Slide 1: Corporate Presentation February 2010
CORPORATE PRESENTATION February 2010 IN PURSUIT OF FUTURE GR WTH PROVIDING SUSTAINABLE GR WTH CORPORATE PRESENTATION October 2009 IN PURSUIT OF FUTURE PROVIDING GROWTH SUSTAINABLE GR WTH
Slide 2: Legal Disclaimer
Legal Disclaimer This presentation contains forward looking information. The reader is cautioned that assumptions used in the preparation of such information may prove to be incorrect. Events or circumstances may cause actual results to differ materially from those predicted, a result of numerous kn
Slide 3: Corporate Snapshot
Corporate Snapshot • True Energy converts to a E&P (Bellatrix) November 1st, 2009 • Basic shares outstanding (BXE) 92.4 mm • Convertible debentures outstanding (BXE) 84,884 $1,000 principal amount per debenture • Production guidance (2010e) 8,500 boe/d • Production guidance forecasted gas / oil spli
Slide 4: Corporate Snapshot
Corporate Snapshot • Reserves (P + P) (Dec 31/08 after dispositions) 26.1 mmboe • 2008 Proved FD&A costs (excluding FDC) $18.20/boe • Reserve life index (P & P) 11 years • 2008 Recycle ratio (excluding FDC, proved) 1.34 : 1 • Tax pools (approximate) $382 mm • Completed Financing January 28th, 2010 n
Slide 5: Current Environment
Current Environment Management – Experienced management team focused on full cycle organic growth – Industry leading expertise (engineering, operational exploration and financial) – Prudent financial management through implementation of hedges Asset base – Large asset base with substantial growth ar
Slide 6: Financial Management
Financial Management Natural Gas Production Hedges* Average – 2010e 54% $6.56 CDN/ mcf Crude Oil Production Hedges Average – 2010e $75.00 CAD x $101.15 CAD * Based on corporate natural gas production of 32 MMcf/d and 39 Mj/m3 average heat content IN PURSUIT OF FUTURE PROVIDING GROWTH SUSTAINABLE GR
Slide 7: Bellatrix's Debt Targets
Bellatrix’s Debt Targets Convertible debentures Long term debt Working capital deficiency $350 $300 $275.8 mm $251.2 mm $250 $215.0 mm $200 $150 $107.0 mm $100 $73.0 mm $50 $0 2006 2007 2008 2009e 2010e IN PURSUIT OF FUTURE PROVIDING GROWTH SUSTAINABLE GR WTH
Slide 8: Bellatrix's Objectives
Bellatrix’s Objectives • Operate within cash flow – Targeted reductions in G&A and operating expenses in through out 2010 • Controlled capital program – Total 2010 of $75 mm • Production base focus – Continued optimization, maintenance programs and production tie-ins • Continued debt management – Re
Slide 9: Bellatrix's Forecasts
Bellatrix’s Forecasts 2009e 2010e WTI $US/bbl $54.20 $80.00 AECO$CAD/mcf $4.50 $6.00 $CDN/$US exchange rate $0.88 $0.95 Cash from operations ($mm) $36 $72 Cash per share $0.46 $0.78 Average production (boe/d) 8,400 8,500 Capital expenditures ($mm) $18 $75 Capital as a % of Cash Flow 50% 105% IN PURS
Slide 10: 2010 Production Profile
2010 Production Profile (8,500 boed average) 12000 10000 8000 Production (boed) Capital Adds 6000 Downtime For Plant Turn Around 4000 Base Production 2000 0 r r r ry ry ch il ay ne ly t be er be be ua ua pr Ju us ob n r ar A M Ju ug em t em em b M t c Ja Fe A ep O ov ec S N D Base Production Month
Slide 11: Formula for Growth
Formula for Growth • Inventory of low risk development locations – 475 locations – Over 6 years of drilling inventory • Unrisked production Northern Alberta / BC (1,100 boe/d) adds of over 31,800 boe/d • Extensive undeveloped land base of 258,500 net acres West Central • Large geophysical West Centr
Slide 12: Future Growth Potential - Unrisked
Future Growth Potential ‐ Unrisked Area / Project Production (boe/d) Reserves (mmboe) PEMBINA Cardium Oil Horizontal 18,300 30.50 WEST CENTRAL ALBERTA Notikewin Gas Horizontal 8,620 20.00 WILLESDEN GREEN Edmonton gas 570 0.38 SOUTHERN ALBERTA Rattlesnake 2WS 3,200 4.80 MANTARIO Rex oil 1,200 1.20 IN
Slide 13: Pembina - Cardium Oil
Pembina – Cardium Oil • Initial Inventory of 200 horizontal drilling locations • Interest in the Cardium: – 133 Gross Sections – 81 Net Section – Average 61% W.I. West Pembina • Total production potential of 18,300 boe/d • Typical Cardium Horizontal Well: Lodge Pole – Average measured depth of 3,000
Slide 14: Key - Cardium Oil Projects
Key – Cardium Oil Projects 11 - 27 Oil Discovery 3 - 27 Oil Discovery 7 - 14 Oil Discovery Lodgepole West Pembina 13 – 29 Oil Discovery 3 wells in Q1 at West Pembina, 36 drilling locations 2 oil wells drilled at Lodgepole, 8 drilling locations 4 wells planned for Norbuck, 10 drilling locations
Slide 15: West Central Alberta - Notikewin Gas
West Central Alberta – Notikewin Gas • Inventory of over 50 horizontal 13-25 Gas Discovery drilling locations, 2300m TVD, 1000m Hzl leg • Enhanced recovery using horizontal wells and multistage fracture technology • Over 74 net sections of Cretaceous rights at Ferrier, Willesden Green, Brazeau and P
Slide 16: Willesden Green - Edmonton Gas
Willesden Green – Edmonton Gas • Inventory of 17 development locations – Average WI of 40% • Potential production additions of 570 boe/d and 380 mbbls reserves • Approval received for downspaced drilling, 15 sections in total IN PURSUIT OF FUTURE PROVIDING GROWTH SUSTAINABLE GR WTH
Slide 17: Rattlesnake - Second White Specks
Rattlesnake – Second White Specks • Gas resource play: Cretaceous Second Rattlesnake – 92 locations White Specks, Medicine Hat and Milk River sandstones • Inventory of over 192 infill drilling locations • Potential production additions of 3,200 boe/d • GLJ reported remaining recoverable reserves of
Slide 18: Mantario - Heavy Oil
Mantario – Heavy Oil • Current production 450 boe/d • Cold heavy oil production with sand (CHOPS) • Cretaceous Rex Sandstone: 4 - 9 m, 33% porosity, 1,000 mD permeability • OOIP 4.27 mmbbls • Remaining recoverable on BXE acreage 1.92 mmbbls • Inventory of 16 infill locations • Potential production a
Slide 19: Summary
Summary • New management team with over 200 years of experience • Stable production base averaging 8,500 boe/d in 2010 with a exit guidance of 10,000 boe/d • 61% of production is operated • Large undeveloped land base of 258,500 net undeveloped acres • Significant inventory of drill ready locations
Slide 20: Corporate Information
Corporate Information BOARD OF DIRECTORS OFFICERS BANKERS W.C. (Mickey) Dunn Raymond G. Smith, P.Eng. National Bank of Canada Chairman President & CEO Alberta Treasury Branches Doug Baker, FCA Edward J. Brown, CA Murray L. Cobbe Vice President Finance & CFO EVALUATION ENGINEERS John H. Cuthbertson,
Slide 21: In Pursuit of Future Growth
CORPORATE PRESENTATION February 2010 IN PURSUIT OF FUTURE GR WTH 2300, 530 – 8th Avenue SW Calgary, Alberta Canada T2P 3S8 Tel: (403) 266‐8670 Fax: (403) 264‐8163 www.bellatrixexploration.com CORPORATE PRESENTATION October 2009 IN PURSUIT OF FUTURE PROVIDING GROWTH SUSTAINABLE GR WTH