Lydian International — Sprott Natural Resource Symposium 2017
22 slides from Lydian International's conference presentation, July 2017
Slide 1: Sprott Natural Resource Symposium
TSX: LYD Sprott Natural Resource Symposium July 25-28, 2017
Slide 2: Cautionary Statements
Cautionary Statements Forward Looking Information & Estimates of Reserves and Resources Certain information contained in this presentation, including any information relating to Amulsar's expected future performance, is "forward looking". All statements in this presentation, other than statements of
Slide 3: Amulsar Gold Project: Compelling Asset – Re-rate Opportunity
Amulsar Gold Project Compelling Asset – Re-rate Opportunity Large Scale Operation Low AISC Upside Potential From Current Average Annual LOM Production Profile of Resources & Open Production $579/oz Extensions 225,000 oz Construction 100% Owned Underway First Gold Financed Construction Generates Deve
Slide 4: Capital Structure Established for Development
Lydian International Capital Structure Established for Development Capital Structure Ordinary Shares LYD Trading Symbols Publicly-traded Warrants LYD.WT Ordinary Shares 699 MM Shares Publicly-traded Warrants 99 MM Outstanding Unlisted Warrants 5 MM Market C$235 MM Capitalization1 ADR platform. Recen
Slide 5: Strong Investor and Analyst Support
Lydian International Strong Investor and Analyst Support Key Shareholders Analyst Coverage Resource Capital Fund BMO Andrew Breichmanas Orion Mine Finance Management I Limited GMP Oliver Turner European Bank for Reconstruction & Development National Bank Shane Nagle Franklin Resources, Inc. Scotiaba
Slide 6: Armenia: Infrastructure, Government & Workforce
Armenia Infrastructure, Government & Workforce Located on Armenia’s Primary Infrastructure Corridor • Paved access to site • High-voltage power and water on site • Internet and telecom in place Supportive Government • Mining Right, EIA and Technical Safety Program approved • Modern mining code Major
Slide 7: Amulsar Site Plan
Amulsar Site Plan Conventional Open-Pit Heap Leach 7 TSX: LYD
Slide 8: Amulsar Operating Scale and Economics
Amulsar Operating Scale and Economics Amulsar Mine Profile Supports Powerful Economics Operating Profile1 Economic Results $1,250 $1,150 (Unleveraged Gold1 Gold1 Initial Mine Life (Years) 10.0 After-Tax) Annual Tonnes Processed (Mt) 10.2 Free Cash Flow From Operations $1,190MM $1,038 MM Waste : Ore
Slide 9: Large Scale Oxide Deposit
Large Scale Oxide Deposit Initial 10-Year Mine Plan from 2.6 MM Oz P+P Reserves Tonnes Gold Grade Contained (000s) (g/t) Gold (Koz) Measured and Indicated 142,200 0.76 3,470 Inferred 72,200 0.55 1,280 Proven and Probable 102,653 0.79 2,606 • Waste : ore ratio = 2.2 : 1 • Life-of-mine gold recovery =
Slide 10: Project Financing in Place
Project Financing Project Financing in Place Total Financing (In MMs) Equity Headroom RCF / Orion $80 MM $23 Public Offering $29 MM Admin EBRD $9 MM & Fin. $45 Term Loan & COF RCF / Orion $160 MM RCF / Orion $14 MM Capex Capped Stream $370 RCF / Orion $60 MM Equipment Financing (Limited to $85 MM) I
Slide 11: Amulsar Development: 72% of Capex Committed
Amulsar Development 72% of Capex Committed1 Infrastructure • Construction power and water in place • Primary access roads complete • Construction warehouse erected • Detailed design and fabrication of site electrical distribution equipment in process • 250-bed hotel completely renovated for initial
Slide 12: Amulsar Development: Construction Continues to Advance
Amulsar Development Construction Continues to Advance Materials Handling System – Crushing, screening and conveying • Fabrication ongoing • Multiple components in transit • Initial components of conveyor on site • Concrete foundation blocks arriving at site now Heap Leach Facility (HLF) • Design com
Slide 13: Upcoming Milestones
Lydian International Upcoming Milestones • Complete major earthworks for the HLF, mine haul road, and barren rock storage facility • Complete civils for all components of site infrastructure and equipment • Erect buildings for the material handling system and the ADR plant • Fabrication and delivery
Slide 14: Comparable Development Stage Companies
Comparable Development Stage Companies Targeting to Re-Rate Central to Construction Strategy Further Upside – 46.3% 1.3x Implied Upside – 102.9% 0.8x 0.9x 0.7x 0.7x P / NAV 0.6x 0.5x 0.4x 0.4x Senior Producer Atlantic Gold Victoria Lundin Gold Pretium Belo Sun Pershing Gold Lydian Producer Market Ca
Slide 15: Investment Thesis
Investment Thesis Amulsar: High Quality Gold Asset Under Construction In construction, with 72% of capex committed Multi-million ounce deposit, with upside potential from current resource Low all-in sustaining costs to generate high cash flows Catalyst-rich year with construction milestones First go
Slide 16: Thank You
TSX: LYD THANK YOU
Slide 17: Appendix
Amulsar Gold Project Appendix 17 TSX: LYD
Slide 18: Board of Directors
Board of Directors Development Oriented – Independent, Diverse Experience Gordon Wylie, Non-Executive Director & Chair 32 years mining experience; AngloGold-Ashanti Global, Exploration manager Howard Stevenson, President & CEO 25 years global mining experience; former President & COO of Alacer Gold;
Slide 19: Board of Directors (continued)
Board of Directors (continued) Development Oriented – Independent, Diverse Experience Steve Altmann, Non-Executive Director Managing Director at Morrison Park; former Head of Mining at Desjardins; banking and corporate experience Josh Parrill, Non-Executive Director Resource Capital Funds; formerly
Slide 20: Management
Management Experienced, Committed to Construction Excellence Howard Stevenson, Hayk Aloyan, M.D. – Lydian Armenia President & CEO • 20 years mineral exploration and • 25 years global mining management experience experience • Armenian metallogenesis and • Alacer Gold President & COO resource speciali
Slide 21: Large Scale Oxide Deposit: Mineral Resource Statement
Large Scale Oxide Deposit Upside Potential from Inferred Resources Mineral Resource Statement AMC Consultants (UK) Limited - February 27, 2017 Quantity Gold Contained Silver Contained Tonnes Grade Gold Grade Silver Classification (000s) (g/t) (Koz) (g/t) (Koz) Measured 51,500 0.83 1,370 4.7 7,700 In
Slide 22: Large Scale Oxide Deposit: Mineral Reserve Statement
Large Scale Oxide Deposit Initial 10-Year Mine Plan from 2.6 MM Oz P+P Reserves Mineral Reserve Statement (0.24 g/t gold cutoff) Mine Development Associates, February 27, 2017 Quantity Gold Contained Silver Contained Tonnes Grade Gold Grade Silver Classification (000s) (g/t) (Koz) (g/t) (Koz) Proven
Lydian International — Sprott Natural Resource Symposium 2017 on 6ix