Filo Mining Corp

Filo Mining — Technical Presentation (January 2019)

13 slides from Filo Mining's technical presentation, Jan 15, 2019

  1. Slide 1: Filo del Sol Pre-Feasibility Study Results

    Filo del Sol Pre-Feasibility Study Results Webcast & Conference Call Presentation January 15, 2019

  2. Slide 2: Cautionary Note Regarding Forward-Looking Statements

    Cautionary Note Regarding Forward-Looking Statements Certain statements made and information contained in this presentation constitutes “forward-looking information” and “forward-looking statements” within the meaning of applicable securities legislation (collectively, “forward-looking information”)

  3. Slide 3: Project Economics

    Project Economics $1.86 billion NPV Pre-Tax NPV (8%) & IRR 27% IRR $1.28 billion NPV After-Tax NPV (8%) & IRR 23% IRR Payback Period from start of processing 3.4 Years Metals Prices Assumed $3.00/lb Cu; $1,300/oz Au; $20.00/oz Ag Initial Capital Expenditures (rounded) $1.27 billion LOM Sustaining Ca

  4. Slide 4: Filo del Sol Process Schematic

    Filo del Sol Process Schematic 4

  5. Slide 5: Project Overview

    Project Overview SUMMARY & OPERATIONAL CHALLENGES • Open pit mine operating for 14 years; – Strong upfront grades leading to payback in 3.4 years – Low (1.5: 1) waste:ore strip ratio • 60,000 tonnes per day processing via sequential heap leaching: – On/off acid leach to extract copper followed by ri

  6. Slide 6: Metal Production Profiles

    Metal Production Profiles UNIQUE TO HAVE THIS LEVEL OF COPPER, GOLD AND SILVER PRODUCED A National Instrument 43-101 – Standards of Disclosure for Mineral Projects (“NI 43-101”) Technical Report that summarizes the results of the PFS and incorporates the initial mineral reserve statement for Filo de

  7. Slide 7: Sensitivities – Robust Project Net Present Value ($M)

    Sensitivities – Robust Project Metal Price Sensitivity (NPV @ 8% Discount Rate) $2,000 $1,800 $1,600 $1,400 Net Present Value ($M) $1,200 $1,000 $800 $600 $400 $200 $0 -20.0% -10.0% 0.0% 10.0% 20.0% Copper Price Gold Price Silver Price A National Instrument 43-101 – Standards of Disclosure for Miner

  8. Slide 8: Sensitivities – Robust Project Net Present Value ($M)

    Sensitivities – Robust Project Single Factor Sensitivity (NPV @ 8% Discount Rate) $2,500 $2,000 Net Present Value ($M) $1,500 $1,000 $500 $0 -20.0% -10.0% 0.0% 10.0% 20.0% Opex Capex All-metals Price A National Instrument 43-101 – Standards of Disclosure for Mineral Projects (“NI 43-101”) Technical

  9. Slide 9: Project Opportunities

    Project Opportunities • Potential recovery of additional metal with minor adjustments to cut-off grades • Potential increase of metallurgical recoveries with additional test work and optimization • Continued evaluation of alternative processing options – vat or tank leaching • Review metallurgical r

  10. Slide 10: Next Steps

    Next Steps • Complete 2018 / 2019 drilling program targeting the porphyry target underneath the known ore body • Identify and test water source • Ongoing environmental studies and data collection in support of project permitting • Initiate flotation metallurgical testwork on sulphide material • Reso

  11. Slide 11: Filo del Sol Mineral Reserve Estimate

    Filo del Sol Mineral Reserve Estimate Notes to accompany Filo del Sol Mineral Reserves table: 1. Mineral Reserves have an effective date of 13 January 2019. The Qualified Person for the estimate is Mr. Jay Melnyk, P.Eng. of AGP Mining Consultants, Inc. 2. The Mineral Reserves were estimated in accor

  12. Slide 12: Project Layout Schematic

    Project Layout Schematic 12

  13. Slide 13: Michelle Fyfe, Investor Relations

    For further information please contact: Michelle Fyfe, Investor Relations Tel: 604-689-7842 Email: info@filo-mining.com