Jsw Energy Limited · NSE:JSWENERGY

Jsw Energy — Q2 FY24 Earnings Presentation

79 slides from Jsw Energy's earnings presentation, Oct 20, 2023

  1. Slide 1: Exchange filing cover letter

    Energy Limited Regd. Office : JSW Centre Bandra Kurla Complex Bandra (East), Mumbai - 400 051 CIN: L74999MH1994PLC077041 Phone: 022 – 4286 1000 Fax: 022 – 4286 3000 Website: www.jsw.in 20th October, 2023 SEC / JSWEL BSE Limited National Stock Exchange of India Limited Phiroze Jeejeebhoy Towers “Exch

  2. Slide 2: Q2 FY24 Results Presentation

    Q2 FY24 Results Presentation October 20, 2023

  3. Slide 3: Forward Looking and Cautionary Statement

    Forward Looking and Cautionary Statement This presentation has been prepared by JSW Energy Limited (the “Company”) based upon information available in the public domain solely for information purposes without regard to any specific objectives, financial situations or informational needs of any parti

  4. Slide 4: Agenda

    Agenda Q2 FY24 Highlights Operational & Financial Performance Segment Wise Performance Safety & Sustainability Business Environment Appendix JSW Energy Q2 FY24 Results Presentation Vijayanagar 225MW Solar Power Plant 3

  5. Slide 5: Q2 FY24 Highlights (1/2)

    Q2 FY24 Highlights (1/2) • Overall Net Generation: Up by 29% YoY at 8.6 BUs driven by strong merchant sales, organic RE capacity additions and contribution from acquired* RE portfolio • Net renewable generation is up by 47% YoY at 4.4 BUs and total thermal generation is up 15% at 4.3 BUs Operational

  6. Slide 6: Q2 FY24 Highlights (2/2)

    Q2 FY24 Highlights (2/2) Company reported highest ever quarterly EBITDA • EBITDA at ₹2,008 Cr and reported PAT of ₹850 Cr, both increased 83% YoY; Cash PAT stood at ₹1,180 Cr • On a sequential basis, EBITDA increased 54% while PAT increased 2 folds Consolidated • Receivables (excl. acquired RE portf

  7. Slide 7: Operational & Financial Performance

    Operational & Financial Performance Sholtu Hydro Power Plant - Turbine

  8. Slide 8: Consolidated Performance

    Consolidated Performance Net Generation (MUs) Total Revenue (₹ Cr) Operational Highlights 30% 12% • Overall Net Generation: Up by 29% YoY at 8.6 29% 22% 6,401 BUs driven by acquired RE portfolio and higher 15,336 3,387 5,712 8,638 thermal generation, partly offset by lower 6,675 12,525 2,596 FY23 ge

  9. Slide 9: EBITDA Bridge

    EBITDA Bridge Q2 FY24 Particulars in ₹ Cr New RE Leveraging Capacity Open Capacity H1 FY24 Particulars in ₹ Cr New RE Leveraging To be Capacity Open Capacity recouped * * Subjected to meeting design energy generation and plant availability for Hydro, and plant availability factor for Barmer (which h

  10. Slide 10: Finance Cost & PAT Movement

    Finance Cost & PAT Movement Finance Cost (YoY; ₹ Cr) Q1 FY24: ₹ 486 Cr Profit After Tax (YoY; ₹ Cr) JSW Energy Q2 FY24 Results Presentation 9

  11. Slide 11: Consolidated Financial Results

    Consolidated Financial Results H1 FY24 H1 FY23 Particulars in ₹ Crore Q2 FY24 Q2 FY23 6,401 5,712 Total Revenue 3,387 2,596 3,316 2,209 EBITDA 2,008 1,098 52% 39% EBITDA Margin(%) 59% 42% 807 583 Depreciation 409 294 999 398 Finance Cost 514 204 1,510 1,349 Profit Before Tax 1,086 600 1,140 1,026 Pr

  12. Slide 12: Net Debt Movement

    Net Debt Movement Particulars in ₹ Cr Leverage Net Debt (₹ Cr) EBITDA (TTM; ₹ Cr) ND/EBITDA (x) Capital Work- in-Progress (CWIP) 10,338 3,993 2.6x Operating Acquired RE Portfolio Acquired RE Portfolio (Normalised EBITDA) 8,072 1,650 4.9x Operational Projects Combined (Excl. CWIP) 18,410 5,643 3.3x 6

  13. Slide 13: Project Progress

    Project Progress Under Construction 3.0 GW, to be Commissioned by CY24 Group Captive MoUs Under-Construction Operational by CY2024 (MW) Generation 6.2 GW 300 9,792 733 240 810 Storage 2.7 GWh 700 238 6,771 1,000MWh BESS Progressively by 2030 4,559 Hydrogen 85-90 KTPA 17% 34% CAGR FY21 CAGR Current I

  14. Slide 14: Superior Financial Risk Profile

    Superior Financial Risk Profile Net Debt (₹ Cr) Net Worth (₹ Cr)* & Cash Returns (%) 22,904 24,260 22,180 16,638 21% 18,629 19,111 19,877 17,593 21% 18,392 20% 18% 20% 18% 9,840 7,720 7,874 12,952 13,491 13,446 14,177 14,061 14,859 Jun-22 Sep-22 Dec-22 Mar-23 Jun-23 Sep-23 Jun-22 Sep-22 Dec-22 Mar-2

  15. Slide 15: Healthy Trade Receivables

    Healthy Trade Receivables Consolidated Trade Receivables* Excluding Operational Highlights Acquired RE Portfolio (₹ Cr ) • Receivables (in ₹ Cr) improved by 10% YoY o Receivables days (excl. Acquired RE Portfolio and Hydro 10% 1,769 true-up impact) further improved to 56 days in Q2 1,599 FY24 • All

  16. Slide 16: Segment Wise Performance

    Segment Wise Performance Vijaynagar Thermal Power Plant- Control Room

  17. Slide 17: Thermal Assets | Q2 FY24 Highlights (1/2)

    Thermal Assets| Q2 FY24 Highlights (1/2) Overview Offtaker Profile Operational Assets - 3,158* MW Under Construction Rajasthan , 28% Total Thermal Open, Capacity 34% 3,858 MW 3,858 MW Group MSDECL, Captive, 8% Ratnagiri Barmer Vijayanagar Ind - Barath 30% Operational Installed Capacity 1,200 MW 1,08

  18. Slide 18: Thermal Assets | Q2 FY24 Highlights (2/2)

    Thermal Assets| Q2 FY24 Highlights (2/2) Net Generation (MUs) Thermal : PLF – long term Operational Highlights 15% 11% • Total Net Generation +15% YoY at 4.3 BUs, 4,269 8,709 83% 83% 85% 72% 72% 73% 79% supported by strong merchant volumes, higher 3,698 7,879 70% LT generation at Ratnagiri, partly o

  19. Slide 19: Renewable Assets | Presence across all modes of generation

    Renewable Assets | Presence across all modes of generation Total 5,922 MW Offtaker Profile Operational Assets – 3,613 MW Under Construction – 2,321 MW Expected to be operational by CY 2024 3,628 MW Haryana, Open Capacity, 2% HYDRO WIND WIND Raj, 4% 4% 61% SECI, HP, 5% 31% Wind AP, SOLAR 6% 5,934 HYD

  20. Slide 20: Renewable Assets | Q2 FY24 Highlights

    Renewable Assets |Q2 FY24 Highlights Installed Green Capacity (MW) Net Generation (MUs) Operational Highlights 2.2x 47% 43% • Net generation increased 47% YoY to 3,613 4.4 BUs driven by capacity additions Group Captive Solar – 18 MW 6,627 SECI X- 216 MW 4,369 and contribution from Acquired RE 4,646

  21. Slide 21: Safety & Sustainability

    Safety & Sustainability Sholtu, Charkha Initiative

  22. Slide 22: Continued Focus on Health & Safety Excellence

    Continued Focus on Health & Safety Excellence All Figures are for Q2 FY24 Zero severe injuries/fatalities Lost Time Injury Frequency Rate of zero at all the operational plants 84% of contractors covered by JSW CARES audit 20 Contractors (34%) achieve 5 Star rating & 73% contractors achieve 3 Star an

  23. Slide 23: Sustainability: Framework and Policies

    Sustainability: Framework and Policies 17 Focus Areas with 2030 Targets from 2020 as Base Year Governance & Oversight by Sustainability Committee Climate Change: Renewable Power: Biodiversity: Committed to being carbon Enhance the renewable power No Net Loss for Biodiversity Mr. Sunil Goyal Independ

  24. Slide 24: Sustainability: Targets and Strategy

    Sustainability: Targets and Strategy SD Targets FY20 FY30 Improvement Strategic Initiatives and Approach Actuals Targets  TCFD –Preliminary report received  GHG Emissions  Supply Chain Sustainability – development of Digital Platform is in progress for value Climate 0.76 0.215 * 60% chain partner

  25. Slide 25: Sustainability Performance

    Sustainability Performance Biodiversity Supplier Human & Ecosystem Assessment Rights  Preliminary TCFD  Phase 1 -Gap  Identification of risks  Human rights training Report received assessment and risk associated with critical plan - FY24 mapping using global suppliers based on ESG on discriminat

  26. Slide 26: Sustainability: Q2 FY24 Performance

    Sustainability: Q2 FY24 Performance Key Highlights Performance • Increased share of renewable energy for deep decarbonisation Ash Utilisation (%) Climate Change • Wind Projects – Tuticorin – generation started and commissioned 216 MW till 100% 100% 100% 100% Q2 FY 24. • Continuous focus on process i

  27. Slide 27: Sustainability: Empowering Our Communities

    Sustainability: Empowering Our Communities Sholtu, Shikhar Initiative JSW Energy Q2 FY24 Results Presentation 26

  28. Slide 28: Sustainability: Empowering Our Communities

    Sustainability: Empowering Our Communities Project Shikhar: Bringing Powerful Transformation in the Field Of Sports Our Footprint Boxing training Strength and 4 Centres sessions Condition Shikhar Fellowship coaching 120+ Trainees Dedicated Events and Professional Competitions 374 Medals Coaches Plat

  29. Slide 29: Awards and Recognition

    Awards and Recognition “Gold Award - 14th Exceed Green Power- Gen ESG future Environment & Sustainability Award in award -2023 for sustainability Best ESG category” Initiative – Water SEEM National Sustainable Efficiency by Award for Energy development Council of Enviro Efficiency Platinum foundatio

  30. Slide 30: Investor Relations Contact

    Investor Relations Contact: ir.jswenergy@jsw.in ESG Data Profile: Link Vijayanagar TPP 29

  31. Slide 31: Business Environment

    Business Environment Acquired RE portfolio Wind Farm (Maniyachi, Tamilnadu)

  32. Slide 32: Indian Economy

    Indian Economy Real GDP Growth (%) 20.1 13.1 8.4 6.2 7.8 5.4 4.5 6.1 3.2 2.8 0.7 2.5 4.0 • Indian economy continues to see resilient growth amid slow global recovery and growing regional divergences o Real GDP growth for Jun-23 quarter stood at 7.8 % YoY; -6.6 this is despite a strong base of 13.1%

  33. Slide 33: India's installed capacity stands at 425 GW as on Sep-23

    India’s installed capacity stands at 425 GW as on Sep-23 Sector-wise Installed Capacity Segment-wise Installed Capacity Renewable Capacity Breakdown 2% 131.5 15.8 24% 25% 11% State Thermal 44.1 Other RES 425 GW Nuclear 425 GW Private 31% Wind Hydro Solar 56% Central Renewables 71.6 51% Overall segme

  34. Slide 34: Power Demand increased by 13% YoY in Q2 FY24

    Power Demand increased by 13% YoY in Q2 FY24 Power Demand in BUs Power Demand Growth (% YoY) 165 40% 155 145 30% • Pan India demand during Q2 FY24 135 20% increased by 13% YoY and 7% YTD to 437 125 10% 115 BUs due to surge in economic activities 105 0% 95 -10% • Demand in West increased by 21% YoY A

  35. Slide 35: Overall Generation Increased by 11% YoY in Q2 FY24

    Overall Generation Increased by 11% YoY in Q2 FY24 Power Generation Growth (% YoY) Thermal PLFs 30% 80% 20% 70% • Overall generation in Q2 FY24 stood at 10% 60% 459 Bus, an increase of 11% YoY 0% -10% 50% • Share of thermal in overall generation Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr Ma

  36. Slide 36: Merchant Power – Day Ahead Market

    Merchant Power – Day Ahead Market Monthly Average Merchant Tariff (₹/unit) Linear Trend - Monthly Avg Price (₹/kwh) 11.0 12.0 9.0 10.0 7.0 8.0 • Day Ahead Market (DAM) prices averaged at 5.0 ₹5.9/unit during Q2 FY24 and increased by 6.0 3.0 9% YoY due to hot weather conditions and 4.0 1.0 unusual mo

  37. Slide 37: Appendix

    Appendix Acquired RE portfolio Solar Plant (Hungund, Karnataka)

  38. Slide 38: Operational Performance – Net Generation

    Operational Performance – Net Generation Net Generation (MUs) Capacity Q2 FY24 Q2 FY23 Change YoY H1 FY24 H1 FY23 Change YoY Location % % % LT 89% 1,478 1,302 14% 3,140 2,507 25% Ratnagiri (1,200 MW) Total 100% 1,752 1,311 34% 3,691 2,828 30% Barmer (1,080 MW) LT 100% 1,593 1,651 -4% 3,011 3,205 -6%

  39. Slide 39: Operational Performance – PLF

    Operational Performance – PLF PLF/CUF Capacity Q2 FY24 Q2 FY23 H1 FY24 H1 FY23 Location % % % % % LT 89% 67 (*88) 60 (*81) 72 (*94) 58 (*76) Ratnagiri (1,200 MW) Total 100% 72 (*91) 54 (*73) 76 (*96) 59 (*74) Barmer (1,080 MW) LT 100% 75 (*78) 77 (*81) 71 (*74) 75 (*78) LT 36% 80 (*86) 100 (*100) 83

  40. Slide 40: Entity-wise Financial Results

    Entity-wise Financial Results Entity-wise Revenue from Operations Particulars in ₹ Crore Q2 FY24 Q2 FY23 H1 FY24 H1 FY23 Standalone 1,133 1,141 2,617 3,138 JSW Energy (Barmer) 727 665 1,367 1,283 JSW Hydro Energy 691 539 988 896 Acquired RE Portfolio 607 NA 1,025 NA JSW Renewable Energy (Vijayanagar

  41. Slide 41: Cash Returns on Adjusted Net Worth

    Cash Returns on Adjusted Net Worth ₹ Cr (Unless mentioned otherwise) Quarter ended Dec-21 Mar-22 Jun-22 Sep-22 Dec-22 Mar-23 Jun-23 Sep-23 Reported PAT 324 864 560 466 180 272 290 850 Add: Depreciation 281 277 289 294 295 291 398 409 Add/(less): Deferred Taxes 26 (7) 84 42 14 24 55 89 (Less): Divide

  42. Slide 42: JSW Energy – Presence across the value chain

    JSW Energy – Presence across the value chain Well placed to achieve 10 GW of generation capacity ahead of stated timeline of 2025 with foray into New Age Businesses Power Generation Energy Storage Energy Products & Services 9.8 GW Installed Capacity by CY24 3.4 GWh of locked in capacity Solar Module

  43. Slide 43: Developed a Pan India Footprint of Diverse Asset Base

    Developed a Pan India Footprint of Diverse Asset Base Operational Capacity by CY 24 (9,792 MW) Punjab Himachal Pradesh Wind Hydro 50 MW 1,631 MW Solar BESS Rajasthan Thermal PSP 258 MW Madhya Pradesh 30 MW Green Hydrogen 1,080 MW 1,000 MWh Gujarat 78 MW Odisha 700 MW Maharashtra Telangana 447 MW And

  44. Slide 44: Well Diversified Portfolio – Focused on Maximising Cash Returns

    Well Diversified Portfolio – Focused on Maximising Cash Returns Capacity Breakdown Diversified Offtakers Current open Open Capacity, Generation 9,792 MW capacity – 11% Group 14% Captive, 22% Installed 6,771 MW Under-construction Others, 7% 3,021 MW 31% Current Exposure to Thermal 3,158 MW HP, 3% Gro

  45. Slide 45: JSW Energy Company Overview – Broad Structure

    JSW Energy Company Overview – Broad Structure Ratnagiri – 1,200 MW JSW Energy Limited Vijayanagar – 860 MW Hydro Entities Nandyal – 18 MW 9,792 MW Solar/Wind Entities Solar – 10MW Products & Services Total – 2,088 MW JSW Neo Energy * JSWEBL – 1,080 MW 5,924 MW Ind-Barath – 700 MW Energy Generation P

  46. Slide 46: JSW Neo – Presence across the value chain

    JSW Neo – Presence across the value chain Well placed to achieve 10 GW of generation capacity ahead of stated timeline of 2025 with foray into New Age Businesses Power Generation Energy Storage Energy Products & JSW NEO - Assets Services Captive Solar, 243 Kutehr HEP, 240 SECI XII Wind, 300 5.9 GW 3

  47. Slide 47: JSW Neo – Multiple Growth Drivers

    JSW Neo – Multiple Growth Drivers Generation 5,924 300 240 733 810 3,603 238 49% CAGR Current SECI - X SECI- IX Group Kutehr SECI- XII Operational Operational Captive by CY24 Wind Energy Products & Services Hydro Pumped 3.4 GWh locked -in Storage 40 GWh by 2030 Solar BESS H2 Green Hydrogen 3,800 TPA

  48. Slide 48: Developed a Pan India Footprint of Diverse Asset Base

    Developed a Pan India Footprint of Diverse Asset Base Operational Capacity by CY 24 (5,924 MW) Punjab Himachal Pradesh 50 MW 1,631 MW Wind Hydro Rajasthan Madhya Pradesh Solar BESS 1,000 30 MW 258 MW MWh Green H2 PSP Gujarat 78 MW Telangana Maharashtra 101 MW Andhra Pradesh 447 MW 365 MW 327 MW 10 M

  49. Slide 49: Renewable Assets | Acquired RE Portfolio

    Renewable Assets | Acquired RE Portfolio Net Generation (MUs) PLF Wind Solar Operational Highlights 1,306 2,218 • Net generation increased 27% YoY 1,031 165 1,951 381 driven by 29% increase in wind 148 349 generation Solar 1,141 Wind • CUF: Wind CUF stands at 40% due 1,837 883 1,602 to better machin

  50. Slide 50: Acquired RE Wind Assets (1,331 MW)

    Acquired RE Wind Assets (1,331 MW) Asset Optimisation & Performance Improvement Plan - Promising Outcome Witnessed Restoration of WTGs WIND All WTGs which were stopped before acquisition have been restored Maniyachi site (252 MW) fully operational and contributed in Q2 FY24 Action Plan Machine avail

  51. Slide 51: Acquired RE Wind - progress on track

    Acquired RE Wind - progress on track Actual Generation vs Wind Speed Machine Availability (%) +630 bps 97% +800 bps 7.0 96% 91% 6.4 88% 878 1,141 Q2 FY23 Q2 FY24 Actual Generation (MUs) Wind Speed (m/s) Wind Generation (MUs) Q2 FY23 Q2 FY24 H1 FY23 H1 FY24 1,141 CUF (%) -1 40.1% +830 bps 84 22 +330

  52. Slide 52: Acquired RE Solar Assets (422 MW)

    Acquired RE Solar Assets (422 MW) Asset Optimisation & Performance Improvement Plan - Promising Outcome Witnessed Operations & Maintenance SOLAR O&M SOP implemented and monitored on regular basis Action Plan Spares are proactively planned and spares backup created accordingly • Improved Performance

  53. Slide 53: Acquired RE Solar - progress on track

    Acquired RE Solar - progress on track P-90 vs Actual Generation (MUs) Solar Generation (MUs) Q2 FY24 165 4 165 151 14 -1 148 18 MUs due to focused interventions P-90 Generation Actual Generation Q2 FY23 Performance GII Gain Billing Cycle Q2 FY24 Ratio gain Plant Availability (%) CUF (%) 98.9% 99.0%

  54. Slide 54: Receivables Cycle Improving

    Receivables Cycle Improving Strong collection in Acquired RE Portfolio’s Receivables Particulars in ₹ Cr 2,236 30% YoY improvement 1,799 1,532 Sep-22 Jun-23 Sep-23 Focused O&M Interventions leading to strong billing/collection growth 91% 17% Operating efficiency reflecting in strong generation and b

  55. Slide 55: Renewable Assets | Hydro Q2 FY24 Highlights

    Renewable Assets | Hydro Q2 FY24 Highlights Net Generation (MUs) Hydro : PAF and PLF 5% 13% Operational Highlights 4,472 107% 106% 2,900 2,766 3,910 107% 105% • Net generation at Hydro Assets Short 98% 94% 76% Term 67% (Karcham and Baspa) down due to 98% 98% 98% Long 97% 4,396 unusual monsoon and hi

  56. Slide 56: Under Construction Projects

    Under Construction Projects Acquired RE Solar Plant (Hungund, Karnataka) JSW Energy Q2 FY24 Results Presentation 55

  57. Slide 57: JSW Neo- Wind Power Projects – 2.2 GW

    JSW Neo- Wind Power Projects – 2.2 GW Wind Projects (SECI IX,X, XII and Group Captive)  216 MW commissioned by end of Q2 FY24  Expected commissioning by CY 2024 JSW Energy Q2 FY24 Results Presentation 56

  58. Slide 58: JSW Neo - Kutehr Hydro Power Plant – 240 MW

    JSW Neo - Kutehr Hydro Power Plant – 240 MW Tunneling & Concreting Electro-mechanical works Concreting Barrage  Completed ~ 99.4% (21 km) tunneling • Spiral Case erection work of all • Completed ~76 % of Concreting of work (up from ~ 95.9 % in Q1) units completed Barrage  Power house and control r

  59. Slide 59: JSW Energy - Ind-Barath 700 MW – Commissioning in FY24

    JSW Energy - Ind-Barath 700 MW – Commissioning in FY24 Mechanical Electrical Works • Boiler light up work completed • Transmission tower foundation, erection and • Coal and ash handling work in stringing work in progress progress • Switchyard overhauling work started JSW Energy Q2 FY24 Results Prese

  60. Slide 60: Auditor's Review Report – Standalone

    Deloitte Chartered Accountants One International Center Tower 3, 27th-32nd Floor Haskins & Sells LLP Senapati Bapat Marg Elphinstone Road (West) Mumbai-400 013 Maharashtra, India Tel: +91 22 6185 4000 Fax: +91226185 4101 INDEPENDENT AUDITOR'S REVIEW REPORT ON REVIEW OF INTERIM STANDALONE FINANCIAL R

  61. Slide 61: Standalone Unaudited Financial Results

    ENERGY LIMITED Registered Office: JSW Centre, Bandra Kurla Complex, Bandra (East), Mumbai-400051 CIN : L74999MH1994PLC077041 Statement of Standalone Unaudited Financial Results for the Quarter and Six Months Ended September 30, 2023 "crore Quarter Ended Six Months Ended Year Ended Sr. Particulars 30

  62. Slide 62: Standalone Statement of Assets and Liabilities

    Standalone Statement of Assets and Liabilities " C rore As at Particulars 30.09.2023 31.03.2023 Unaudited Audited A.ASSETS 1. Non-current assets : (a) Property, plant and equipment 3,599.71 3,706.42 (b) Capital work-in-progress 13.12 15.53 (c) Other Intangible assets 1.67 2.21 (d) Investments in sub

  63. Slide 63: Standalone Statement of Cash Flows

    Standalone Statement of Cash Flows , Crore For the six months ended Particulars 30.09.2023 30.09.2022 Unaudited Unaudited A CASH FLOW FROM OPERA TING ACTIVITlES Profit before tax 512.34 736.95 Adjusted for: Depreciation and amortisation expense 140.40 160.28 Interest income earned on financial asset

  64. Slide 64: Additional information pursuant to Regulation 52(4)

    Additional infonnation pursuant to Regulation 52(4) of Securities and Exchange Board of India (Listing Obligations and Disclosure Requirements) Regulations, 2015, as amended · As at/ As at/ As at/ Sr. Particulars Quarter Ended Six Months Ended Year Ended No. 30.09.2023 30.06.2023 30.09.2022 30.09.20

  65. Slide 65: Auditor's Review Report – Consolidated

    Chartered Accountants Deloitte One International Center Tower 3, 27th-32nd Floor Haski,ns & Sells LLP Senapati Bapat Marg Elphinstone Road (West) Mumbai-400 013 Maharashtra, India Tel: +91 22 6185 4000 Fax: +91 22 6185 41 01 INDEPENDENT AUDITOR'S REVIEW REPORT ON REVIEW OF INTERIM CONSOLIDATED FINAN

  66. Slide 66: Auditor's Review Report – Consolidated (continued)

    Deloitte Haskins & Sells LLP 6. We did not review the financial information I financial results of 30 subsidiaries included in the unaudited consolidated financial results, whose interim financial information I financial results reflect, total assets of Rs. 27,145.03 crore as at September 30, 2023,

  67. Slide 67: List of entities included in consolidated results

    Deloitte Haskins & Sells LLP Appendix A List of entities included in consolidated financial results I. Parent JSW Energy Limited II. Subsidiaries 1. JSW Hydro Energy Limited (formerly known as Himachal Baspa Power Company Limited) 2. JSW Energy (Kutehr) Limited 3. JSW Energy (Raigarh) Limited 4. JSW

  68. Slide 68: List of entities (continued)

    Deloitte Haskins & Sells LLP 51. Mytrah Advaith Power Private Limited 52. Mytrah Akshaya Energy Private Limited 53. Nidhi Wind Farms Private Limited 54 . Mytrah Ainesh Power Private Limited 55. Mytrah Vayu (Bhawani) Private Limited 56. Mytrah Vayu (Chitravati) Private Limited 57. Mytrah Vayu (Hemava

  69. Slide 69: Statement of Consolidated Financial Results

    ~ ENERGY LIMITED Registered Office : JSW Centre, Bandra Kurla Complex, Bandra (East), Mumbai 400051 CIN: L74999MH1994PLC077041 Statement of Consolidated Financial Results for the Quarter and Six Months Ended September 30, 2023 ( " crore ) Quarter Ended Six Months Ended Year Ended Sr. Particulars 30.

  70. Slide 70: Consolidated Statement of Assets and Liabilities

    Consolidated Statement of Assets and Liabilities (, crore J As at Sr. Particulars 30.09.2023 31.03.2023 No. Unaudited Audited A ASSETS 1 Non-current assets: (a) Property, plant and equipment 25,571 77 23,065,01 (b) Capital work-in-progress 7.34110 4,779 50 (c) Goodwill 639.82 639.82 (d) Other intang

  71. Slide 71: Consolidated Statement of Cash Flows

    Consolidated Statement of Cash Flows ( f crore) Sr. Particulars For the period ended For the period ended No. 30.09.2023 30.09.2022 Unaudited Unaudited I. CASH FLOW FROM OPERATING ACTIVITIES Profit before tax and deferred tax adjustable in future tariff 1,517.82 1,357.46 Adjusted for: Deprecialion a

  72. Slide 72: Consolidated Segment Information

    Consolidated Segment Information: Sr Quarter Ended Six Months Ended Year Ended No Particulars 30.09 .2023 30.06.2023 30.09.2022 30 .09.2023 30.09.2022 31 .03.2023 Unaudited Unaudited Audited 1 Segment revenue (Revenue from operations) (a) Thermal 1,822 42 2,083 .18 1,769.92 3,905 60 4,352.68 8,614.0

  73. Slide 73: Press Release – Key Highlights of Q2 FY24

    ~ ~Energy Press Release October 20, 2023 Financial Results for the Quarter ended September 30, 2023 Mumbai, India: JSW Energy Limited ("JSW Energy" or the "Company") today reported its results for the quarter ("Q2 FY24" or the "Quarter") ended September 30, 2023. Key Highlights of Q2 FY24 Operationa

  74. Slide 74: Under construction - Utility Scale Generation Projects

    Under construction - Utility Scale Generation Projects: • 2.1 GW Wind projects: (i) SECI X project under progress with part CoD received for 216 MW as of Sept'23 (ii) WTG erection & BoP works in-progress for SECI IX and Group Captive plant (iii) SECI XII WTG supplier finalised and BoP works under te

  75. Slide 75: Consolidated Operational Performance

    Net generation during the quarter stands at 8,638 MUs, up 29% YoY driven by generation at acquired RE portfolio and higher thermal generation partly offset by lower generation at Hydro assets. Total Long Term sales 1 in the quarter increased by 22% YoY driven by higher generation at Ratnagiri (Unit-

  76. Slide 76: Consolidated Financial Performance commentary

    reported its highest ever quarterly EBITDA of ~2,008 Crore, which was higher by 83% YoY, driven by robust EBITDA contribution from acquired renewable assets, short term thermal sales and a truing-up impact at hydro business. Reported Finance costs during the quarter increased to ~514 Crore vis-a-vis

  77. Slide 77: Business Environment and Outlook

    Business Environment4 : • India's power demand during Q2 FY24 increased by 13% YoY and 7% YTD to 437 BUs due to a surge in economic activities • Further, the all India peak power demand touched all time high of 240 GW in the month of September 2023. • In line with demand, overall power generation in

  78. Slide 78: India's macro-economic data and power sector outlook

    • India's latest macro-economic data reflect a resilient economy in the midst of a slowing global economic landscape. Both manufacturing (Sept-23: 57.5) and services (Sept-23: 61.0) PMI prints remain strong. Strong GST collections trend continues, GST revenue surpasses the ~1.60 trillion barrier for

  79. Slide 79: For Further Information, Please Contact

    ABOUT JSW ENERGY: JSW Energy Ltd is one of the leading Private sector power producers in India and part of the USD 23 billion JSW Group which has significant presence in sectors such as steel, energy, infrastructure, cement, sports among others. JSW Energy Ltd has established its presence across the

JSW Energy — Q2 FY24 Earnings Presentation on 6ix