mining of High Grade South West Breccia Orebody
LOBO: STAGE 1, YEARS 1 & 2 OPEN PIT MINING OF HIGH GRADE SOUTH WEST BRECCIA OREBODY For personal use only 8
Slide 10: Archangel: Large Stockwork Resources with Excellent Metallurgy
ARCHANGEL: LARGE STOCKWORK RESOURCES WITH EXCELLENT METALLURGY OPEN PIT PRODUCTION PLANNED STAGE 1 YEARS 3 - 5 (STAGE 2 YRS 6 - 10) For personal use only 9
Slide 11: Lobo Prospect: Outstanding Exploration Potential
LOBO PROSPECT: OUTSTANDING EXPLORATION POTENTIAL HIGH-GRADE OUTCROPPING RESOURCES AND BURIED TARGETS For personal use only Targets: 5 1. SWB Extension, Limestone 4 2. Signal – HG outcrop 3. Camo – buried target 3 4. West Drift - gold resources 5. Pica – gold intersections 6. Ulupong – HG trenching 1
Slide 12: SWB, Reconstructed Section
LOBO: SWB, RECONSTRUCTED SECTION ? For personal use only ? ? ? Remnant Silica Cap ? ? LB65-11 180m Trench: 9.5m @ 13.5 g/t Au ASL v ? Eroded Lode 11.9m LB62-11 7.75m @ 4.67 g/t Au 160 LB61-11 v 13.3m @8.3 g/t Au λ MAP KEY 140 30.25m 17.4m @ 9.6 g/t Au Agglomerate λ Silica cap Quartz - barite - pyrit
Slide 13: South West Breccia, New Footwall Lode
LOBO: SOUTH WEST BRECCIA, NEW FOOTWALL LODE For personal use only 12
Slide 14: SWB 500m Corridor, SWB Cross Section
LOBO: SWB 500M CORRIDOR, SWB CROSS SECTION For personal use only *All results pre 2012 13
Slide 15: SWB 500m Corridor, Footwall Target, Silver
LOBO: SWB 500M CORRIDOR, FOOTWALL TARGET, Silver For personal use only 14
Slide 16: SWB 500m Corridor, Footwall Target, Barite
LOBO: SWB 500M CORRIDOR, FOOTWALL TARGET, Barite For personal use only 15
Slide 17: SWB 500m Corridor, Tamarind Cross Section
LOBO: SWB 500M CORRIDOR, TAMARIND CROSS SECTION For personal use only 16
Slide 18: South West Breccia Longitudinal Projection
LOBO: SOUTH WEST BRECCIA LONGITUDINAL PROJECTION HIGH GRADE REOURCES AND BURIED TARGETS YET TO BE DRILLED For personal use only 17
Slide 19: Company Structure
COMPANY STRUCTURE For personal use only Red Mountain Mining Ltd ASX: RMX Listed Shares (11 March 2015) 1.185 bn Listed Options RMXOA 3c, 30/6/16 128,501,977 Share Price Options (RMXO) 1.2c 31/03/16 270,987,597 Options (RMXOD) 0.6c 30/6/16 287,882,728 Unlisted Options 20c, 15/9/16 15,000,000 Performa
Slide 20: Key Milestones and Objectives
KEY MILESTONES AND OBJECTIVES: TO ESTABLISH LOW COST PRODUCTION THEN GROW WITH DISCOVERY For personal use only 1. Deliver Feasibility Study (DFS) – main inputs close to complete, targeting Q3/4 2. Complete the Permitting Process: • Environmental compliance Certificate (ECC) - final responses to Envi
Slide 21: Red Mountain Mining: A Golden Opportunity
RED MOUNTAIN MINING (RMX) A GOLDEN OPPORTUNITY For personal use only Red Mountain Mining Head Office: Unit 1, 2 Richardson Street West Perth WA 6005 Red Mountain’s P: +61 8 9226 5668 Batangas Gold F: +61 8 9322 1474 ProjectGold Project info@redmm.com.au www.redmm.com.au 20
Red Mountain Mining — Investor Presentation (August 2015) on 6ix