Kinder Morgan, Inc. · NYSE:KMI

Kinder Morgan — Kinder Morgan 2011 Analyst Conference

12 slides from Kinder Morgan's conference presentation, Mar 24, 2011

  1. Slide 1: Kinder Morgan Canada

    *Information contained in this presentation is dated as of 3/24/2011. For current project scope and information on the Trans Mountain Pipeline expansion project, please see www.transmountain.com Kinder Morgan Canada Ian Anderson President Kinder Morgan Canada Group March 24, 2011

  2. Slide 2: Trans Mountain Pipeline

    Trans Mountain Pipeline Capacity  Currently 300 MBbl/d, fully- looped potential 700 MBbl/d Markets  British Columbia  Washington State refineries  Westridge marine terminal – offshore markets in U.S. and China Regulation / Tolls  National Energy Board- regulated  New 2011 Toll Settlement pendi

  3. Slide 3: Express – Platte Pipeline System

    Express – Platte Pipeline System KM is system operator, 1/3 owner Express – 280 MBbl/d  231 MBbl/d firm contracts thru 2012-15  Excess capacity today  Canadian production will fill space over time  Primary route for Canadian production to PADD IV refiners Platte – 143-165 MBbl/d  Platte is full

  4. Slide 4: Kinder Morgan Canada – Growth

    Kinder Morgan Canada – Growth (millions $US) 2009 2010 2011B Trans Mountain System (distributable cash flow) $147.4 $156.9 $166.2 Express System (cash distributions) 14.6 13.3 13.5 $162.0 $170.2 $179.7 4

  5. Slide 5: Trans Mountain Expansion (TMX)

    Trans Mountain Expansion (TMX) Current Capacity 300,000 Bbl/d  B.C. & Washington State 225,000  Offshore (90% California) 75,000 Expansion Alternatives  TMX-2 (+$1.5B) +80,000 to 380,000 Bbl/d  TMX-3 less power (+$2.0B) +160,000 to 540,000  TMX-3 (+$0.5B) +160,000 to 700,000 — B.C. & Washington

  6. Slide 6: Trans Mountain Pipeline Advantages to Westcoast

    Trans Mountain Pipeline Advantages to Westcoast  TMX on existing ROW — Northern Gateway is greenfield Enbridge Gateway Proposal  TMX is phased to meet demand — Northern Gateway is single project  TMX thru existing communities, First Nations and Port Trans Mountain: — Northern Gateway thru new Exp

  7. Slide 7: Production – Pipeline Capacity – Spreads

    Production – Pipeline Capacity – Spreads Canadian Crude Production & Capacity (MBbl/d) 5,000  Canadian producers have 4,000 Pipeline Capacity excess pipeline capacity to the U.S. 3,000  Trans Mountain can be 2,000 Oil Sands expanded in stages to access growing demand offshore in 1,000 China Conven

  8. Slide 8: Port Metro Vancouver Tanker Movements

    Port Metro Vancouver Tanker Movements Annual Exports (Bbl/d) 80,000 70,000 60,000 50,000 40,000 30,000 20,000 10,000 - 1955 1960 1965 1970 1975 1980 1985 1990 1995 2000 2005 2010 Historical Monthly Record, April 2010: 143,000 Bbl/d 8

  9. Slide 9: Trans Mountain Westridge Terminal Expansion

    Trans Mountain Westridge Terminal Expansion  Today: Aframax tanker capacity, 650,000 Bbls  Future: Suezmax tanker capacity, 1,000,000 Bbls, savings $1.50/Bbl  Expand to 450,000 Bbl/d (dock capacity) – 2 berths  Port Metro Vancouver supportive of expansion  Widen channel by dredging  Port Suezm

  10. Slide 10: Port Metro Vancouver Overall Traffic

    Port Metro Vancouver Overall Traffic  Established operations support a wide range of ship transport including crude tankers  Crude represents a small fraction of total port traffic  Petroleum products also move thru port  Port has more than enough capacity to handle pipeline expansion Vessel Tra

  11. Slide 11: Firm Service Offering to Dock

    Firm Service Offering to Dock  Binding open season held in 2010 — Over-subscribed — Average dock bid of $1.49/Bbl — 54 MBbl/d contracted for 10 yrs — Shippers pay base toll and firm fee as take or pay  Firm service application filed with NEB November 2010  Shipments to begin late 2011 pending app

  12. Slide 12: KINDER/MORGAN

    KINDER/MORGAN