  1. Slide 1: Environmental Assessment and Management Programs for the TVA Kingston Ash Recovery Project

    Environmental Assessment and Management Programs for the TVA Kingston Ash Recovery Project Daniel Jones† David Ludwig† Neil Carriker ‡ Dennis Yankee‡ †ARCADIS U.S., Inc.; ‡Tennessee Valley Authority Imagine the result Imagine the result

  2. Slide 2: Overview

    Overview • Platform & Poster Sessions: – Regulatory Framework – Assessment Efforts • Why? – Environmental Management • This Presentation: – Risk Assessment – Restoration – Stewardship – Decision-Making 2 of 22 22 November 2010 © 2009 ARCADIS

  3. Slide 3: Environmental Management

    Environmental Management Comprised of three major processes Remediation Restoration Stewardship Goals Protection of Replacement of Services Maintenance • Human Health Environmental • Human Use • Environment Services Lost • Ecological Assessments • HHRA NRDA Monitoring • ERA • Human Use • Ecological

  4. Slide 4: Risk Assessment

    Risk Assessment • Iterative Process • Historic Releases – “Stable” conditions Collect Analysis – Start simple Information – Identify uncertainties – Add lines of evidence Risk • Current Releases SMDP Characterization – Dynamic conditions – Start comprehensive – Document trends No Further Action – Fo

  5. Slide 5: Phased Removal Strategy

    Phased Removal Strategy Non-Time Critical Time Critical 5 of 22 22 November 2010 © 2009 ARCADIS

  6. Slide 6: Cleanup: Phase 1

    Cleanup: Phase 1 • Emory River Channel – Blocked by ash – Risks evident and Analysis immediate Collect o Flooding Information o Migration Risk • Time Critical Removal Characterization Action SMDP Start Dredging, Stop Dredging 6 of 22 22 November 2010 © 2009 ARCADIS

  7. Slide 7: Cleanup: Phase 2

    Cleanup: Phase 2 • Dredge Cell, Embayment – Stabilized by Dike #2 Analysis Collect • Non-Time Critical Information Removal Action Risk • EE/CA Done Characterization • Screening – Viable alternatives: SMDP o All ash removed from embayment o Waters restored Excavate Ash, o Wetlands restored Restore Em

  8. Slide 8: Cleanup: Phase 3

    Cleanup: Phase 3 • River System – Emory River (post-dredging) – Clinch River Analysis – Tennessee River Collect • Non-Time Critical Information Removal Action Risk • EE/CA planning Characterization – Residual ash, larger area • Screening SMDP – Risks are uncertain • Baseline – Cleanup is challenging

  9. Slide 9: River System ERA

    River System ERA 9 of 22 22 November 2010 © 2009 ARCADIS

  10. Slide 10: River System: Ecological Receptors

    River System: Ecological Receptors • Aquatic plants • Pelagic fish • Benthic fish • Benthic invertebrates • Aquatic- or riparian-feeding birds – Herbivores (wood duck) – Omnivores (mallard; killdeer) – Piscivores (osprey; great blue heron) • Aquatic- or riparian-feeding mammals – Herbivores (muskrat

  11. Slide 11: Lines-of-Evidence

    Lines-of-Evidence • Exposure Concentrations vs. Literature-Derived Effects Values Weight-of-Evidence – Abiotic media – Biota – Diet • Bioassays – Sediment/Ash – Surface water • Biosurveys – Fish, Benthics – Birds, Mammals – Herps, Plants 11 of 22 22 November 2010 © 2009 ARCADIS

  12. Slide 12: Restoration Status

    Restoration Status • West Embayment – Completed • Swan Pond Embayment – Ecological Restoration Design – Conceptual, in Phase 2 EE/CA • East Embayment – Ash Removal Completed 2010 – Restoration Design 2011 – Consistent with Swan Pond • River System – To Be Determined 12 of 22 22 November 2010 © 2009

  13. Slide 13: Environmental Management: Restoration

    Environmental Management: Restoration Natural Resource Damages Assessment 1. Injuries are “measurable adverse changes” in natural resources or resource services. [15 CFR 990 Subpart E.II.B.1; 43 CFR 11.14(w)] 2. Baseline is “…the condition of natural resources and services that would have existed ha

  14. Slide 14: Environmental Management: Stewardship

    Environmental Management: Stewardship • Fly ash release was huge - however: – Not all resources were damaged – Not all services were impaired • TVA continues to: – Monitor resources – Manage services o Human use o Ecological 14 of 22 22 November 2010 © 2009 ARCADIS

  15. Slide 15: Environmental Management

    Environmental Management • Ultimately about making decisions – Assessments must support the decision-making process • Zero-Sum Enterprise – Resources are finite – Time, money, effort and expertise spent on one question or action are not available for other environmental activities – Investments must

  16. Slide 16: Concurrent Poster Session

    Concurrent Poster Session Monday November 8, 2010 (TODAY!) • Integrated Ecotoxicological Research Programs • Ash Characterization and Migration • Surface Water Quality Monitoring • Survival/Growth of Hyalella azteca • Bioaccumulation of Selenium and Trace Elements • Fish and Benthic Invertebrate Stu

  17. Slide 17: SECTION BREAK

    SECTION BREAK a ARCADIS