NuStar Energy LP — Wells Fargo Securities 2016 Energy Symposium
34 slides from NuStar Energy LP's conference presentation, Dec 6, 2016

Slide 1: Wells Fargo Securities - 2016 Energy Symposium
Wells Fargo Securities - 2016 Energy Symposium December 6, 2016 Exhibit 99.1

Slide 2: Forward-Looking Statements
Forward-Looking Statements 2 Statements contained in this presentation that state management’s expectations or predictions of the future are forward-looking statements. While these forward-looking statements, and any assumptions upon which they are based, are made in good faith and reflect our curre

Slide 3: NuStar Overview
NuStar Overview

Slide 4: Two Publicly Traded Companies
Two Publicly Traded Companies 4 G.P. Interest in NS IPO Date: 4/16/2001 ~13% Common L.P. Interest in NS Common Unit Price (12/2/16): $48.02 Incentive Distribution Rights in NS (IDR) Annualized Distribution/Common Unit: $4.38 ~13% NS Distribution Take Yield (12/2/16): 9.1% IPO Date: 7/19/2006 Market

Slide 5: Large and Diverse Geographic Footprint with Assets in Key Locations
Large and Diverse Geographic Footprint with Assets in Key Locations Assets: 79 terminals ~94 million barrels of storage capacity ~8,700 miles of crude oil and refined product pipelines Corpus Christi, TX – Destination for South Texas Crude Oil Pipeline System St. James, LA – 9.9MM bbls Pt. Tup

Slide 6: 2016 YTD Returns
… and in 2016 (through 12/2/16) YTD Returns NuStar Energy L.P. 32.6% NuStar GP Holdings, LLC 38.9% Alerian MLP Index 11.7% S&P 500 9.5% NuStar Has Outperformed the Alerian Since the Beginning of the Crude Downturn… 6 -80% -60% -40% -20% 0% 20% Jun-14 Oct-14 Mar-15 Aug-15 Jan-16 Jun-16 Nov-16

Slide 7: Our 2016 Accomplishments in the Face of Challenges
Our 2016 Accomplishments in the Face of Challenges We have succeeded this year by leveraging our strengths Diverse assets: type (pipelines and terminals), market (refined products and crude) and geography Disciplined financial management Operational excellence Efficient project management

Slide 8: Resilient and Strong Core Operations, No Matter the Price of a Barrel of Crude
Resilient and Strong Core Operations, No Matter the Price of a Barrel of Crude 8 20 30 40 50 60 70 80 90 100 110 0.7 0.8 0.9 1 1.1 1.2 1.3 7/1/2014 2/1/2015 9/1/2015 4/1/2016 C ru d e P ri c e C o v e ra g e R a ti o NS Coverage Ratio Price of Crude One-Times Although valuations of some MLPs have

Slide 9: Percentage of Expected 2016 Annual Segment EBITDA
Percentage of Expected 2016 Annual Segment EBITDA Refined Product Pipelines Crude Oil Pipelines Ammonia Pipeline Refined Product Terminals Crude Oil Storage Fuels Marketing: 2% Refined Products Marketing, Bunkering and Crude & Fuel Oil Trading Majority of Segment EBITDA Generated by Fee-

Slide 10: Guidance Summary
Guidance Summary 10 2016 Annual Guidance (3Q Earnings Call1) 4th Quarter 2016 Guidance (3Q Earnings Call1) 2017 Annual Guidance (3Q Earnings Call1) Pipeline Segment EBITDA2 $325 - $345 million Lower than 4Q 2015 Storage Segment EBITDA2 $330 - $350 million Lower than 4Q 2015 Fuels Marketing Segment E

Slide 11: Building on Our Strengths - Stable, Diversified Business
11 Building on Our Strengths - Stable, Diversified Business Foundation for Future Growth Contracted fee-based storage and pipeline assets provide stable cash flows Storage terminals effectively full ~75% of pipeline revenues are demand-pull - based on refinery/fertilizer plant feedstock supply

Slide 12: TexStar Acquisition On Track for Strategic Spending in 2016
TexStar Acquisition On Track for $253 to $273 Million of Strategic Spending in 2016 and Expect $530 to $550 Million of Strategic Spending in 2017 (Dollars in Millions) $374 $302 $328 $288 $160 to $180 $530 to $550 $316 $143 $93 $0 $100 $200 $300 $400 $500 $600 $700 $800 2012 2013 2014 2015 2016 Fore

Slide 13: Pursuing Pipeline and Storage Opportunities
Pursuing Pipeline and Storage Opportunities 3.8MM bbls 13 Expansion of Ammonia Pipeline System Included in 2016 & 2017 Spending Guidance Currently Evaluating West Coast Terminal Expansions Construction of ~750M bbls of New Storage at St. James Linden Terminal Expansion Project to Transport LPGs and

Slide 14: No Debt Maturities until 2018
No Debt Maturities until 2018 (LTD Maturity Profile as of September 30, 2016, Dollars in Millions) Long-term Debt structure 55% fixed rate – 45% variable rate Callable in 2018, but final maturity in 2043 14 $992 $350 $450 $300 $250 $365 $403 $43 $0 $250 $500 $750 $1,000 $1,250 2015 2016 2017 2018

Slide 15: NuStar Energy Recently Issued $200 Million of Perpetual Preferred Equity
NuStar Energy Recently Issued $200 Million of Perpetual Preferred Equity 15 On November 25, 2016, NuStar Energy issued 8 million 8.50% Series A Fixed-to- Floating Rate Cumulative Redeemable Perpetual Preferred Units at a price of $25 per unit Net proceeds of approximately $193 million were recei

Slide 16: Pipeline Segment
Pipeline Segment

Slide 17: Pipeline Segment Overview
17 2016 segment EBITDA should be lower than 2015 as we expect increased volumes on our refined product pipelines to be offset by lower projected Eagle Ford crude volumes. Pipeline Segment Overview Pipeline Segment EBITDA1 ($ in millions) Pipeline Receipts by Commodity TTM as of 9/30/16 *Other incl

Slide 18: Throughputs in NuStar's South Texas Crude Oil Pipeline System
Throughputs in NuStar’s South Texas Crude Oil Pipeline System 18 South Texas Crude Oil Pipeline System: 2016 and 2017 guidance at contractual minimums (133.5 Mbpd), upside potential with a crude oil price recovery For 2016, we expect to receive revenues in excess of actual shipped throughput vol

Slide 19: NuStar's South Texas Pipeline Presence
NuStar’s South Texas Pipeline Presence 19 Choke Canyon PL – 12” Pettus South – 10” Pawnee to Oakville PL – 12” Three Rivers Supply – 12” Corpus-Odem-3R – 8” Oakville to Corpus – 16” Second Phase of Expansion – 12”

Slide 20: Working with Pemex to Develop Project to Transport LPGs and Refined Products
Working with Pemex to Develop Project to Transport LPGs and Refined Products from the U.S. Into Northern Mexico 20 Delays due to organizational changes within Pemex Originally planned $125 million spend in 2016. Due to project delay, spending to take place in 2017 and 2018

Slide 21: NuStar Expanding Mid-Continent Pipeline and Terminal Network
NuStar Expanding Mid-Continent Pipeline and Terminal Network Several projects have been completed or are under development with a key customer to increase distillate and propane supply throughout the Upper Midwest for an investment of approximately $80 million Capital investments to be backed by

Slide 22: Storage Segment
Storage Segment

Slide 23: Storage Segment Overview
2016 segment EBITDA expected to benefit from higher renewal rates and increased utilization, which may be partially offset by lower expected Eagle Ford throughput volumes into our Corpus Christi North Beach Terminal as a result of decreased Eagle Ford shale production 2017 storage results expect

Slide 24: Building Our Strategic Alliances in Europe For Future Growth
24 Building Our Strategic Alliances in Europe For Future Growth As the European market changes, we continue to expand on strategic alliances with our current customers to drive growth through: Working on a long-term agreement with customer at Grays to provide terminaling for all of their Southea

Slide 25: We Are Exploring Expansion in the New York Harbor
25 Acquiring control of the Linden Terminal in 2015 has freed us to develop opportunities that will increase our capability to serve the New York Harbor (NYH), which is one of the largest trading hubs of refined product in the world NYH storage demand continues to be strong and our terminal has

Slide 26: Piney Point Terminal Back in Service
Piney Point Terminal 5.4 million-barrel storage facility located in Piney Point, Maryland, along the Potomac River Primary storage capabilities include gasoline, distillates and other clean products Reactivated due to favorable market economics Signed up storage commitments for 2.5 million

Slide 27: St. Eustatius Terminal Tankage Recently Leased through 1Q 2020
27 Majority of St. Eustatius Terminal Tankage Recently Leased through 1st Quarter of 2020 St. Eustatius Terminal 14.4 million-barrel storage facility located on the island of St. Eustatius in the Caribbean Primary storage capabilities include crude oil and fuel oil (as well as other refined pr

Slide 28: Renewables Opportunities on the West Coast
We Are Adapting to Market Flows: Renewables Opportunities on the West Coast The West Coast: In a mature fuel supply market, biofuels provide opportunities for growth Low carbon initiatives on the West Coast (e.g. California’s Low Carbon Fuel Standard) promote the use of biofuels We currently o

Slide 29: Martin Midstream Terminal Assets
29 Martin Midstream terminal assets 1.15 million barrels of storage (900,000 barrels of crude and 250,000 barrels of refined product storage), located in Corpus Christi, Texas Terminals have direct connectivity to Eagle Ford production through connection to the Harvest Pipeline, a six-bay truc

Slide 30: Appendix
Appendix

Slide 31: Capital Structure after Perpetual Preferred Equity Issuance
Capital Structure after Perpetual Preferred Equity Issuance ($ in Millions) As of September 30, 2016 Actual As Adjusted (Unaudited) $1.5 billion Credit Facility $992 $799 NuStar Logistics Notes (4.75%) 250 250 NuStar Logistics Notes (4.80%) 450 450 NuStar Logistics Notes (6.75%) 300 300 NuStar Logis

Slide 32: Reconciliation of Non-GAAP Financial Information
Reconciliation of Non-GAAP Financial Information 32 2008 2009 2010 2011 2012 2013 2014 2015 Operating income 135,086$ 139,869$ 148,571$ 146,403$ 158,590$ 208,293$ 245,233$ 270,349$ Plus depreciation and amortization expense 50,749 50,528 50,617 51,165 52,878 68,871 77,691 84,951 EBITDA 185,835$ 190,

Slide 33: Reconciliation of Non-GAAP Financial Information (continued)
Reconciliation of Non-GAAP Financial Information (continued) 33 Pipeline Segment Storage Segment Fuels Marketing Segment Projected operating income $ 240,000 - 255,000 $ 215,000 - 230,000 $ 5,000 - 10,000 Plus projected depreciation and amortization expense 85,000 - 90,000 115,000 - 120,000 - Projec

Slide 34: Reconciliation of Non-GAAP Financial Information (continued)
Reconciliation of Non-GAAP Financial Information (continued) 34 Sept. 30, 2014 Dec. 31, 2014 Mar. 31, 2015 Jun. 30, 2015 Sept. 30, 2015 Dec. 31, 2015 Mar. 31, 2016 Jun. 30, 2016 Sept. 30, 2016 Income from continuing operations (116,202)$ 214,169$ 298,298$ 295,436$ 301,335$ 305,946$ 236,222$ 234,414$
Source: SEC EDGAR · 8-K filed Dec 6, 2016
More decks from NuStar Energy LP
Merger or Acquisition (January 2024)14 slides · Jan 22, 2024
Investor Presentation (December 2023)35 slides · Dec 5, 2023
Raymond James Virtual Energy Supply Chain Conference 2023; Pickering Energy Partners TE&MF36 slides · Sep 19, 2023
Barclays CEO Energy-Power Conference 202336 slides · Sep 6, 2023
Citi One-on-One Midstream/Energy Infrastructure Conference 202336 slides · Aug 22, 2023
8th Annual J.P. Morgan Energy, Power & Renewables Conference 202336 slides · Jun 21, 2023