  1. Slide 1: Building U.S. Lithium Capacity in Northern Nevada: Thacker Pass

    Building U.S. Lithium Capacity in Northern Nevada: Thacker Pass Citi Basic Materials Conference December 2025 NYSE and TSX: LAC 1

  2. Slide 2: Disclaimer

    Disclaimer ADDITIONAL REFERENCE MATERIALS securities at this time and cannot accept orders for any in isolation or as a substitute for measures prepared in of Regulation S- K (“S-K 1300”). Further information about This presentation should be read in conjunction with materials securities at this tim

  3. Slide 3: Thacker Pass Phase 1 Processing Pad Layout

    Thacker Pass Phase 1 Processing Pad Layout ROM Stockpile Beneficiation Admin Building Warehouse Acid Storage Filtration Building Sulfuric Acid Plant Centrifuging CCD Circuit Turbine Generator Leaching Ion Exchange Sulfur Storage Li2CO3 Crystallization Main Substation MgSO4 Crystallization Process Ev

  4. Slide 4: Overall Construction Progress

    Overall Construction Progress

  5. Slide 5: Steel Work to Support Construction of the Processing Plants

    Steel Work to Support Construction of the Processing Plants Over 90 pipe rack modules will be assembled in Winnemucca at CarWil for installation at site Steel awaiting installation at the Thacker Pass laydown yard 5

  6. Slide 6: Filtration Building

    Filtration Building Fabricated automatic filter presses are undergoing factory acceptance testing before being shipped to Thacker Pass Progress at the Filtration Building Thacker Pass will have six Automatic Filter Presses 6

  7. Slide 7: Countercurrent Decantation

    Countercurrent Decantation CCD Thickeners are undergoing trial assembling at the manufacturer prior to being shipped to Thacker Pass Completed central pedestals for the CCD Thickener CCD Thickener trial assembly 7

  8. Slide 8: Sulfuric Acid Plant

    Sulfuric Acid Plant Equipment is sourced and assembled from neighboring Utah Sulfuric Acid Towers are going vertical Inspecting the transition piece that will be installed Equipment is being assembled at Utah Fabrication once it arrives at Thacker Pass 8

  9. Slide 9: Steam Turbine Generator

    Steam Turbine Generator To convert waste steam from the Sulfuric Acid Plant to power the Processing Plant Foundation prep for the Steam Turbine Generator Steam Turbine Generator Turbine Housing 9

  10. Slide 10: Over 750 Workers at Thacker Pass and 150 Workers at WFH

    Over 750 Workers at Thacker Pass and 150 Workers at WFH 10

  11. Slide 11: Workforce Hub Occupancy Ramp-up for Construction Crew

    Workforce Hub Occupancy Ramp-up for Construction Crew Over 300 residents, with increased availability above 900 by mid-Dec Nutritious meals made daily by Target Hospitality First residents moved in late September 2025 Spacious accommodations with private bathrooms 11

  12. Slide 12: LAC

    LAC CONTACT INFORMATION NYSE & TSX Virginia (Ginny) Morgan VP, IR and ESG info@lithiumamericas.com www.lithiumamericas.com @LithiumAmericas